PRANAT ADITYA AGRAWAL
*** ***** *** *****, *** #*24, ARLINGTON, TEXAS 76013 acp9l0@r.postjobfree.com 682-***-****
OBJECTIVE
Highly motivated Technocrat with technical expertise in Industrial Engineering, seeking internship opportunities to practical ly explore the theoretical
concepts and contribute to the organization.
SOFTWARE SKILLS
Simulation Tools: Witness
Statistical Tools: Tora, Lingo, MS Excel, MS Project, MS Outlook, MS Word and MS PowerPoint, VISIO, Pro-E, AutoCAD
Programming Languages: C, SAS, MATLAB
Expertise: 5S, Lean Manufacturing, Time and Motion Study, Queuing Theory, Non Linear Programming, TQM, Six-Sigma, MOST
EDUCATION
Master of Science, Industrial Engineering GPA: 3.67
University of Texas at Arlington, Arlington, Texas May 2016
Bachelor of Engineering, Electronics & Telecommunication Engineering GPA: 3.0
Pune Institute of Computer Technology, University of Pune, India MAY 2014
EXPERIENCE
Project Management Intern, RJ Engineering Systems, Houston, Texas May 2015
Assisting Project Managers of multiple projects involving engineered packages, fabrication & assembly, supply of valves, piping components,
instrumentation and electrical products
Review of Contract requirements and specifications and job specific deliverable and preparation of project schedules with mil estones.
Preparation of purchase requisitions in conformance to contract specifications, standards and practices
Assisting with ensuring compliance with existing company process standards including project engineerin g logs, production records, non-
conformance reports, change management and corrective action reports
Assisting with Inspection coordination of materials and processes, Quality Control, Inventory & Cost Control, managin g project schedules, milestones
and deadlines
Planning and managing logistics and shipping of incoming materials, in process inventory and finished products
Building Crew Lead, University of Texas at Arlington, Arlington, Texas November 2014 – May 2015
Predicted logistics for co-ordinating equipment with technical team by re-designing workplace layout for optimized movement of man and material
Planned the resource allocation, event scheduling, maintained data records applying 5S techniques successfully
Reduced manual time and effort in event setups by 15%
PROJECTS
Data Analytics for measurement of proportionality of human body using Biomechanics August 2014 – December 2014
Conducted F test and hypothesis tests creating linear regression model using R statistical package
Performed regression analysis and successfully verified the inference for the proportionality of human body
Successfully implemented the principles of probability to find its distribution technique
Analysis of Inventory Management of Perishable products using Continuous Improvement August 2014 – December 2014
Analyzing present condition and identifying the critical process of various inventory systems management techniques
Custom inventory system was recommended to meet the new time line in the chain
Continuous improvement and systematic work environment plan was prepared by creating and updating documentation through checklist and
flowchart and workplace diagram
Creating a Process Map for monitoring an Individual January 2015 – May 2015
Worked together as a team and prepared and analyzed individual basic process maps
Successfully prepared standardized process map along with 30,000 feet map for the process
Suggested JIT solutions and was able to successfully implement it and making its working feasible to use
Time study analysis for human effort considering Ergonomic factors January 2015 – May 2015
Observed and recorded the normal time for accomplishing the activity
Calculated the performance rating of the worker and applied allowance factor to find the standard time for the activity
Improved the efficiency of the labour by 50% and enhanced the productivity of work
Simulation and Optimization Project January 2015 – May 2015
Created a simulation model for a 1.0 Megawatt/Month photovoltaic (PV) panel production facility
Generated a process plan for the PV cell production process along with flow chart for this production process
Evaluated the capital investment along with developing a production process for 12 months periods
Developed and evaluated the model that can predict production line that meet the customer production specification
VIRTUAL DRUMS USING IMAGE PROCESSING, ROLE PLAYED - CODER AND DESIGNER August 2013 - May 2014
This project aimed at creating a virtual drum kit using Image Processing. The user placed itself in front of the camera provided in laptop
holding two sticks that has colored blobs over it. As the users moves the sticks pretending to play the drum, the motion of the blobs is
detected and corresponding sound of drum is obtained from speakers. It’s a real time project and was successfully implemented using
MATLAB
ACCOLADES AND ACHIEVEMENTS
Member of management team of Impetus and Concepts (INC), a national level technical event held in college, for three years in a row, which
witnessed a footfall of more than 50,000 students
Represented college and won various dance competitions during my undergraduate program along with founding a Dance Academy wi th 150
students. Conducted dance workshops for kids ones a month