PERSONAL DATA [pic]
NAME YEONG CHEE KHEONG.
NATIONALITY MALAYSIAN AND SINGAPORE PERMANET RESIDENT.
DATE OF BIRTH 29TH JULY 1958.
MARITAL STATUS MARRIED.
Languages English, Mandarin and Bahasa Malaysia
MOBILE HANDPHONE H/P +601******** (Malaysia)
E- mail **************@*****.***
QUALIFICATION
. SECONDARY THREE (MALAYSIA).
. INSTITIUT TEKNOIOJI NEGERI, IPOH, MALAYSIA (WELDING COURSE).
. INSTITIUT OF TECHNICAL EDUCATION, SINGAPORE. ARC WELDING AND GAS WELDING
(NTC3).
. SINGAPORE WELDING SOCIETY.
. ATTENDED A COURSE IN STRUCTURAL WELDING DESIGN COURSE.
. SAFETY SUPERVISOR M.O.L SINGAPORE.
. THE WELDING INSTITUTE CERTIFICATE OF ATTENDANCE (TWI) - WELDING
INSPECTION - CSWIP 3.1
. CERTIFICATE ( WELDING INSPECTOR, CSWIP) U.K.
. MICROSOFT OFFICE -Ms EXCEL, Ms WORD, Ms POWERPONT & Ms ACCESS.
CAREER PROFILE
Appointed in Several Positions for local Contracts as Company
Representative, Supervisor/Inspector of Structural/Welding, Piping and
staff of Project Team. Designated in various projects for Shipbuilding /
Shiprepairing. New Construction Rig / Conversion / Refurbishment of oil
drilling rig, Offshore platform Facilities for FPSO, FSO / FPSO tanker
Conversion, Turret, Fabrication and installation of structural & Piping
Projects, Familiarize with applicable Structural / Piping Drawings,
International Codes Conversant with AWS D1.1, ASME B31.1, ASME B31.3, API
1104, API 650, NORSOK, ABS, DNV Class Standards and Specifications.
FIELD RELATED WORK EXPERIENCE
. Attended One Month of Training in Cutting, Fitting & Welding
. Supervisor & check of Equipment's, Supervisor/ Inspection
Structural/Steel, Welding, Piping and Topside, Turret, Thermal &
Acoustic insulation at Living Quarter, Supervisor/Inspection Rig
Structural, Helideck Fabrication & Installation, Weld Maps, Supervising
Dimensional, Tank Survey/ Close-up Survey Onboard Vessels, Supervising/
Inspection Pressure Air tests and nitrogen-helium leak testing and
hydrotesting ( Hull and Piping,), flushing and reinstatement (Piping) as
per Specification, Mechanical equipment and fabrication vendors shop
inspection, Fabrication of material like carbon steel A106 GrB, API5L Gr
B, ABS GrA, EH32, EH36, AH32, X52, Stainless steel 316 L, A790 (Duplex)
and B337 (Titanium), Preventive measures and general worksite safety.
JOB ASSIGNMENT AND RESPONSIBILITES
. Reviewing QA/QC Procedures, Review and Witness Welding Procedures
Specification test and Witness Welders Qualification test and Materials
testing for charpy V-notch, tensile strength, hardness, macro test as per
code required or in accordance with specifications, Review inspection
test plan, Review NDE Personnel Resume and NDT Procedure work, Review
the quality control and quality assurance aspects to inspection of the
Contractor's quality assurance manual, quality control manual and
procedures, Review AFC drawing / Specification and Contractor's shop
drawings, Review Contractor's Purchase Inquiry documents, Supervising of
PQR & materials traceability before Fabrication & installation and
Welding Consumables, Ensure that welders are using correct approved and
qualified welding procedures, Review, advise on and answer STQ raised by
Contractor, Resolve technical problem from production. Supervising/
Inspection and monitor the Fabrication Structural, Piping and Welding
works, Verify all structural and Piping shiploose materials and ensure
that they are properly packed prior to loadout, Monitor all safety
aspects of the fabrication works and carry out Unsafe Act auditing
regularly.
. Reviewing Calibration Testing Equipment and Testing methods evaluation,
Schedules, Issue work orders, Planing and Development, Material receipt
inspection and verification, MVR, Monitor marking and cutting activities
and inspect joints of Fit-ups and Welding, and Dimensional check as per
AFC drawings / Specification & Code for Fabrication and installation,
Failure analysis and Corrective action Verify Conformity, monitoring site
fabrication and test practices and Reports (paperworks) are kept in
order.
. Arrange & Witness NDT test, Review NDT and PWHT reports (PT, UT, MPI, RT
film interpretation), Review and verify as built drawing and final
Documentation.
. Review of Hydrostatic / Pneumatic test packages for piping systems and
monitoring and witness of hydrotesting and nitrogen-helium leak testing,
reinstatement of piping onsite and also ensuring procedures are adheres
to.
. Prepare and monitor punchiest items to final acceptance and ensuring they
are resolved prior to sail away.
. Assist Commissioning Engineer perform in the precommissioning in
accordance and reinstatement testing of piping system if required.
EMPLOYMENT HISTORY
Transocean Offshore Drilling, Drillship " Deepwater Millennium''for
upgrading and refurbishment to work of 10,000ft deepwater application
structural work and piping work, Living Quarter upgrading and outfitting -
October 2013 to July 2014 Fabrication in Keppel Shipyard Singapore -
Transocean Owner's Rep, Senior Inspector ( Structural, Piping & Welding ).
Petroleum Authority of Thailand Exploration and Production International (
PTTEP International ) for "Zawtika Project for Gulf of Martaban", Offshore
of Myanmar at Zawtika Field (ZP Platform ) - New Fabrication of ZP
Platform in Karimun, Riau, Indonesia Workshop - July 2012 to August 2013 -
PTTEP Rep Construction Supervisor ( Structural & Piping & Welding ).
Transocean Offshore Drilling semi- submersible drilling Rig " Actinia" for
upgrading and refurbishment to work of 4,500 ft deepwater application
structural work and piping work, Living Quarter upgrading and outfitting -
April 2012 to June 2012 Fabrication in Sembawang Shipyard Singapore -
Transocean Owner's Rep, Construction Supervisor ( Structural, Welding &
Piping ).
Transocean Offshore Drilling semi- submersible drilling Rig " GSF Rig 140"
for upgrading and refurbishment to work of 2,800ft deepwater application
structural work and piping work, Living Quarter upgrading and outfitting -
July 2011 to March 2012 Fabrication in Keppel Fels Limited Singapore -
Transocean Owner's Rep, Senior Inspector (Structural, Welding & Piping ).
Transocean Offshore Drilling, semi-submersible drilling Rig "Jack Bates"
for upgrading and refurbishment to work of 6,000ft deepwater application
structural work and piping work, Living Quarter upgrading and outfitting -
August 2010 to March 2011 Fabrication in Keppel Fels Limited Singapore -
Transocean Owner's Rep, Senior Inspector (Structural, Welding & Piping ).
Transocean Offshore Drilling, Drillship "GSF Explorer " for upgrading and
refurbishment structural works and pipings and Living Quarter of 7,800 ft
ultra-deepwater drillship, November 2009 to April 2010 Fabrication in
Sembawang Shipyard Singapore- Transocean Owner's Rep, Senior Structural &
Piping & welding Inspector.
Workships Contractors BV (Netherlands), Jack-up drilling Rig "Seafox 6" for
refurbishment steel work and Leg extend to 10m and repair of leg wells,
insulation at Living Quarter install H (A) 60 protection wall, fabrication
and install new crane pedestal, March 2009 to October 2009 - Fabrication
in Keppal Fels Limited, Singapore - Workships contractor BV Owner's Rep
Structural/Welding & Piping Inspector.
Transocean Offshore Drilling, Jack-up drilling Rig "Trident IX '' for
refurbishment steel work and Legs repair, September 2008 to February 2009
Fabrication in Keppal Fels Limited, Singapore- Transocean Owner's Rep,
Senior Structural/ Piping & Welding Inspector.
Seas Standard Engineering Nexans, Norway AS, Fabrication of Sabmarine Cable
Turntable structural steel for South China & Hainan island Power Grid
interconnection Project, July 2008 to August 2008 - Fabrication in
Guangdong Power Grid Factory, China. - Site Rep, Seas Standard QA/QC
Supervisor ( Structural & Piping & Welding ).
Transocean Offshore Drilling Inc, Jack-up drilling Rig '' Key Gibraltar''
for refurbishment and Upgrade (Steel Work), April 2008 to June 2008 -
Fabrication in Sembawang Shipyard Singapore - Transocean Owner's Rep,
Structural & Piping & Welding Inspector.
Single Buoy Moorings (Offshore), New Construction of "Talisman Mopustor
Tank", August 2007 to March 2008 - Fabrication in Malaysia Marine and Heavy
Engineering Sdn Bhd, Pasir Gudang, Johor Bahru, Malaysia - Owner's Rep, SBM
QA/OC Supervisor ( Structural & Piping & Welding ).
Qatar Liquefied Gas Company Ltd. (II), "New Fabrication and installation
Project for Qatargas II Development Project" ( LNG Plant ) for Compander,
Heat Exchanger, LNG Sub-cooler- CTJV Fabricator workshop in Hanoi Vietnam.-
January 2006 - July 2007 - Owner's Rep, Qatar Liquefied Gas Structural/
Welding & Piping Inspector.
Vopak Singapore terminals Pte Ltd, Jurong IsIand. New Fabrication and
installation of "oil storage tank and pressure vessel tank" in Jurong
Island (Singapore) - August 2005 to December 2005- Owner's Rep, Vopak
Structural/Welding & Piping Inspector.
Abu Dhabil's National Drilling Company, Jack-up drilling Rig (B Class) " AI
Hail " New Construction Rig at fabrication in Keppel Fels Limited,
Singapore- June 2004 to July 2005 - Owner's Rep, Abu Dhabil Structural &
Welding Inspector
Atwood Oceanics Pacific Limited, Jack-up drilling Rig (B Class) ''Atwood
Beacon'' New Construction Rig at Fabrication in Keppel Fels Limited,
Singapore - March 2003 to June 2004 - Owner's Rep, Atwood Structural &
Welding Inspector.
Diamond Offshore Drilling Inc, Semi- Submersible Rig " Ocean Rover ''
upgrading and Conversion to work in 6,500ft deepwater application on hull
with 16 additional bunks, significantly enlarged cellar deck area,
additional SCR Room, new drill floor, high capacity deck crane install, new
third level quarter, Aft pipe rack increased, mooring technologies
outfitting- January 2002 to February 2003- Upgrading and Conversion
Fabrication in Keppel Fels Limited, Singapore-Owner's Rep, Diamond Offshore
Structural & Welding Inspector.
Diamond Offshore Drilling Inc, Semi- Submersible Rig " Ocean Baroness ''
upgrading and Conversion to work in 6,500ft deepwater application on hull
with 16 additional bunks, significantly enlarged cellar deck area,
additional SCR Room, new drill floor, high capacity deck crane install, new
third level quarter, Aft pipe rack increased, mooring technologies
outfitting- December 2000 to December 2001- Upgrading and Conversion
Fabrication in Keppel Fels Limited, Singapore- Owner's Rep, Diamond
Offshore Structural & Welding Inspector.
Sumitomo Chemical Plant within SMAG Complex on Jurong island (Singapore)
for shut down work- June 2000 to November 2000 - Owner's Rep, Sumitomo
QA/QC Inspector.
Single Buoy Moorings (Offshore) " Yetagun (FSO) Conversion Project" for
Premier Petroleum Myanmar LTD, Yetagun Field off Myanmar, May 1999 to March
2000. - Conversion Fabrication in Keppel Tuas Shipyard, Singapore. -
Owner's Rep, SBM Structural/ Piping & Welding Inspector.
Hap Seng Engineering Private Limited Singapore - October 1998 to April 1999
- Structural / Piping Supervisor (Hap Seng) - Project for SBM (Offshore)
Modules 2 & 3,Topside (Structural Process Facilities) Project For "Kuito
Field Phase 1" (FPSO) for Onshore Fabrication.
Nortrans (Offshore) "Ruby Princess (FPSO) Conversion Project" for Petronas
Carigali Vietnam - March 1998 to October 1998- Conversion Fabrication of
Turret in Keppel Tuas Shipyard Singapore - Owner's Rep, Nortrans QA/QC
Inspector ( Turret ).
Sembawang Bethlehem Private Limited, Singapore- February 1993 to January
1998 - QA/QC Yard Supervisor (Shipbuilding, Rigbuilding Section )-
Tanker, Floating Dock and Jack-up Rig.
Eng Soon Engineering Private Limited, Singapore.- April 1983 to February
1993.- Steelwork /Piping Sub- Contractor Supervisor (Shipbuilding,
Shiprepairing, New Construction of Semi- Submersible Rig and Tanker
Conversion of FPSO and FSO ).
Promet Private Limited, Singapore-March 1981 to April 1983.- Structural
/Piping Yard Chargehand (Shipbuilding, Rigbuilding and Tower Crane
Fabrication).
Jurong Shipyard Limited, Singapore- June 1979 to March 1981 - Steel Fitter
/ Welding Work (Shipbuilding & Ship Repairing).