Post Job Free
Sign in

Senior Instrumentation and Control Engineer

Location:
Calgary, AB, Canada
Posted:
March 06, 2015

Contact this candidate

Resume:

Kexiang (Kevin) Yu

Phone: 403-***-****

Cell Phone: 587-***-****

E-mail: ************@*****.**

AREAS OF EXPERTISE

More than 20 years’ work experience of instrumentation and control systems

. Practical Experience in large projects for the oil/gas, petrochemical, chemical

and power industries

Rich experience on flow instrument & valve sizing, P&ID development,

Instrumentation specifications, instrument data sheet production, purchase

requisitions (RFQ/MR), bid evaluation (TBE).

Be proficient in piping Isometric squad check, instrumentation vendor package

check and mechanical package squad check

Involved in full life cycle of instrumentation and control system engineering

including scoping study, design basis memorandum, HAZOP, cause and effect

diagram, control narrative, detailed design, and construction support

. Practical experience with PLC/SCADA Programming and DCS configuration

Instrumentation & Control Engineering Standards - API, ISA, ASME, IEC, ISO

etc.

PROFESSIONAL EXPERIENCE

Sr. I&C SPECIALIST/ENGINEER - SNC-Lavalin Inc., Calgary, 01.2012 –

Alberta, Canada Present

MEG Energy – Christina Lake SAGD Phase 3A/2B4X Feed and Detail Project

Reviewed and updated all Instrumentation Specifications/Standards

Reviewed and updated all Instrumentation Installation Drawings

Reviewed and provided inputs for P&ID development

Reviewed and Implemented Lesson Learned/ Engineering Change Request

Worked on Control Narratives for all Process Areas

Worked on Shutdown Keys for all process Areas

Prepared and generated instrument datasheets

Provided instrument information to Other Groups

. Attended HAZOP meetings and implemented HAZOP resolutions

. Generated Instrument Material Requisition and datasheets

. Conducted Instrumentation calculation/Sizing (Control valve, Pressure Relief

Valve, Flowmeter, Thermowell and Level Range Sketch)

. Worked on technical queries and Technical Bid Evaluation (TBE)

Worked on Purchase Order for Instruments

.

. Reviewed vendor documents and piping Isometric

Page 1 of 4

. Working on Instrumentation Winterization

I&C SPECIALIST - Jacobs Canada, Calgary, Alberta, Canada 04.2011 –

12.2011

Canadian Natural Resources Limited – KIRBY SAGD Project

Worked on Technical Bid Evaluation (TBE) for instrumentation

Prepared and Generated Material Requisition for Instruments

Checked all instruments on vessels & tanks by reviewing available vendor's

mechanical drawings and provided comments to Mechanical Team

Reviewed and provided inputs for P&ID development

Reviewed Instrument 3D Model

Reviewed and marked up Vendor’s documents and drawings

Checked ISO drawings issued by Piping

Reviewed and marked up instrument calculations and datasheets from Mumbai

office

Prepared and generated instrument datasheets

Provided instrument information to Piping Group.

I&C SPECIALIST - SNC-Lavalin Inc., Calgary, Alberta, Canada 05.2007 – 03.2011

Canadian Natural Resources Limited - Horizon Oil Sand Phase 2/3 Project

Proposal

Worked on Technical Bid Evaluation (TBE) for instrumentation

Completed instrument MTOs

Checked P&IDs and Instrument Database.

Generated instrument Material requisition RFIs. for Valves (control valves, on-off

valves, pressure safety valves, regulator), Flow Meters (orifice plate, venturi,

vortex and coriolis), Level Meters (float, radar), Gas/Fire Detectors and Fire

Detection system

Saudi Aramco, Saudi Arabia - Shaybah NGL and IGHC Proposal

Completed Technical Bid Evaluation (TBE) for control valve packages, on-off

valve, ESD valve, electrical motorized valve and pressure relief valve, electronic

transmitter, instrument tubing and fitting and DCS accessories packages.

Reviewed and marked-up mechanical packages (compressors, gas hydration

etc.).

Completed instrument MTOs and instrument installation bulk material MTOs.

Provided technical queries to client.

Provided technical support to cost estimation team.

Saudi Aramco, Saudi Arabia - Wasit Gas Project

Generated and updated project instrumentation specifications ( General

Instrumentation, etc.).

Identified and Sized critical control valves.

Reviewed and provided inputs for P&ID development.

Generated instrument index and instrument specification datasheets for

Page 2 of 4

control valves, pressure relief valves, flow meters and analyzers.

Prepared and completed Gas Detection Layout

Generated instrument material requisition RFIs.

Completed Technical Bid Evaluation (TBE) for control valve, on-off valve,

ESD valve, electrical motorized valve, pressure relief valve and flow meter

packages.

Revised control narratives and cause-effect logics.

Provided technical & accessible requirements and instrument dimensions to

Piping Group.

Reviewed 3D model and provided comments.

Generated instrument MTOs.

Canadian Natural Resources Limited - Horizon Oil Sand Project

Updated instrument index and specification datasheets.

Developed as-built I&C System layout drawings.

Updated as-built FF segment & loop drawings

Petro-Canada - Fort Hills Treatment Mining Project

Generated control valve and relief valve datasheets.

Preliminary sizing control valve and pressure relief valves

Generated RFQ for pressure relief valves and control valve packages

Saudi Aramco, Saudi Arabia - Shaybah Central Processing Facilities Project

Checked and revised control valve, pressure relief valve and MOV datasheets.

Issued instrument material requisition RFQ and PO packages.

Reviewed technical bidder evaluations.

Reviewed and provided inputs for P&ID development.

Reviewed vendor’s control system documents and drawings.

Completed instrument and control system alarm/range/setting report.

Checked control system tags and updated I&C Intool index.

Conducted instrument wiring and instrument loop diagram.

Completed MCC drawings and developed instrument loop drawings.

I&C ENGINEER - B&R Automation Engineering Ltd., Shanghai, 12.1998 -

China 05.2006

Applied and selected instruments and control system.

Generated control system and instrumentation specifications.

Reviewed and provided inputs for P&ID development.

Generated instrument index and specification datasheets.

Prepared MTOs for instruments.

Developed control philosophy.

Developed control narratives and cause-effect diagrams.

Completed PLC/DCS configuration and commissioning.

Generated instrument loop, logic and installation diagrams .

I&C ENGINEER - Xi’an Instrument (Group) Co., Xian, China 09.1991 -

12.1998

Selected instruments.

Prepared MTOs for instruments.

Page 3 of 4

Generated instrument index.

Developed control philosophy.

Developed control narratives and cause-effect diagrams.

Generated I/O points for control system.

Completed PLC/DCS configuration and commissioning.

Developed instrument loop, logic and installation diagrams.

Completed FAT and SAT for control systems.

Participated in the development of the DJK-7500 DCS System

EDUCATION

M.Sc. Automation Control Engineering, Northwestern Polytechnic

University, China

B.Sc. Automation Control Engineering, Northwestern Polytechnic

University, China

TECHNICAL TRAINING

8.2014

ISA Instrumentation Series Training

10.2013

ISA INDUSTRIAL FLOW MEASUREMENT ENGINEERING

10.2012

ACM Safety Lifecycle Experience Hands on Workshop

PROFESSIONAL AFFILIATION

P Eng. Member of APEGA

Member of ISA

SKILLS

Development of various design criteria, specification and philosophies Fire & Gas System Block

Diagrams & Overall Automation System Block Diagram Participated HAZOPs and SIL verification

reviews Generated and updated control narrative and shutdown keys Sizing and calculation for inline

meters, control valve and PSV Prepare instrument index, datasheets, and material requisition Issued

RFI to solve construction questions P&ID development Create full range of engineering deliverables.

Such as wiring and loop diagram, installation detail, instrument location plan and CWP DCS

configuration, I/O card selection and assignment, and testing PLC/SCADA/HMI programming, system

configuration, network communication and testing

Page 4 of 4



Contact this candidate