MARK SWINNEY

**** ********* ****

Sulphur, LA ***65

337-***-****

***********@*****.***

CAREER PROFILE

Experienced electrical and instrumentation inspection and construction

management professional with proven success in oil and gas, utility,

refinery, petrochemical, and energy companies. Strong ability to mange

projects from concept to completion that are finished on time and within

budget. Demonstrated skills in leading teams that meet and exceed business

goals and expectations. Expertise in solving challenging tasks. Well-versed

in safety measures.

AREAS OF STRENGTH AND EXPERTISE

Team Leadership Process Implementation Vendor Relations

Training/Mentoring Strategic Planning & Analysis Project Management

Customer Service Budget Analysis and Bidding Safety Evaluations

PROFESSIONAL EXPERIENCE

Enlink Midstream, Various Locations 2013 to Present

Instrumentation Electrical Inspector Construction Manager

Responsible for overseeing teams of 20-30 workers constructing all

associated electrical and instrumentation for $7-$10M new pipeline booster

stations in Liberty, TX; Eunice, LA; and Egan. LA. Attend bid and pre-job

meetings with awarded contractors. Work with various MCC building

manufacturers for factory acceptance tests to ensure buildings meet

contract compliance standards. Approve change orders for T&M work and

tracked these costs daily. Supply daily reports to project management. Lead

weekly conference calls with project manager and contractors. Liaise with

third-party engineering firms to resolve drawing conflicts. Redline

drawings as needed. Coordinate with vendors and operations for pre-

commissioning, commissioning, and start-up.

Key Accomplishments:

. Successfully install special equipment including Allen Bradley Control

Logics 5575 PLC, MCC building with Siemens 5kv switchgear and 480v

Square D switchgear, 13.8kv/5kv & 5kv/480v transformers, 1250hp 5kv

Toshiba motors with horizontal booster pumps, 480v Motortronics "soft

starts" for motors ranging from 75hp to 350hp, 5kv Toshiba VFDs, cable

trays, duct banks, area groundings, fiber optics, intrinsically safe

equipment, Rosemount transmitters, Bettis actuators, gas detectors,

fire detectors, area lighting, pre-commission, commission, and start-

up.

Vector Electronics and Controls, Lake Charles, LA 2012 to 2013

Instrumentation Electrical Supervisor

Managed 20-30 I/E personnel in new construction and maintenance of plant-

wide facilities. Analyzed and coordinated engineering packages. Initiated

equipment/material requisitions. Coordinate with vendors and operations for

pre-commissioning, commissioning, and start-up.

Key Accomplishments:

. Successfully installed fiber optics plant-wide for communications

upgrade.

. Trained employees on 70E guidelines and on motor controls

troubleshooting and repairs.

Crain Brothers Oil and Gas, Sweet Lake, LA 2008 to 2012

Project Manager, Williams Midstream Station, Johnson Bayou, La.

Managed 60-70 employees of all crafts, subcontractors, and vendors for the

$15M rebuild of Williams Midstream, following the damage from Hurricane

Rita. Tracked daily cost, attended daily and weekly meetings with Williams

project management, and conducted daily safety meetings.

Dispatcher

Accountable for scheduling all crafts, personnel, and equipment to meet

customer needs. Provided bids for customer projects. Completed and

distributed administrative paperwork and entered in computer system.

Key Accomplishments:

. Instituted preventive equipment maintenance program.

. Assisted Williams project management team with identifying critical

path for rebuild following hurricane.

. Achieved zero incidents for the Williams rebuild.

Rita Construction, Sulphur, LA 2002 to 2008

Owner

Managed all aspects of ground up construction on residential and commercial

buildings. Oversaw project bidding, material procurement, permits, and

supervising up to 40 employees and contractors.

Key Accomplishments:

. Instrumental in rebuilding the largest Outfitter Lodge on Gulf Coast

following Hurricane Rita.

Pinnacle West Energy, Phoenix, AZ

2001 to 2002

Lead Instrumentation Electrical Technician

Charged with helping develop and commission 4 GE Frame 7FA Gas Turbines at

1,000-Megawatt facility. Combined cycle with NEMS HRSGs and 2 Alstom Steam

Turbines utilizing MarkV and Bailey Infa Net90 controls.

Udelhoven Oilfield Services, Prudhoe Bay, AK/Caracas, VZ

2001

Lead Controls Technician/Instrumentation Electrical Technician

Started and commissioned two lm 2500 Turbines/Dresser Rand Compressors and

three Solar Gas Turbines. Established and implemented off-site pipeline

booster stations. Reviewed all associated instrumentation and electrical

devices.

Westlake Petrochemical Company, Sulphur, LA

1991 to 2001

Project Supervisor/ Instrumentation Electrical Maintenance Technician

Responsible for daily maintenance and troubleshooting of all 480v thru 13.8

KV Switchgear. Served as project supervisor for constructing a 138KV

Substation and 230KV Substation and start up and commissioning on two

Ethylene units, one Styrene unit, one Polyethylene unit, and one Ship

loading facility. Hired and directed construction contractors at start up

and commissioning phases. Spent two years on pipeline maintenance and off-

site skid operations.

Additional Professional Experience

Supervisor, Power and Control Systems, Runway Bay, Jamaica

Lineman, Gulf States Utilities, Lake Charles, LA

EDUCATION, TRAINING AND CERTIFICATIONS

Certified in the Essentials of Project Management, University of

Villanova, 2013

Electrician Apprenticeship 1982-1986

NCCER Certified

NFPA 70-E

TWIC Card