Post Job Free
Sign in

Crane Operator Power Plant

Location:
NCR, Philippines
Posted:
March 19, 2015

Contact this candidate

Resume:

NOEL A. DACALOS

Present Address: ** ****** ******, **** ****** Village, Bgy. San Jose, Dasmariňas City, Cavite, Philippines

ZIP Code #: 4114

(046-***-**** c/o Mrs. Normelita Salem Dacalos

Tel. Number:

+639*********

Mobile Number:

E-Mail Address: **********@*****.***

Provincial Address: Bgy. Bulacan, Hindang, Leyte, Philippines

Position Applied: HEAVY EQUIPMENT / CRANE OPERATOR

Career Objective: To become part of a group that offers advancement and upgrading of my

capability in the field of heavy equipment operations and lifting & rigging of heavy machineries.

PERSONAL ATTRIBUTES

Ability to follow written and verbal work instructions

Eager to learn new skills and competencies

Can work effectively with minimal supervision

Can easily adapt to new work environment

Proficient in crane rigging operations and preparations of lifting plans

PERSONAL INFORMATION

Date of Birth : November 8, 1971

Place of Birth : Bgy. Bulacan, Hindang, Leyte

Height : 156 centimeters

Weight : 81 kgs.

Religion : Roman Catholic

Civil Status : Single

Gender : Male

Languages : English, Tagalog

Citizenship : Filipino

Passport No. : EEC1105930

Date Issued : May 15, 2014

Date Valid : May 14, 2019

EDUCATIONAL ATTAINMENT

College : Associate in Marine Engineering

School : Philippine Maritime Institute (PMI), Manila

Page 1 of 3

EMPLOYMENT HISTORY & WORK EXPERIENCE

1. Company: CONTRACTING AND TRADING COMPANY (CAT)

Location: Kingdom of Saudi Arabia

Date: September 15, 2004 to December 15, 2014

Position: Heavy Equipment - Crane Operator

Projects SAUDI ARAMCO, MAINTAIN POTENTIAL OIL & KHUFF GAS & OIL WELLS

Undertaken: PROJECTS

(SEDGUM, UTHMANIYAH, HAWIYAH, HARADH, TINAT & GHZL AREA)

Installation of structural, production line, flow line, remote header and

manifold piping for oil and gas wells.

2. Company: MOHAMMAD F. AL-HAJRI CONST. EST.

Location: Al- Khobar, Kingdom of Saudi Arabia

Date: July 2002 to July 2004

Position: Heavy Equipment - Crane Operator

Project SAUDI ARAMCO PIPELINE RECONDITIONING AND PLANT MAINTENANCE

Undertaken: PROJECT

Reconditioning of Saudi Aramco gas and oil pipelines. Excavation works,

installation of ring girder pipe supports for above ground. Pipe sleeving

works for underground piping. Remote headers and manifold installation,

civil structural and mechanical works.

TAIHEI ALLTECH CONSTRUCTION (PHIL.) INC. /ALLTECH

3. Company:

CONTRACTORS, INC. /HITACHI LTD.-Philippine Branch

Location: Philippines

Date: July 1995 to July 2001

Position: Heavy Equipment - Crane Operator

Projects

Undertaken:

3.1 SAN LORENZO 500MW POWER PLANT PROJECT

FIRST GAS CORP., Sta. Rita, Batangas, Philippines

Loading and unloading of delivered materials such as boiler tube bundles

pipes and fittings. Assist in pre-assembly area fabrication yard, erection of

pressure vessel columns, side casing, piping and valves. Installation of

steam drum, smoke stack and other related erection works as maybe

required.

3.2 ELECTROSTATIC PRECIPITATOR PROJECT

NPC POWER PLANT, Calaca, Batangas, Philippines

Loading and unloading of materials intended for fabrication shop. Erection

of columns, inner and outer casing, ducting structural installation and other

related works.

3.3 DEMOLITION AND EXPANSION PROJECT

APO CEMENT CORPORATION PLANT, Naga City, Cebu, Philippines

Loading and unloading of scrap and fabricated materials. Erection of civil

structural and mechanical structures and equipment.

Page 2 of 3

3.4 FR CEMENT EXPANSION PROJECT

FR CEMENT CORPORATION PLANT, Teresa, Rizal, Philippines

Loading and unloading of delivered fabricated materials. Erection of

columns, girder, beams and bracings. Installation of ducting, kiln shell

riding ring and other mechanical equipment and structures.

3.5 NPC REHABILITATION PROJECT

NATIONAL POWER CORP., Sucat, Paranaque City, Philippines

FORKLIFT Operator

Assist in the installation of boiler tubes, piping works, ducting and other

mechanical and structural works.

SEMINAR AND TRAINING ATTENDED

50 Tons TADANO CRANE Rough Terrain, Saudi Aramco, KSA

30 Tons TADANO CRANE Rough Terrain, Saudi Aramco, KSA

35 Tons TRUCK MOUNTED CRANE, Grove TMS-475, Saudi Aramco, KSA

SIDEBOOM-CAT-583C, 572,561, Saudi Aramco, KSA

BACKHOE CAT-320DL, 325,320, Saudi Aramco, KSA

PAYLOADER CAT-966H, 962, 960, 950, Saudi Aramco, KSA

RIGGER CERTIFICATION PROGRAM 111 & 1, Saudi Aramco, KSA

WORK PERMIT RECEIVER CERTIFICATION, Saudi Aramco, KSA

CONTRACTOR SAFETY OFFICER CERTIFICATION, Saudi Aramco, KSA

ROUGH TERRAIN CRANE OPERATOR CERTIFICATION-ACEL-TESDA, Philippines

45 Tons CRAWLER CRANE LINKBELT, ACEL-TESDA, Philippines

150 Tons CRAWLER CRANE KH700 HITACHI, ACEL-TESDA, Philippines

I hereby certify that the above information are true and correct to the best of my

knowledge and belief.

Noel A. Dacalos

Applicant

Page 3 of 3



Contact this candidate