Post Job Free
Sign in

Construction High School

Location:
Houston, TX
Posted:
March 21, 2015

Contact this candidate

Resume:

ROSARIO ALVARADO THOMASSON

**** ****** ****, *******, ***** 77092 (C) 361-***-**** ************@*****.***

professional summary skills work history Manager/Maintenance

Sep 2009 - Aug 2012 Riverside Camp ground LLC

Tivoli, TX Collected rent, read light meters, did all maintenance work, did the yard work (over 30 acres), and etc.

Manually carried roofing materials up ladders. Sprayed walls with waterproof compound. Blended paints and correctly matched colors. Cleared drains and downspouts and cleaned gutters. Consistently assumed additional responsibilities and worked extended hours to meet project deadlines. Porter

Feb 2006 - Sep 2009 Laguna Oilfield

Victoria, TX Monitored inventory and reported items to be restocked for each job. Prepared and cleaned construction sites by removing debris. Monitored inventory and reported items to be restocked for each job. Accurately estimated time and materials costs for projects. Accurately estimated time and materials costs for projects. Applied caulk, sealants and other agents to installed surfaces. Completed tear-down of existing structures and prepared for new construction. Accurately estimated time and materials costs for projects. Conducted hydrostatic water testing.

? Porter

Jan 2004 - Feb 2006 Stallions Oilfield

Victoria, TX Set ladders, scaffolds and hoists in place for taking supplies to roofs. Monitored inventory and reported items to be restocked for each job. Consistently assumed additional responsibilities and worked extended hours to meet project deadlines. Requisitioned new supplies and equipment. Accurately estimated time and materials costs for projects. Completed tear-down of existing structures and prepared for new construction. Maintenance/Attendant

Mar 2001 - Dec 2003 Laser Wash

Victoria, TX Completed tear-down of existing structures and prepared for new construction. Completed tear-down of existing structures and prepared for new construction. Completed tear-down of existing structures and prepared for new construction. Applied caulk, sealants and other agents to installed surfaces. Accurately estimated time and materials costs for projects. Dug trenches, backfilled holes and compacted earth to prepare for new construction. Accurately estimated time and materials costs for projects. Applied caulk, sealants and other agents to installed surfaces. Completed tear-down of existing structures and prepared for new construction.

Jan Crew leader

1992 - Jun 2000 Enviro Construction

Katy, 77492, TX Completed tear-down of existing structures and prepared for new construction. Applied caulk, sealants and other agents to installed surfaces. Accurately estimated time and materials costs for projects. Dug trenches, backfilled holes and compacted earth to prepare for new construction. Dug trenches, backfilled holes and compacted earth to prepare for new construction. Mixed porridge of catch basins and poured and sawed off concrete and asphalt. Provided accurate measurements and estimates for all projects. Mixed porridge of catch basins and poured and sawed off concrete and asphalt. Dug trenches, backfilled holes and compacted earth to prepare for new construction. Accurately estimated time and materials costs for projects. Aided crews in joining, wrapping and sealing sections of pipe. Installed waterworks, locks and dams. Blended paints and correctly matched colors. Sprayed walls with waterproof compound. Filled chipped, cracked and broken bricks and tiles with adhesives and grouting materials to correct surface imperfections. Removed damaged tile, brick and mortar. Applied chemical solutions and used polishing machines to clean all installation surfaces, equipment, tools, work sites and storage areas. Operated equipment such as [Machine type] and [Machine type]. Graded and maintained railroad right-of-ways and assisted in laying ties and rails. Set ladders, scaffolds and hoists in place for taking supplies to roofs. Prepared and cleaned construction sites by removing debris. Monitored inventory and reported items to be restocked for each job. Conducted hydrostatic water testing. Dug trenches, backfilled holes and compacted earth to prepare for new construction. education High School Diploma:

1986 Memorial High School

San Antonio, TX



Contact this candidate