Post Job Free
Sign in

Pipeline /Project/Construction Manager

Location:
Houston, TX
Salary:
140,000
Posted:
June 07, 2015

Contact this candidate

Resume:

RODNEY H PATCH

***********@***.***

281-***-**** Cell Houston, TX

May, 2015

SUMMARY OF EXPERIENCE

Over Forty five (45+) years of petroleum related construction experience including Pipeline projects, below and above water, onshore and offshore, on platforms and barges. Have worked in various roles such as Project, Construction and Start-up Manager, Chief Pipeline Inspector, Project, Mechanical, Piping, Start-up, Area and General Superintendent. Work experience also extends to Pipeline Consultant, General and Multiple Crafts Foreman for Construction, Pipeline, Shop and Field Inspector QA/QC, Construction and Inspection Coordinator.

JOB TITLES

Welding, Utility/ all phases of Pipeline Inspection

Mechanical & Piping Superintendent

Assistant & Chief Inspector Pipelines Onshore and Offshore

Pipeline Superintendent

Area Superintendent

Onshore/Offshore Construction Manager

SR Construction Manager pump stations

Site Construction Manager

Start-up Coordinator

PERSONAL DATA

Residence:

Houston, Texas

**SCHOOLS:

As of 4-16-2015, I have become an online student of ASHWORTH COLLEGE to get my Construction Manager Certification

(Brushing up on what might be new.)

EQUIPMENT/COMMODITIES/SPECIALTIES

Pipeline Installation 36+” Pipeline

Pipeline Maintenance Pipeline Fabrication

Offshore Pipeline Lays Hook-Ups

DOT Pipeline Upgrades Pipe Spools

Setting of Hull & Topside 6500 Tons

Deep Water (4000+’) Offshore Pipeline Lays, Phlem, Plet and Umbilical Fabrication & Installation

20" X-70 Pipeline

Offshore Single Module Gas Compressor

Packages

Installation Of Cross-Country Fiber Optic

Cables

Well Head to Flow Line Tie-In Piping

Riser Installations

Cat Stripper, Reactors, Platformers

Refinery New Construction & Turn-a-Rounds

Shop Inspection: Heater Treaters, Injection Skids, Amine & Glycol Reboiler Packages and Contactors, fab & retraying, High Pressure Inlet Separators & Scrubbers, Filters, Inst. Air Compressor Packages, Complete Gas Compressor Packages, Heat Recovery Ducting Units.

Side Tap Assemblies

1400 Ton Deck Sections

300 To 400 Ton Generators

72’ Pentane Spheres (CB&I)

Deep Water Well Tie-Backs (200' to 450’)

Crude Columns

Gas Compressors and Pump Station

Installations

CERTIFICATIONS/TRAINING

HOT WORK.

LOCK0UT/TAGOUT-CONTROL OF HAZARDOUS ENERGY.

CONSTRUCTION LOCKOUT TAGING OF CIRCUITS.

TRENCHING & EXCAVATION SAFETY.

PERMIT AND NON-PERMIT CONFINED SPACES.

CONFINED SPACE ENTRY COMPETENT PERSON/SUPERVISOR.

DOT Pipeline Certified (Veriforce) VF-100,

102, 202, 203, 208, 304, 408, 501, 607, 427-I, PE-911, ELP-002PIP

DOT Pipeline Certified NCCER – AOC- Gas/Liquid. PMT Pipeline Maintenance

OQ’d to all Kinder Morgan (California) pipeline inspection jobs.(liquids)

USAFI 2 years collage equivalent - Engineering

U.S. Navy-Submarine, 2nd Class Diver's Training

Machinist - Tool and Die Training

Certified Welder ( Have Been ) API 1104 - SMAW B.31.3 - GMAW, D2.2- SMAW & GMAW

Construction Diver and Supervisor - 8 years,

+ U.S.N. 3 Yrs.

U.S. Passport I have a new one, good for 10 yrs.

Tank Construction, Erection & Repair to API-650

API 14C, T- 2, Certified, Offshore Control Systems

TWIC card, expires 18 April 2017

LANGUAGES

English (Comprehension, Writing, Reading)

Spanish (Comprehension, Writing, Reading)

PROFESSIONAL WORK HISTORY

Sept. 2014 to Oct. 2014

QIS Chief inspector

Doing a 2 week turn-a-round for Williams Markham, TX. The replaced and installation of a new compressor/expander. This was completed ontime.

Aug. 2014 to Sept. 2014

TIR ---Construction Supervisor 1

Installing a condensate loading terminal for DCP. The job was finished within the time scope allowed by DCP.

Oct. 2013 to July 2014

CSD Engineering

SR Construction Manager for 20 Pump Stations

Started as a Construction Manager for 51 miles of pipeline. I was personnel Construction Manager for 2 spreads. Once they started the pump stations, I was made SR Construction Manager in charge of 20 pump stations, which 6 or 7 stations were being worked at, at the same time. I had 2 construction managers working for me. one having the West stations and the other having the East stations. There was a total of 16 inspectors working for me. These stations went from Washington, PA to Philly, PA

Aug. 2013 to Oct, 2013

Gulf Interstate

Assistant Chief Inspector for 80 Miles of 10” pipeline running from Tioga, ND to the

Canadian Border. Doing different inspections as needed, taking all the daily reports

from the other inspectors and making a daily report for the Chief Inspector.

Sept. 2012 to Aug. 2013

Mustang Engineering ( Pipelines ) Houston, TX

Pipeline inspector for Kinder Morgan ( California )

Responsible to Kinder Morgan for pipeline safety during construction close to KM Lines.

Jan 2009 to Sept. 2012 (Intermittent)

Intertek

QA/QC Inspector Field and Shop

Performing various inspections and expediting activities on site and at vendor facilities during manufacture, fabrication, installation and operational testing (FAT’s). Verification of vendor compliance to purchase orders and specifications.

March 2012 to July 2012

Tulsa Inspection Resources 918-***-****

Chief Inspector for Enbridge in Venice, LA

VCSE Project ---3 Contractors

Dec. 2011 ---3 days

Steel Pipe and Tubing 337-***-****

Welding Inspector -3rd party inspection for qualifying 6 welders to API 1104 in SMAW & FCAW

For an offshore pipelay.

August 2011 to October 2011

QIS ---Markwest in PA 580-***-****

Chief Inspector on a Compressor Station.

This was a temporary job, until another Markwest chief finished up another station and became available.

July 2010 to Aug. 2011

Universal Pegasus 713-***-****

Welding Inspector / Chief Inspector Florida Gas Transmission Phase VIII, Expansion Project

Preformed all the different inspections for a tie-in crew. Did welding audits on the welders for each tie-in, each day. Made sure that all trenches met OSHA safety standards. Made sure that everything done on my spreed, was done to Florida Gas Transmission, OSHA< & Sheehan ( contractor ) standards. Verification that every act of work, was done by a person that had an OQ for that job, or had a person with that OQ, watching over the person doing the job. Chief Inspector over Meter and Regulator Stations.

Jan. 2009 to July 2010

Intertek-WISco 281-***-****

QA/QC Inspector

Performed various inspections and expediting activities on site and at a vendors facilities during the fabrication and operational testing of a PLET and a PLEM. Verification of welding procedures spec’s

(WPS) for each weld made.

OCEANEERING

REX East Pipeline – Kinder Morgan – Pipeline

Oct 2008 to Dec 2008

Mustang Engineering, Houston, TX

Utility Inspector

Road bore inspector for a PMI (PEMEX) Pipeline being installed in El Paso, TX.

Most bores were done by directional drilling, Main highways were cased.

Sep 2008 to Oct 2008

TransMontaigue in Port Everglades, FL

Chief Inspector

Overseeing a pipeline Contractor that was installing 4 pipelines alongside their existing pipelines, making sure they didn’t get close or hit the lines.

May 2008 to Aug 2008

Mustang Engineering, Houston, TX.

Inspector

Road and RR bore inspector on the MinnCan 24” pipeline (Henkles & McCoy) in Minnesota, to the refinery in Farmington, MN.

Aug 2007 to Mar 2008

SPT Energy Group, Abbyville, LA.

Senior Inspector

Fabrication of pipeline, riser clamps and riser and installation of the above in 455’ of water in the Gulf of Mexico. His included the Sub Sea Tie-in

Mar 2007 to July 2007

Williams E&C Midstream, Houston, TX.

Inspector Coordinator-Chief Offshore

Overseeing the installation of a Hot Tap, installation of a side tap assembly, Pipeline installation, connecting to the side tap assy. testing, and commissioning of the line (Sub Sea). Deep water Xings and mat placements.

Mar 2006 to Mar 2007

The Clement Companies – Dade, La. –

Offshore Construction Manager

Overseeing well conductor and platform/piping repairs for APACHE Corp. All the inspections & QA for acceptance of work done, for the repair of damage done by the hurricanes in 2005. Rework and rebuild of tankage to API – 650.

Sep 2005 to Mar 2006

Fluor – Greenville, S.C. YAMBU, Saudi Arabia

Construction Superintendent

Installation of a new section and upgrade of a polymer shipping chips plant.

Overseeing the installation of Mobil Homes, Park Trailers, and they had to be installed to FEMA and local regulations. Travel Trailers in the Lake Charles area ( District 4 ). QA/QC of all installed units.

Mar 2005 to Sep 2005

Mustang Eng. Houston, TX. For Hunt Petroleum – Houston

Construction

Manager for deep water (385’) offshore pipeline lays, tie-ins to side taps, Tie-ins to risers, Riser installation, hydro testing & dewatering of various lines. QA inspection and acceptance of fabrication of tie-in pieces & risers to API 1104.

Mar 2004 to Mar 2005

Fluor Daniels & Williams Bros. Sugarland, TX

Chief Pipeline Inspector

Fed DOT pipeline upgrade, Wood River 12” hydro’s from Ponca City, OK. to Glen Pool, OK. Monitored and approved different hydro tests to up-grade the pipeline.

Nov 2003 to Feb 2004

Fluor Arabia Ltd.

Area Superintendent

In a petrochemical plant in Yambu, Saudi Arabia. In charge of the Polymer area to make sure the all the upgrades and new systems were installed correctly and on time during a plant shutdown. Fabrication of Storage tanks to API – 650.

Oct 2003 to Nov 2003

OCI Houston TX. For Gulfterra (El Paso)

Construction Manager

Offshore admin for the installation of Marco Polo (TLP) pile and tendons F 4300, hull & topside 6500 tons. Inspection for pipeline installation.

May 2002 to Oct 2003

Construction Management Group, Mustang Engineering Co.

Construction Manager

Caracas, Venezuela, Curacao, N.A., Trinidad /Tobago, W.I.

Made 4 constructability studies for PDVSA. These were: The setting of an Amine contactor, 85’-6” X 12’-0”dia. & an Amine K.O. Drum (Vert.) 38”-0’ X 10’-0”. The complete retraying (33) trays, of a Naptha Splitter. The building of a 72’ pentane sphere and the building of a complete ISAL Unit, including the setting of a debutenizer 150’ X 16’, 2 – reactors that weigh over 180 ton each. Made 3 constructability studies for Isla Refinery in Curacao, of an addition of a new ISAL Unit and an addition of a new reactor for Platformers. Construction Manager for Deep Water Well Tie-Back and platform up-grade. Acceptance of all QC works to various codes, for vessels, piping, electrical and instrumentation. This work included a 24’’ pipeline to the beach of 83 kilometers. The multiple tie-ins and setting of an new HP Separator, Hipps Skid and tie-back to the new wells (600ft. water depth). Spent a short time in EG Africa.

Nov 2001 to Apr 2002

Fluor Maintenance Group – Houston,

Mechanical & Piping Superintendent

Superintendent on night shift for a refinery rebuild (Crude Unit) in Lemont, IL.

I was responsible of each of the 3 Mech./piping contractors to get started on the fire rebuild, including the start of installation of the 28 down comers on the crude column, 24’ X 153’. After getting these contractors started, I was in charge of 2 of these contractors for most of the time. This was a major fire rebuild with over 5000 spools that were installed. This was done in less than 6 months. My contractors had the best safety audit averages, because I motivated them to have safety awareness and good housekeeping.

Jun 2001 to Oct 2001

Chief Inspector/ Pipelines and facilities –ONEOK Gas Transmission Line, Tulsa, Ok

Chief of Inspection

Made hot tie-ins to lines. I made daily reports as to actual progress. I accepted facilities and completed pipelines to API 1104 & B31.8. I had the contractor work to an ecological and environmentally safe way of installation.

Apr 2001 to May 2001

Parsons Construction Services, in Maturin (Boqueron) Venezuela

Area Superintendent

E/I and piping. Set 2 – 250 ton compressor and driver units, Mammout did this. The client Company decided that they were over budget.

Aug 1999 to Aug 2000

PIC of Marietta, Ga. for Siemen’s Mexico, in Mexico

I/E Construction and Commissioning Manager

Hired 8 of the 12 pump station supervisors and got them set up. Took care of, on a day-by-day basis, all of the engineering and problems that this job entailed. These 12 PUMPSTATIONS were spread over 1200 Km. distance from one end to the other end. Logistics was terrible. Made sure that all the protocols for turnover and start-up from each station superintendent were correct and complete.

Apr 1998 to Dec 1998

Mustang Engineering, Houston, TX. In Nigeria (MOBIL OIL) and in Argentina for (Gasoducto nor Andino) - (Southern Energy)

Construction & Start-up Coordinator

Revamp and addition to QIT oil storage facility and construction of 2 new 750,000 BBl

Oil storage tanks in Eket, Nigeria

In Argentina - Site Construction Manager - 5 months

Day by day- Owners management of the construction of 115 kilometers of 20" X-70 pipeline, being installed by Techint, from Pichenal (elev. 280 Mts.) to Abra de Zenta (elev. 4250 Mts.).I had 15 inspectors and 5 people in my environmental group. Day by day communications in Spanish, reports done in English.

Feb 1997 to Mar 1998

ABB Randall Corp. Houston, TX. In Pucallpa, Peru

Pipeline Construction Coordinator

Liaison between (client) Aguaytia Energy (Duke Energy) and Bolinter from (Bolivia) (pipeline contractor) for ABB Randall Corp. for the installation, inspection, all documentation for turn over to the client and start-up of app. 300 Km. of 2", 3", 4", 6", 10", 12" pipeline (including the gathering and re-injection lines), from the Amazon jungle into the foothills of the Andes Mountains. All communications were in Spanish.

Nov 1996 to Jan 1997

CBS Engineering - Houston, Texas, Gulf of Mexico, Mexico

Chief Inspector

Walked out and up-dated P&ID'S for 6 platforms. Did an API 14C safety audit of 48 offshore platforms and an 850mmf/da. Gas plant for PEMEX de México. All meetings and communications were in Spanish.

Feb 1996 to Oct 1996

Staatsolie Oil Co. of Suriname

Consultant

Responsible to Staatsoile for the construction and start-up of a 10,000bbl. /da. De-watering/treating facility, app. 10Km. of 10" pipeline and a 6,000bbl. /da. pump station.

May 1995 to Dec 1995

Fluor/Daniels -- Escondida, Chile South America

Pipeline Superintendent

Responsible for the installation, inspection, testing, documentation and the start-up of app. 120Km. of 4", 6", 10", 20", 24", 34" pipeline, hook-up of 26 well sites and a 270,000 Gal./min. pump station. The pipeline contractor was Techint (Argentina).All documentation and meetings were in Spanish.

Jan 1995 to Apr 1995

Fluor/Daniels Taft, La. for Union Carbide

Area Superintendent

Took the P& ID’s, walked out the systems to see if in fact everything was in place as per P&ID, if not, wrote up notification of the discrepancies. After corrections, would allow the testing of each system to take place, walk them down and accepted them for Union Carbide when acceptable. Completed all the paper work for the acceptance of the systems as they were completed.

Sep 1993 to Nov 1994

CBS Engineering

Construction & Start-Up Superintendent

Grass Roots installation of a 10,000 BBL. /day. Treating, Dewatering, Pumping and Storage Facility in Venezuela. In charge of all the construction, I/E, inspection, QA/QC acceptance and start-up of this facility. This included a Westinghouse 501 Simple Cycle, of which I was responsible for hook-up and commissioning. This was a complete Spanish Contract including Contracts, Contractors, Documents, Labor and Direction.

Dec 1992 to Jul 1993

Fluor Arabia Ltd.; Saudi Arabia for Aramco

Area Superintendent-Onshore/Offshore

For the Onshore Part, I coordinated with the Contractor to make sure that over 2,000 Large Bore (8"-36") Heavy Wall (.500-1.875) Pipe Spools were fabbed, X-rayed, Stress relieved, Sand Blasted, painted and then shipped Offshore for a 9 platform turn-a-round and upgrade from ANSI 150# systems to ANSI 300# systems. Offshore I was the turn-a-round and start-up Superintendent for a Platform Complex (3 Platforms). This was a 30-day shut down. The platforms were completed and started up in 21 days.

Oct 1991 to Aug 1992

Staatsolie Oil Co. Of Suriname, South America

Chief Consultant & Superintendent

Responsible to STAATSOLIE to order all the major equipment, review and order all the major materials, make a detailed time schedule as to material & pipe placement, labor and equipment locations and time allotments for the countries first major pipeline - 14" .250 wall X-60 pipe-55 kilometers long. This included 17 road crossings, 2 river & 4 canal crossings, 3 road bores, 1 push/pull area of 8 kilometers and app. 4-5 kilometers of Terrain that was underwater. I was also in charge of building 2 pump stations and one receiver station, (Tie in to existing facilities) 3 areas. My responsibilities included, leveling 4 pumps, and all the piping and hot Tie-ins, setting and piping up the pig launcher and pig receiver, all the instrumentation, monitor the training of 35 welders to API 1104 and 4 welders to B.31.3. Also, testing of the total pipeline to 1800 PSIG and all the pump stations, launcher and receiver to 1800 PSIG. I set-up the QA/QC procedures for his complete project. Taught the people how to operate 571's and 572's side booms. In charge of start up. The job was completed without a loss time accident.

1990 to 1991

Williams Bros.

Senior Inspector / Start-up Superintendent

Shop inspector for the fabrication of two 2600 HP offshore single module gas compressor packages. The installation, hook-up and start-up of one of these units. The installation of four 1000HP gas compressors, the complete compressor station to include the DeHy unit and all associated equipment. Plant start-up. Installation, hook-up and commissioning of a Westinghouse 501 Combined Cycle Unit, for thermo reinjection, in California.

1988 to 1990

Williams Bros.

Chief Inspector/Shop Inspector

Inspect and accept offshore pipe lays riser installations, setting of platforms, the pile-driving, and pipeline mechanical hook up. Inspection and repair acceptance of oils storage tanks of API 650 Code and API 1104 for lines connected to the tanks. Inspection of 95 miles installation of cross-country fiber optic cable, this includes installation of many regen-stations and splices each 15,000 ft.

1987 to 1988

Brown and Root, Houston, Texas

Coordinator/Superintendent

Planning and scheduling of major demolition and reconstruction of the internals a 50,000 bbl/day cat regen, cat stripper, and reactor. Also Alky, HCU, MEK, CCU, Merox, Toppers, Udex, and Platformers units for Marathon Oil Texas City, TX. and Norco, LA.

1987

Citrus Hill - Frost Proof, Fl.

Instructor

Teaching employees the operation and maintenance of citrus processing equipment and machinery; Fl.

1986

Arco Oil & Gas, Houston, Texas

Chief Inspector

Construction inspection of a 60,000 bbl/day NGL pump station: authorized field construction changes and made all as-built drawings.

1985

Williams Bros.

Piping/Mechanical Superintendent

Grass roots project on construction a 160,000 bbl/day, oil dewatering facility. Fabrication and installation of well head to flow line tie-in piping. Responsible for two 16-man crews laying two 12" lines through the Llanos, including two river crossings where the push/pull method was implemented. Fabrication of oil storage tanks to API 650. These jobs were simultaneously in the Llanos area in Columbia, South America, monitoring and trouble shooting fabrication of ASME rated heaters and pressure vessels for our project. Then went to the area of construction, ordered out tools and took charge of the piping, welding and rigging and the tank erection crews. All directions, such as, tool and material orders, were given in Spanish

1985

Piping Foreman

Supervision of pipe fitter, welders, and insulators on construction of a rock refinery facility in VA. Orders most of the tools used by the pipe fitters, welder, and insulators. Instructed and supervised these crews how to do there job safely, orderly and in a professional manner within a completion date and time frame. Plant start up.

1984

Brown and Root

Area Supervisor

Supervision all crafts and turn-a-rounds, petro-chemical, and plant maintenance projects in the Houston Area.

1983

Pyle Const. Edmond, Ok.

Project Superintendent

Construction, additions, and remodeling of fast food restaurants: obtained permits, ordered materials, supervised sub-contractors, etc.

1982

Mcdermott Int.

Piping Superintendent

Installation and hook-up of 10 oil-gas platforms for process, Zakum Field, offshore Abu Dhabi, UAE. Supervised structural and piping installation for start-up of 10 platforms and start-up.

1981

Arco Oil and Gas

Chief Inspector

Installation of compressor station, construction and start-up of Cryogenic plant.

1980 to 1981

Mcdermott Int.

General Crafts Foreman

Supervised all crafts, all testing, installation, and start-up of an Offshore compressor station and LNG plant, Abu Dhabi, UAE.

1980

Pemex De Mexico

Project Superintendent

Supervised all construction and testing of a cyrogenic plant, Vera Cruz, México. Also, involved one 6" and one 8" pipelines; laid approximately five miles to a Hot Tap locations and completed tie-ins.

1975 to 1980

Mcdermott Int.

Superintendent/Foreman

Responsible for supervision of construction and installation of piping and equipment for LNG plant in Jebel Ali, UAE; a chlorine petro-chemplant in the Houston, TX area, Arco Oil and Gas - Fluor Const. and Eng., installation and start-up of an NGL marine refining and loading terminal in Jakarta, Indonesia; also construction of offshore platforms; Ju' Aymah, Saudi Arabia and Dubai, UAE. Responsible for setting of major equipment on offshore platforms, including, 1400 ton deck sections, 300 to 400 ton generators, compression packages and 350 person living quarters.



Contact this candidate