Post Job Free

Resume

Sign in

Manager Construction

Location:
Longview, TX
Posted:
March 10, 2015

Contact this candidate

Resume:

Steven Craig Blalock

*** *** *** **

Marshall, TX

75670

aconza@r.postjobfree.com

903-***-****

Objective

Experienced facility and pipeline project manger, supervisor, and inspector seeking a position in

which my experiences and training can help to increase the value of the organization.

Skills

*Adaptive and responsible manager, capable and self-motivated.

*Excellent time management skills, able to prioritize to meet deadlines.

*Construction and operation of gas processing and or production.

*Management

*Ability to read and interpret P&IDs, and isometric drawings.

*Understanding of materials specifications and various ASME codes

*Operator Qualified

*CSI

*Pipeline integrity

*Construction Safety

*Microsoft Excel, Microsoft office, and Microsoft Word

*Project Planning

*Amine plant construction

*Dehy construction

*Safety Mangment, PSM,

*SCADA

*Inspection

*Pipeline construction

Work Experience

Facility And Pipeline Inspector (Blue Star Consulting) (October 2014 - present)

Inspected various construction projects in accordance with Kender Morgan' technical guideline.

Maintained the facility and ensured that all safety guidelines and regulations are maintained at

the site. Conducted regular inspection on the materials used in the facility

construction and the quality of work to evaluate it with the specifications. Had to weld map and

keep up with all documentation for job. Made sure all pressure test were done at spect required by

Kinder Morgan. Had to make sure all welders were tested for B31.3 and all welders followed

procedure. Meet with operators at Paden plant and let them know work plan

for job daily. Sent daily reports to Kinder Morgan project manger.

Superintendent (Ritter Construction) (February 2014 - October 2014)

Had to oversee the safe and accurate laying of pipelines. Acted as the focal point for all technical

issues associated with the installation of pipeline, incl.

Hydro testing, installation of risers, pumping stations, and tank batteries. Ensured compliance

with OSHA and corporate Process Safety Standards and other regulatory requirements. Planed

work assignments and equipment locations to meet

transportation, operations or production goals.

Facility And Pipeline Supervisor (Select Energy Services) (February 2008 -

February 2008)

Successfully completed the installation of 4 Amine treating plants(400GPM ZYPHER) and 8

DEHYS. Supervised maintenance crews. Did all the maintenance on all the Amine plants and

DEHYS for T.G.G.T. Ensured safe operations in facilities. Supervised efficient working of staff.

Coordinated with Manager for administrative tasks. Administered all construction projects.

Ensured compliance to State and Federal regulations.Scheduled work for customers.

References

Current references are available upon request

Carroll Ward (Inspector Murphy Gas) - 903-***-****

Eddie Perrin( Facilities Manager Azure Midstream) - 318-***-****

Robert Beall(Blue Star Consulting Project Coordinator)- 334-***-****



Contact this candidate