Project Power Plant

Location:
Hollywood, FL
Posted:
May 05, 2015

Contact this candidate

Resume:

Louis “Jay” Martin

**** ******** **.

Davie, FL *3314

954-***-****

******@*******.***

Professional Experience:

Pile drivers/Carpenters Local 1809: 2014 to Present

Projects: Various sites in South FL.

Position: Pile driver.

Duties: Worked varied piling and carpenter jobs from the union, mostly auger cast piles

and some form and scaffold work. Self employed, various soffit and fascia as well as

kitchen remodeling.

Nicholson Construction Company: 2013 - 2014

Position: Foreman.

Project: Atlantic Hotel in Miami Beach, FL.

Duties: Work with engineer on layout and placement of sheet pile perimeter walls.

Installed 40ft. to 55ft. sheet pile around perimeter of job site which encompassed a two

block area from 33rd to 35th St. and between Collins Ave. and Indian Creek Dr. with a ABI

crane. Predrilled excavation area with ABI. Unloaded and stock piled all whaler beams

and struts for the excavation of site. Assisted in the installation of 400 auger cast pile.

Began installation of handrail post and cable around perimeter of site. Mobilized and

demobilized.

Moretrench Construction and Geotechnical Services: 2013

Project: Flagler Memorial Bridge in Palm Beach, FL.

Position: Pile driver/welder.

Duties: Installed reaction piles, and test piles in two different locations. Set up and

welded false work. Installed 90ft. and 120ft. low headroom mini piles to stop the bascule

piers of the old draw bridge from settling as the new bridge piers were installed.

Mobilized and demobilized.

Betancourt Construction: 2013

Project: Broward Center for the Performing Arts in Fort Lauderdale, FL.

Position: Pile driver.

Duties: Drove sheet pile for open cut tunnel project.

HJ Foundations: 2013

Project: Port Everglades cruise ship terminal in Broward County, FL.

Position: Pile driver.

Duties: Installed 12in. to 36in. auger cast piles at Port Everglades for new cruise ship

terminal and expansion of existing terminals.

Ebsary Foundations: 2012

Project: Port Mayaca Levy Rehabilitation on Lake Okeechobee, FL.

Position: Foreman.

Duties: Analyze plans for marine and engineering projects. Contribute to work plan and

schedule formation. Implement work plan in the field through direction of crew and

consultation with superintendent. Monitor equipment and communicate with mechanical

staff. Daily liaison with G.C. and /or owner. Perform weekly safety toolbox talks.

Supervised a crew of three pile drivers and an operator. Job consisted of driving 1200ft

of temporary retaining wall consisting of 36in. by 194# beams with a sheet pile

interlocking every beam. This was for levy fortification and installation of new gates.

HJ Foundations: 2012

Project: Various condominium projects in Miami Beach, FL.

Position: Pile driver.

Duties: Installed 18in. to 32in auger cast piles.

Grundman Erectors: 2011

Project: Main Library Broward County, FL. and New Publix store in downtown Miami,

FL.

Position: Welder/Fabricator.

Duties: Erected temporary perimeter walls at the Main Broward County Library and

stairways at a new South Beach, Miami Publix grocery store.

DLS Prestressed: 2010 - 2011

Project: Various pump stations and other cofferdams, also various house and small

commercial buildings in south Florida.

Position: Foreman.

Duties: Analyze plans for marine and engineering projects. Contribute to work plan and

schedule formation. Implement work plan in the field through direction of crew and

consultation with superintendent. Monitor equipment and communicate with mechanical

staff. Daily liaison with G.C. and /or owner. Perform weekly safety toolbox talks.

Supervised a three man crew of pile drivers and two operators. Installed auger cast piles,

sheet pile cofferdams, whalers and braces. Installed concrete piles, pile caps, and precast

walkway for South Florida Water Management. Ordered materials, concrete, grout, etc.

and coordinated inspections.

HJ Foundations: 2009

Project: Florida Power and Light Martin County Solar Power Project in Indiantown, FL.

Position: Pile driver.

Duties: Installed 32in. and 24in. auger cast piles for Florida Power and Light Indiantown

Solar Power project.

Bunnel Foundations: 2008

Project: Various docks and marinas in Dade and Monroe FL.counties.

Position: Pile driver.

Duties: Removed damaged concrete docks and precast piles, and replaced with new.

Ebsary Foundations: 2004 - 2008

Projects: Florida Power and Light Indian Creek Substation, FL. underwater transmission

line. Port Everglades Bollard Structure replacement FL. Miami Intermodal Center,

Miami, FL. Various sheet pile coffer dams, and tremie anchors, and tremie pours in

south FL.

Position: Foreman.

Duties: Analyze plans for marine and engineering projects. Contribute to work plan and

schedule formation. Implement work plan in the field through direction of crew and

consultation with superintendent. Monitor equipment and communicate with mechanical

staff. Daily liaison with G.C. and /or owner. Perform weekly safety toolbox talks.

FPL Indian Creek Substation: Supervised a crew of four pile drivers and 2 operators

during the locating, exposing, repair and replacement of underwater transmission line.

Port Everglades Bollard Structure: Supervised a crew in the removal and

replacement of a bollard structure at Port Everglades. The old structure was knocked

over by a freighter and had to be removed from bottom of harbor and replaced with

new

24in. concrete pilings and a 6ft. by 30ft. by 30 ft. concrete cap with bollard.

Miami Intermodal Center: Installed and dewatered two 600ft. x 30ft. Cofferdams and

poured tremie seals after installing hold down anchors.

Various Sites: Supervised a three man crew of pile drivers and one operator. Installed

and removed various sheet pile cofferdams and whalers and braces. Drilled 18in holes,

grouted holes and installed Dywidag bars, nuts and plate washers to enable the pouring

of smaller tremie seal.

Morrison Knudson / Lane Joint Venture: 2001 - 2003

Project: McAlpin Lock and Damn Stabilization and dewatering, Louisville, KY.

Position: Foreman.

Duties: Analyze plans for marine and engineering projects. Contribute to work plan and

schedule formation. Implement work plan in the field through direction of crew and

consultation with superintendent. Monitor equipment and communicate with mechanical

staff. Participated in daily planning meetings with marine superintendent. Attended

safety classes given by Washington Group International and the Army Corp of Engineers.

Supervised a crew of four pile drivers and two operators crane on of 80ft x 175ft barge

equipped with a 300 ton crane. Erected two five tier template frames, one (80ft. by 30ft.

by 45ft.) tall, the other (100ft. by 30ft. by 45ft.) tall. Set larger frame three times, smaller

frame twice and dewatered each time for the placement of 22 concrete buttresses (20ft.

by 20ft. by 22ft.) Responsible for the set up of various cranes and other heavy equipment

and the installation of temporary dewatering pumps. Did all of the bull cooking.

W.L. Hailey & Company: 1998 - 2001

Projects: Kerrigan Diversion Structure in Nashville, TN. Sub-aqueous pipelines,

intakes, and outfalls in Columbia, TN. and Bessimer and Florence, AL.

Position: Foreman III.

Duties: Analyze plans for marine and engineering projects. Contribute to work plan and

schedule formation. Implement work plan in the field through direction of crew and

consultation with superintendent. Monitor equipment and communicate with mechanical

staff. Daily liaison with G.C. and /or owner. Perform weekly safety toolbox talks.

Kerrigan Diversion Structure: Mobilized to job site and used cadd to calculate

lengths of whaler beams and had all whalers prefabricated and ready for placement

during excavation. Drove 50’ sheet pile for five sided cofferdam. Supervised the

installation of all bracing and welding, excavation etc. There were 800,000 lbs of

sheet pile, whalers and beams in the structure. Also opened up a 16 ft.- 6in. Brick

sewer line and flumed with 16ft. 3/4in. steel pipe.

Pipeline River Crossings, Intakes, and Outfalls in TN. and AL: Drilled, blasted

and placed pipe for river crossings, intakes, and outfalls for wastewater treatment

plants. Supervised crew, managed reports, purchased materials, and scheduled

activities.

Scott Bridge Company: 1997-1998

Project: Second Avenue Bridge over CSX Railroad in Opelika, AL.

Position: Foreman.

Duties: Supervised crews that set MSE panels, placed rebar formed and poured bridge

abutments, crash walls, columns, and pier caps, set steel bridge girders, set overhang

brackets, armor joints and coordinated with railroad, managed reports, and scheduled

activities.

J. A. Jones Inc: 1997

Project: Montgomery Point Lock and Dam Desha County, AR.

Position: Foreman.

Duties: Mobilized cranes and barges, built templates for piling, unloaded materials.

Project was shutdown due to the Army Corp of Engineers expended appropriations.

C. J. Mahan Bridge Company: 1992 - 1993

Project: Central Bridge, Cincinnati, OH.

Position: Pile driver/welder/carpenter.

Duties: Constructed two cofferdams, and installed effco forms for piers and pier caps.

Drove concrete pile, set effco forms for piers and pier caps.

Great Lakes Dredge and Dock: 1991 - 1992

Project: Nashville Ave. Warf, New Orleans, LA.

Position: Foreman.

Duties: Supervised two crews of pile drivers and operators. Mobilized cranes and barges,

built templates, Set and drove 5,000 - 100ft. x 18in. concrete pile. Used two 250 ton

cranes one to stick pile the other driving pile. Removed and reset template. Kept daily

production log.

Boh Brothers Construction Company: 1990 -1991

Projects: Plaquemines Parrish Gate System for refreshing the swamp with fresh water

from the Mississippi River. Plaquemines Parrish, LA. City of New Orleans, Bus Station

and Repair Facility New Orleans, LA.

Position: Pile driver/welder.

Duties: Removed 1,500 flat sheet pile 70ft long and laid out on beams for cleaning and

sale. Drove 750 composite pile for bus station.

Whaling City Dredge and Dock : 1986 - 1990

Projects: Various projects through out CT, RI, and NY.

Position: Pile driver/welder.

Duties: Drove wood, concrete, steel, and sheet pile. Set up load tests. Set forms. Set

precast concrete dock sections. Dredged and installed outfalls. Tended divers.

Dick Corporation: 1985 - 1986

Project: AES Thames Cogeneration Power Plant Uncasville, CT.

Position: Foreman.

Duties: Supervised the setting of effco and Symons forms, anchor bolts, shot elevations.

Various Concrete and Drywall Companies in Dallas, TX: 1978 - 1985

Projects: Varied high rise office buildings, malls, strip malls, Texas Instruments.

Position: Carpenter.

Duties: Everything from setting forms, framing curtain walls on high-rises, setting door

bucks, hanging doors, and installing trim.

Osage/Grulich Construction: 1972 - 1977

Projects: Worked as a general laborer in Pittsburgh, PA. on a barge unloading facility for

U. S. Steel Homestead Works after graduating high school, and in the marine yard every

summer before graduating high school.

Position: Laborer.

Duties: Painted, welded, burned, repaired barges, cranes, tug boats, anything that needed

doing.

Education and Certifications

Bachelor of Science in Construction Management with a Minor in Labor Relations

GPA of 3.65

UBC Rigging Certification

UBC Signaling Certification

UBC Scaffold Certification

30 Hour OSHA

USACE EM385-1-1 Training Course

CPR AED & First Aid Certification

Lincoln Electric Welding School

Florida State Licensed General Contractor CGC#1515863

TWIC Card (Transportation Workers Identification Card)



Contact this candidate