ESHA CHOUDHURY PRASOON
E-mail: ****.*********@*****.***
****@*******.**.**
Contact: 097********
OBJECTIVE To seek a challenging and rewarding career in the industry as a Project Manager where I can contribute my knowledge and skills for the growth and development of the organization and to be able to provide solutions using my technical and managerial expertise.
EDUCATION
Post-Graduate Certification in Business Management from XLRI, Jamshedpur.
B-Tech in Computer Science Engineering, graduated in 2008 from Biju Patnaik University of Technology, Orissa
I.S.C in 2004 from Sacred Heart Convent School, Jamshedpur
I.S.C.E in 2002 with from Little Flower School, Jamshedpur
SKILLS SAP ERP (ECC-6) - Plant Maintenance
- Project System
- Master Data Management
EXPERIENCE
Currently working in Adhunik Power and Natural Resources Limited, Jamshedpur
Job Title: Sr. Engineer
Platform: ECC6
Modules: Plant Maintenance, Project System & Master Data Management
Deliverables/Responsibilities:
PLANT MAINTENANCE
Responsible for performing current state analysis, defining systems strategy, developing system requirements, designing and prototyping, testing, training, defining support procedures and implementation.
SAP PM Configuration that includes Preparing of Planner Groups, Technical Objects, Plant Section, Planner Groups, Locations and configuration of Order Types. Creation of Functional Locations, Equipment and BOMs for General and Breakdown Maintenance, for both UNIT-I & UNIT-II.
Email alert system developed while notifications created into SAP, system sends auto generated email to respective departments, whenever new notification entered.
Plant Maintenance mail triggered for pending preventive orders exceeding 30 days.
For Equipment, developed additional BOM quantity check (to raise purchase requisition), other than BOM quantity.
Spare parts procurement and consumption locking into PM system, it allows procurement and consumption only against PM orders. Configuration done on Procurement / Consumption posting not allowed if spare part is not register for Equipment. Reservation/Indent quantity cannot be higher than spare part BOM quantity. Also, pending PM Order categorization i.e. Permit not issued, spare part shortage & man power not available for MIS purpose & daily reviewed.
PM Purchase requisition cum decision print-out generated with all details regarding the material i.e average life, budget, last procured vendor etc.
Why Why Analysis implemented with hard copy print-out facility.
Training provided on
Plant Maintenance overview and the process walk through provided to all HODs and users.
PM Training provided to APNRL HoDs and Users
1.Spare parts Consumption monitoring - Equipment wise, Components wise, Cost-center level and Function location level
2.Plan & Scheduling monitoring - Plant monitoring, Schedule monitoring & maintenance, Preventive Maintenance order review
3.Critical Equipment & Why-Why linkage & monitoring. : Why-Why Analysis w.o.w. reference to critical equipment or critical notification.
4.MTTR & MTBF Analysis – Mean time to repair and Mean time between failure analysis
5.Shutdown Maintenance & linking PM activity with Shutdown Maintenance.
Alert for AML Plant maintenance pending orders developed - Alert generated on regular basis for the pending PM orders past 30 days. In addition, Z-report ZPMPLAN developed for AML Preventive Maintenance - The AML Z-report displays plan category, planner groups, equipment, tasklist with operations, counters, plans and text, cycle ant unit etc.
Condition based Maintenance implemented by creating Measuring Point with reference to Equipment or Functional location. The Unit of Measurement for Measuring Point is to be created first, also, Measuring Point Category is to be segregated. Tolerance limit (upper limit or lower limit for each Measuring point) provided. Use "IMRC0001" User Exit, this will trigger a notification if measuring document value is exceeded then tolerance limit maintained in Measuring point. Checking the notification through IW22 and then follow the Preventive Maintenance process.
MRP configured based on consumption based planning. Re-ordering Point defined based on safety stock, replenishment lead time and average consumption. Manual re-ordering point determined by MRP controller, by using indicator VB, when the quantity less than the re-order value, procurement triggered. Similarly, the automatic re-ordering is system configured and works on the forecast.
Settlement profile is set after performing a check for the assignment of order type to the settlement rule in SPRO, settlement rule time defined and distribution rule created. The settlement profile created (CO module). Then this settlement profile is attached to all the order types maintained for the particular plant.
In PM, MTBR - Mean Time Between Repair and MTTR - Mean Time To Repair
was calculated or observed in IW39 (PM orders list), then using t-code MCJB, equipment wise (monthly statistics) generated.
PROJECT SYSTEM
In APNRL Project UNIT-I & II, configuration i.e Project Profiles, Budget Profiles etc. and alignment WBS/Network/Activity set-up as per the need, in discussion with Project, Material and Finance team. Budget functionality implemented into SAP, budget data input into the SAP system and managing the Release Control. For, Phase-II (Unit-3 and Unit-4) – Project system WBS and other PS working put in plan into SAP. WBS/Network master data support for MP Super Thermal Project (JSR), Stage-2.
Other Site projects:-
oBalumath project, complete PS setup including Project creation, WBS/ Network profile set-up, Budget set-up with commitment verification.
oAAPL SMS PLANT ENHANCEMENT has been created in plant 4000 JSR-ENH-0001 project has been created with WBS, Network and Activity. Budget availability and Release control activated.
oNew project "ROURKELA SUPER DRI PROJECT - RKL-DRI-0004" created.
SAP Up-gradation from ECC5 to ECC6:
The complete check of Project System database of different locations projects, with proper functioning of all PS related t-codes and no inconsistencies observed. The Project Master Data un-altered with verification of budget, release control, cost and commitment. Values generated in reports aligned.
Training provided on Project System awareness- general overview and understanding on WBS/Network master data and on Pre-Operative re-alignment.
MASTER DATA MANAGEMENT & DOCUMENTATION
SOPs created for Vendor, Customer, Employee and Assets.
Vendor creation functionality online Vendor form creation online
Master Data handled for Adhunik Power and Natural Resources Limited. i.e creation, extension and updation etc.
Support for Indent creation for APNRL SAP services.
SAP Project System and Alfresco (Document Management System) drawings/documents – WBS level document linking Alfresco, user-ids creation with required authorization for different plants.
Alfresco template prepared for Adhunik Metaliks Limited and Orissa Manganese & Minerals Limited for implementation in respective plants.
ALFRESCO – Document Management System prepared and managed.
Unit & Integration test scripts prepared.
End user training manuals preparation.
From June-09 to March-10 worked on the payroll of IGS
Job Title: PM Support Consultant
Platform: ECC6
Modules: Plant Maintenance
Deliverables/Responsibilities:
Gathering the Plant Maintenance process info by interacting with key users.
Masters: Creation of various functional locations. Equipment and their Structures and Bill of Materials, Location, Plant Section, Planner Group, Work Center, Measuring points. Time based and performance based maintenance packages. Task list. Single cycle. Strategy based and multiple counter maintenance plans.
Creation and configuring of PM Master Data.
Configuring & managing the Technical Objects Equipment master, Functional locations, Work center, Task list, Maintenance plans, Bill of Material.
Creation of Maintenance Task Lists, Maintenance Items, Maintenance Strategy, Creation of Maintenance Plans for Single Cycle plans, and Strategy controlled and multiple plans. Maintenance Plans Scheduling using back ground jobs
Configuration of Maintenance notifications.
SAP Learning –SAP PM Certification from IGS (INFORMATION GLOBAL SERVICES),
(Feb-09 to Mar-09)
Cracked Infosys Technologies Limited through College Campus
(Duration -Jul’08-Dec’08)
Job Title: Engineer Trainee Platform: Mainframes
PERSONAL DETAILS Name: Esha Choudhury Prasoon
DOB: 29th March, 1986
Sex: Female
Marital Status: Married
Nationality: Indian
Passport: Yes
Contact Details: B-1/5, Gautam Apartment,
Opp. K.D Flat 9, Kadma, Jamshedpur-831005
Languages Known: English, Hindi, Bengali and Oriya
Esha Choudhury Prasoon
16th May, 2015