HR MANAGER
To whom it may concern:
I, Ray R. Manalo, would like to apply Instrumentation and Control Maintenance Technician
or any jobs related to my knowledge. I’ve been seeking opportunities such as this and I’m
submitting my application for aforementioned position.
For having completed the course, Bachelor of Industrial Technology major in Instrumentation
and Control Engineering Technology, I have acquired knowledge in simulating and maintenance
of a process, calibration of instrument, basic knowledge in PLC and computer literate. These
skills are further enhanced when I have my internship training in (KEPCO ILIJAN
CORPORATION) KEILCO, (KOREA PLANT SERVICES) KPS, and my first job as
Instrument Technician at Asia Brewery Inc, and I have been worked at 1200MW Combined
cycle Plant,(KPS) Kepco Power and Eng’ng Services under Joel Chavez Corporation.
(shutdown commissioning) and Bobcock Hitachi Phil. Inc. As of now I am working at
Qurraya Independent Power Plant 4000MW Combined Cycle under First National
Operation and Maintenance Cor.(NOMAC) as I&C Technician.
Please refer to the enclose resume for details of my education, trainings and names of persons
who have consented to express an opinion about my ability and character.
I certainly look forward to exploring this further.
Yours truly,
Ray R Manalo
RAY R. MANALO
Ilijan, BAtangas City
E-mail address:************@*****.***
Mobile number:053*******
JOB OBJECTIVE:
To be able to contribute to the company the knowledge I have gained from my formal
education, and related learning experience, hence to make me more sound, improved and
effective individual.
Personal Data:
Name: Ray R. Manalo
Provincial Address: Ilijan, Batangas City
Date of Birth: April 11, 1989
Age: 25
Place of Birth: Metro Manila
Civil Status: Single
Citizenship: Filipino
Height: 5’8
Weight: 59 kgs.
Religion: Roman Catholic
Sex: Male
Father’s name: Guillermo T. Manalo
Profession: Company Guard
Mother’s name: Virginia R. Manalo
Profession: Housewife
Their Address: Ilijan, Batangas City
Educational Background
Tertiary: Batangas State University (2006-2010)
AlangilanCampus,Golden Country Homes
Alangilan, Batangas City
Course: Bachelor of Industrial Technology major in
Instrumentation and Control Engineering Technology
Organizations: Association of Instrumentation and Mechatronics Engineering
Students (AIMES), Batangas State University
Trainings and Seminar Attended:
• Basic NROTC Course of National Service Training
Program
(NSTP), Batangas State University
• ISO Seminar At ABI Complex (ISO 9001:2008)
• SPPA T3000 in-house training at central control room
Qurrayah Independent Power Plant (QIPP)
Maintenance Training
July 5, 2014 – August 5, 2014
CAREER OBJECTIVES
With 5 years of extensive skilled & technical experience in Maintenance of Control &
Instrumentation for Manufacturing / Energy Industry – Glass Plant,Steam Turbines, Gas Turbines,
HRSG’s & Balance of Plant (BOP) with an organization of repute, still seeking a challenging
position which will allow me to utilize my experiences and gain advancement in my career.
CORE COMPETENCIES
Over 5 Years of experience in total Power Plant process Control & Instrumentation &
manufacturingl Industry with various reputed organizations.
Presently working with NOMAC – 4000MW CCPP as Control & Instrumentation –
Technician.
Calibration of all field instruments and analyzers.
Troubleshooting field instruments, PLC and DCS modules for effective and reliable
operation of the plant.
Performing Corrective and preventive maintenance for all field instruments.
Hands on experience with Siemens SPPA T 3000 Control System.
Bench test and calibrate instruments according to ISO-17025 standard
Commission process control loop
Prepare and interpret service reports
TEST EQUIPMENT HANDLED DURING CALIBRATION ACTIVITY
• Beamex (Communicator/Calibrator)
• Hart 475 and 375 Communicator
• Multimeter
• Druck Calibrator (for pressure and vacuum creation)
• Deadweight tester
• Loop simulator (4-20 mA Source and measure)
• TC and mV simulator
Work Experienced
1. Instrument Technician
First National Operations and Maintenance Co. (NOMAC)
Qurrayah Independent 4000MW Combined Cycle Power Plant
Qurrayah,Kingdom Of Saudi Arabia
December 1, 2013 –up to present
AIM:
To be able to maintain the healthiness of all field instruments in the combined cycle
power plant including analyzers to ensure a complete automation using Siemens
DCS (SPPA T3000).
Duties and Responsibilities:
• Calibrating Field Instruments as per Maintenance
schedules.
• Doing corrective and preventive maintenance for
all field instruments and analyzers pertaining to Gas Turbines, HRSG’s, Steam
Turbines and BOP.
• Troubleshooting Open Loop and closed loop
controls from control room to field.
• Hands on experience in maintaining and
troubleshooting field instruments like Transmitters, SWAS & CEMS Analysers,
VMS etc.
• Loop checking.
• Calibration and troubleshooting pneumatic and
hydraulic valves.
• As per work instructions and Maintenance orders /
PTWs go through the assigned works in detail.
• Logic-holding of data in DCS, if required for work,
and normalising it in consultation with I & C Engineer.
• Select the tools and avail consumables required
for the assigned jobs.
• Inform control-room operator before starting the
work. Confirm the instrument and the defect going to be attended to, with the KKS
number & Description etc.
• Understand the logics related to the instrument to
be attended.
• Complete check-lists, activity reports and
calibration reports, as per the work done.
• Reporting of emergencies and incidents and near
misses.
2. Bobcock-Hitachi Phil.Inc. ( San Roque, Bauan Batangas)
Electrial and Instrument Department) January 7, 2013 – August 17, 2013
Duties and Resposibilities
• Calibration of all instrument at a module,testing and repair electrical
component and electronics.
• Repair pneumatics and electropnuematics system.
• Knowledgable in plc and scada.
• Loop checking,valve stroking and testing.
• Recieves job request and instruction from supervisor, orient for safety and
proceed to worksite.
• Makes troubleshooting and defect repair electronic, pneumatic control and
recording systems.
• Makes routine maintenance and servicing of instrument, changing fuses
and lamps on control panel, checking and calibration of sensors,
transmitter and valve positioner.
3.Kepco Plant Services And Engineering Corp.Ltd.
1200 Combined Cycle Power Plant,Ilijan, Batangas City
Electrical and Instrumentation Department
Under Joel Chavez Corporation
July 16, 2012- December 22, 2012
Position: Instrument Technician (Shutdown Commissioning)
Basic Function
Makes installation, maintenance, calibration and repair of wide variety of electrical,
electronic, pneumatic control, recording instrument, process analyser, PLC and SCADA.
Worked Performed
• Recieves job request and instruction from supervisor, orient for safety and proceed
to worksite.
• Makes troubleshooting and defect repair electronic, pneumatic control and
recording systems.
• Makes routine maintenance and servicing of instrument, changing fuses and lamps
on control panel, checking and calibration of sensors, transmitter and valve
positioner.
• Carries out repair work during shutdown as instructed. Includes checking, stripping,
cleaning, replacing and calibrating instrument. Dismantling and assembling flame
scanner, vibration sensor BPT and DCT Thermocouple.
• Complies with all safety and fire rules and regulation, such as Personal Protective
Equipment.
Instrumentation Asia Brewery Inc.(Glass Plant, Engineering
4.
Department)Instrumentation and Control Section
September 27, 2010- up to July 3, 2012
Position: Instrument Maintenance Technician
Duties and Responsibilities
• Maintaining the system with minimum or no downtime.
• Performed the scheduled calibration such as UDC (Universal
Digital Controller, actuators, transmitter, diaphragm valve,
modutrol, analyzers and recorder.
• Perfomed troubleshooting of machine related breakdowns
involving instruments and electronic controls.
• Performed routine and periodic inspection, checking and
monitoring process parameters and field instrument.
• Performed installation works involving instruments, electronic
controls and equipment as required during repair and maintenance,
commissioning, upgrade and modification.
• Performed schedule preventive maintenance of instrument and
electronic control.
• Performed demobilization after completion of assignments.
On The Job Trainings/Work Experience(Power Plant, Combined Cycle)
• Kepco Plant Services And Engineering Corp.Ltd.
1200 Combined Cycle Power Plant,Ilijan, Batangas City
Steam Turbined Dep. (432 hrs.)June 4, 07-Oct. 24, 2007
• Kepco Plant Services And Engineering Corp.Ltd.
1200 Combined Cycle Power Plant,Ilijan, Batangas City
Gas Turbined Dep.(432 hrs.)Nov. 14, 2007-Mar.19, 2008
• Personnel And General Affairs Department
KepcoIlijan Corporation, 1200 Combined Cycle Power Plant
(432 hours) June 20, 2008- Oct.17,2008
• Kepco Plant Services And Engineering Corp.Ltd.
1200 Combined Cycle Power Plant,Ilijan, Batangas City
Electrical and Instrumentation Department
(432 Hours) Dec. 9, 2008- March 30, 2009
Duties and Responsibilities
• Assist and troubleshooting with co-technicians.
• Calibration of all instruments such as transmitter, pressure gauge,
and valve positioner.
• Preventive maintenance and testing witness.
• Installation of instruments and equipment for job order.
Character References
Dr.Dominciano C. Silang
CIT College Dean, Batangas State University, Alangilan Campus
Mr. Randy Silang (091********)
Korea Plant Services Corp. Ltd (safety officer)
Mr. Michael G. Mariano (091********)
(Supervisor Instrumentation Dep. Asia Brewery Inc.)
Now at Nestle Phil. Laguna
I hereby certify that the above information is true and correct from the best of my
knowledge.
RAY R. MANALO
Signature of Applicant