Post Job Free

Resume

Sign in

Project Training

Location:
28884, Indonesia
Salary:
12000000
Posted:
March 08, 2015

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DATA

Name : Erwin Deni Frans Manurung, ST

Place/Date of Birth : Porsea, 04 June 1980

Professional : Coating Inspector

Sex : Male

Marital Status : Married

Nationality : Indonesian

Height : 170 cm

Weight : 70 kg

Health : Excellent

Present Address : Jl. Rokan, Kel Air Jamban, Kec. Mandau - Duri 28884

Phone Number : 085********* / 082*********

E-mail : acomzb@r.postjobfree.com

EDUCATION

> 1999 2007 : S-1 Mechanical Engineering at HKBP Nommensen University - Medan North Sumatera (Graduated).

> 1996 1999 : Senior High School at SMK Swasta Parulian 2 Porsea North Sumatera (Graduated).

> 1993 1996 : Junior High School at SMP Negeri NA IX-X, Aek Kota Batu North Sumatera (Graduated).

> 1987 1993 : Primary School at Tampak Lobang, Kec NA IX-X North Sumatera (Graduated).

TRAINING EXPERIENCE

- 2014 : Training IIF Orientation Training Conducted by PT. Chevron Pacific Indonesia at PT. Timas Suplindo

- 2014 : Training MSW/ Hes Induction & Training Confined Space/ Working at Height by PT. Chevron Pacific Indonesia at PT. Timas Suplindo

- 2012 : Training HES Induction by PT. Bourbon Logistics Indonesia at PT. Triagung Jaya Abadi

- 2012 : Training MSW & Hes Induction by PT. Chevron Pacific Indonesia at PT. BEW Consortium

- 2011 : Training MSW & Hes Induction by PT. Chevron Pacific Indonesia at PT. Timas Suplindo

- 2011 : Training FSWP/ Hes Induction & Training Confined Space/ Working at Height by PT. Chevron Pacific Indonesia at PT. Timas Suplindo

- 2010 : Training FSWP & Hes Induction by PT. Chevron Pacific Indonesia at PT. Multi Structure

- 2009 : Training Coating Inspector Level- 1 by CV. Giros Indonesia in Duri Riau

- 2008 : Training FSWP & Hes Induction by PT. Chevron Pacific Indonesia at PT. Adhi Karya (Persero), Tbk.

- 2007 : Training Pelatihan Teknik Refrigerasi by HKBP Nommensen University, Fakultas Teknik Mesin Medan

WORK EXPERIENCE

Date : 09 October 2014 up to 13 February 2015

Company : PT. Kaliraya Sari

Project : Ampuh Pressure Maintenance Project at Ampuh GS

(Water Surge Tank T-1501, Pipe Line On Plot/Off Plot, Platform SID, Structure/Shelter On Plot, Etc)

Assign For : PT. Chevron Pacific Indonesia

Classification : Coating Inspector

Reason of Leaving : Project Completed

Job Description : - Prepared ITP & Procedure Sand Blasting/Coating & Painting

- Monitoring Daily Activity Sand Blasting/Coating & Painting

- Prepared Daily Report & Activity Sand Blasting/Coating & Painting To Client/ Representative

- Prepared Daily Inspection Report Sand Blasting/Coating & Painting To Client/ Representative

- Prepared Inspection Report Sand Blasting/Coating & Painting To Client/ Representative

- Inspection & Checked/Withness Sand Blasting/Coating & Painting by WFT & DFT Thickness

Date : 29 January 2014 up to 29 September 2014

Company : PT. Timas Suplindo

Project : Tank Facility Upgrade Project at Bangko GS

(Wash Tank T-03, Pipe Line On Plot, Platform SID, Etc)

Assign For : PT. Chevron Pacific Indonesia

Classification : Coating Inspector

Reason of Leaving : Project Completed

Job Description : - Prepared ITP & Sand Blasting/Coating & Painting Procedure

- Monitoring Daily Activity Sand Blasting/Coating & Painting

- Prepared Daily Report & Activity Sand Blasting/Coating & Painting To Client/ Representative

- Prepared Daily Inspection Report Sand Blasting/Coating & Painting To Client/ Representative

- Prepared Inspection Report Sand Blasting/Coating & Painting To Client/ Representative

- Inspection & Checked/Withness Sand Blasting/Coating & Painting by WFT & DFT Thickness

Date : 26 November 2012 up to 20 December 2013

Company : PT. Triagung Jaya Abadi

Project : Tamapole Offshore Base Project East Kalimantan

(Structure/Building, Pipe Underground, Pipe Line, Etc)

Assign For : PT. Bourbon Logistics Indonesia East Kalimantan

Classification : Coating Inspector

Reason of Leaving : Project Completed

Job Description : - Prepared SOP, JHA/JSA for Sand Blasting/Coating & Painting Team

- Prepared ITP & Sand Blasting/Coating & Painting Procedure

- Monitoring Daily Activity Sand Blasting/Coating & Painting Team

- Prepared Daily Report & Activity Sand Blasting/Coating & Painting Team To Client/ Representative

- Prepared Daily Inspection Report Sand Blasting/Coating & Painting Team To Client/ Representative

- Inspection & Checked/Withness Sand Blasting/Coating & Painting by WFT & DFT Thickness, Corrosion Control All Material Structure At Area Bourbon Logistics Indonesia

- Inspection/Checked Painting All Item Wall Concrete, Platfond & Column Building at Bourbon Logistics Indonesia Area

Date : 13 September 2012 up to 23 November 2012

Company : PT. BEW Consortium

Project : EPC Tank Facility Upgrade Benar GS

(Pipe Line On Plot, Platform SID, Etc)

Assign For : PT. Chevron Pacific Indonesia

Classification : Coating Inspector

Reason of Leaving : Resign

Job Description : - Monitoring Daily Activity Sand Blasting/Coating & Painting

- Prepared Daily Activity & Report Sand Blasting/Coating & Painting

- Corrosion Control For Sand Blasting/Coating & Painting

- Inspection & Checked/Withness Activity Process Sand Blasting/Coating & Painting

- Prepared Daily Activity & Report Sand Blasting/Coating & Painting

- Prepared Inspection Report Sand Blasting/Coating & Painting To Client/ Representative

- Inspection & Checked/Withness Sand Blasting/Coating & Painting by WFT & DFT Thickness

Date : 01 October 2011 up to 28 July 2012

Company : PT. Timas Suplindo

Project : EPC Tank Facility Upgrade Benar-GS; Rantau Bais-GS; HO SMF 2 Project JT-011-019-WC-CPI

(New Tank Storage 9 Ea)

Assign For : PT. Chevron Pacific Indonesia

Classification : Fitter-2 to Coating Inspector

Reason of Leaving : Good Manner

Job Description : - Prepared SOP, JHA/JSA for Sand Blasting/Coating & Painting

- Monitoring Daily Activity Sand Blasting/Coating & Painting

- Corrosion Control For Sand Blasting/Coating & Painting

- Inspection & Checked/Withness Activity Process Sand Blasting/Coating & Painting

- Prepared Daily Activity & Report Sand Blasting/Coating & Painting

- Prepared Inspection Report Blasting/ Coating, Painting To Client/ Representative

- Inspection & Checked/Withness Sand Blasting/Coating & Painting by WFT & DFT Thickness

Date : 21 February 2010 up to 31 March 2011

Company : PT. Berkat Karunia Phala

Project : Multi Structure Contract Service WUR Package A, PT. CPI

Assign For : PT. Chevron Pacific Indonesia

Classification : Support Operation

Reason of Leaving : Finish Contract

Job Description : - Prepared SOP, JSA for Construction Team

- Monitoring Activity Construction Team

- Prepared Activity Support Operation & Equipment

- Report Activity Support Operation & Equipment to Coordinator Transport & Equipment and HRD

- Monitoring Activity All Vehicle, Equipment & Welding Machine

Date : 22 August 2008 up to 20 February 2010

Company : PT. Berkat Karunia Phala

Project : Adhi Karya CS WUR Package C, PT. CPI

Assign For : PT. Chevron Pacific Indonesia

Classification : Time Keeper to Support Operation

Reason of Leaving : Finish Contract

Job Description : - Report Time Sheet To HRD & Accounting

- Update Daily Activity & Progress To Superintendent Construction

- Report SOP, JSA, POP for Construction Team

- Report Activity Transport & Equipment To Coordinator Transport & Equipment

- Monitoring Activity Construction Team

- Report R1, R3, R5, Daily Welding Machine & Equipment To PT Adhi Karya and Coordinator Transport & Equipment

Date : 16 November 2007 up to 17 February 2008

Company : PT. Gramedia Direct Selling - Medan

Classification : Collector/ Marketing

Date : 07 August 2007 up to 13 November 2007

Company : PT. Trijaya Pratama Futures - Medan

Classification : Business Development Executive

Sincerely Yours,

Erwin Deni Frans Manurung, ST



Contact this candidate