Jason Walsh
Niagara Falls, Ontario
L2J 4K8
*************@*****.***
Strengths
Works well with others
Supervisory experience
Attention to detail
Problem solving skills
Excellent analytical skills
Excellent leadership qualities
English and French (written and oral)
Works with a high level of safety awareness
Education
Electrical Apprentice Training GMAW Practical Training
Mohawk College Nagy’s Welding School
Stoney Creek, On Welland, On
Professional Locksmithing Electronics Engineering Technician Program
Harcourt Learning Direct Niagara College of Applied Arts & Technology
2001 Welland, On
1997-1998
Work Experience
Licensed Electrician
309A – Interprovincial (Red Seal)
Tron Construction and Mining
Quality Coordinator (E&I)
Substation Upgrade
McArthur River, Saskatchewan
February 2015 to Present
Develop Inspection and Test Plans, provide guidance to electrical field inspection personnel, develop inspection packages for field inspectors, review inspection and test documentation, ensure quality activities are in accordance with ITP and site requirements, communicate with client representatives to resolve quality related issues, attend weekly progress meetings, track inspection progress, coordinate final walkdowns with client, prepare turnover binders and documentation for final turnover.
Fluor Canada
Quality Assurance Inspector (E&I)
Chevron LNG Project
Kitimat, BC
April 2014 to September 2014
Under the direction of the site quality manager, act as client representative relating to on site quality, create contractor surveillance reports, non conformance reports and corrective action reports. Ensure contractors execute construction activities by following their approved ITP and site specifications, provide direction in resolving quality related issues, attend system walk downs with the contractor and attend quality related meetings with contractors
Studon Electric & Controls
Project Quality Lead/Inspector (E&I)
Interpipeline Lamont PX6 Pump Station
Lamont, Alberta
January 2014 to April 2014
Duties include oversight for all quality activities on site. Ensure ITP and client specifications are followed during construction activities, prepare and carry out quality inspections of all construction installations, submit RFI’s (request for information) to the client, prepare final turnover binder, redline drawings and cable schedules, carry out duties of site document control, direct daily duties of inspectors on site.
Sascal
QA Inspector (E&I), CMO
Cameco Cigar Lake Uranium Mine
Cigar Lake, Saskatchewan
August 2013 to December 2013
Quality assurance inspections, walk down systems with contractor, review of contractor documentation such as inspection reports, ITP, TCCC and sign off as the client representative. Meet with contractors to review how documentation is to be turned over and ensure that project timelines are met.
Studon Electric and Controls
Project Quality Lead Cross Shift (E&I)
Meg Energy Stonefell Terminal Project
Edmonton, Alberta
June 2013 to July 2013
This was a short term project to help push for final turnover. Duties included managing day to day operations in the QA office, preparing binders for turnover, reviewing test reports, planning workload for inspectors, attending daily progress meetings, ensuring systems are turned over within specified deadlines. Submittal of RFI’s (Request For Information), FCR’s (Field Change Requests) and ensuring changes in engineering are carried out in the field.
URS Flint
Senior E&I QC Inspector
Meg Energy Christina Lake Project
Conklin, Alberta
Jan 2013 to June 2013
Duties included inspections and testing of electrical systems, ensuring installations conform to code and customer specifications, completing inspection reports, reporting deficiencies using punch lists, use of insulation resistance test equipment, continuity testing, torqueing bolts to manufacture specifications and system walk downs with the client.
Chemco Electrical Contractors
Electrical QC Inspector
Co-Op Oil Refinery
Regina, Saskatchewan
Aug 2011 to Feb 2012
Duties Included inspections and testing of electrical systems, ensuring installations conform to code and customer specifications, completing inspection reports, reporting deficiencies using punch lists, use of insulation resistance test equipment, continuity testing, torqueing bolts to manufacture specifications.
Chemco Electrical Contractors
Electrical QA/QC Foreman
Co-Op Oil Refinery
Regina, Saskatchewan
Feb 2012 to June 2012
Duties included supervision of QA/QC inspectors, distributing workload to inspectors on a daily basis, ensuring inspections of electrical work were carried out in a professional and timely fashion, completion of progress reports, ensuring deficiencies were corrected by construction personnel, completion of time sheets and assuming general foreman duties during absences. While assuming general foreman duties, I would supervise the duties of foremen in the QC department. Inspections carried out included power and lighting systems, instrumentation, grounding and bonding, DCS cabinets, switchgear and transformers.
Plan Group
Construction Electrician
Niagara Health Services
St. Catharines, Ontario
Feb 2011 to Aug 2011
Duties included interpreting blueprints, installation of various electrical systems such as conduit, wiring, distribution panels and emergency power systems.
BFI Electrical
QA/QC Inspector (E&I)
Potashcorp Cory Mine
Saskatoon, Saskatchewan
Jul 2010 to Dec 2010
Duties included inspecting work carried out by the construction crew to ensure it conforms to code and customer specifications, completing inspection reports, reporting deficiencies through use of punch list, use of insulation resistance testing equipment and multimeter to ensure all systems are in proper working order, torqueing bolts to manufacturer’s specifications.
BFI Electrical
QA/QC Inspector (E&I)
Bio-Exx
Saskatoon, Saskatchewan
Feb 2010 to Jun 2010
Duties included inspecting work carried out by the construction crew to ensure it conforms to code and customer specifications, completing inspection reports, reporting deficiencies through use of punch list, use of insulation resistance testing equipment and multimeter to ensure all systems are in proper working order, torqueing bolts to manufacturer’s specifications
Chemco Electrical Contractors
QC Inspector (E&I)
Potash Corp
Saskatoon, Saskatchewan
Mar 2009 to Feb 2010
Duties included inspection of electrical systems installed by construction crew, ensuring installations conform to code and customer specifications, completing inspection reports, reporting deficiencies on punch lists, use of insulation resistance testing equipment and multimeter to ensure all systems are in proper working order, torqueing bolts to manufacturer’s specifications.
Highlights
In the electrical trade since 2002
Dean’s list for academic achievement during trade school studies
Excellent PLC, electronics and circuit analysis skills
Safety awareness – Obtained through various safety courses such as WHMIS, confined spaces, Hoisting and rigging, lock-out / tag-out, CSTS
Available as sub contractor