FRED K. ADZINKU
Laurel MD 20723 (703)
PROFILE
Skilled carpenter and seasoned professional project supervisor with a
strong work ethic and excellent attention to detail, budget and on-time
performance. Experience in both commercial and residential construction.
Dependable, quick learner and extremely capable of dealing with all types
of personalities and situations.
EDUCATION
Associate Degree from the Institute of Management Studies
OSHA Certified as General Industry Outeach Trainer and General Construction
Outreach
Experience working on SCIF-related and LEED certified projects.
EMPLOYMENT HISTORY
2007 - present PSF CONSTRUCTION, LLC. (Independent Contractor)
Perform general and sub-contractor jobs in both commercial and residential
construction. Specialize in carpentry, drywall and paint. Supervise
electrical and plumbing jobs.
1997- 2009 Project Supervisor
M2 CONSTRUCTION (Formerly Mark Construction Group), Leesburg,
VA
Supervise commercial buildouts and tenant improvements. Manage on-site sub-
contractors, include framers, drywall installers, electricians, plumbers,
HVAC, carpenters, acoustical ceiling installers and painters. Schedule sub-
contractors and county inspections. Recognized for on-time and accurate
performance.
1993 - 1997 Project Supervisor and Carpenter
PMA PROPERTIES, Alexandria, VA
Supervise and perform work on a variety of commercial and residential
projects, including framing, drywall, cabinet installation and painting.
Scheduled sub-contractors and inspections.
Resume
Fred Adzinku
1991 - 1993 Lead Carpenter
DAYSTAR CONSTRUCTION, Newington VA
Responsible for carpentry work of all types: framing and installation of
cabinets, doors, windows, crown molding, shoe molding, etc..
1990 - 1991 Carpenter
PETER WILSON DESIGN & CONSTRUCTION, Silver Spring, MD
Supervised other workers, reporting directly to the Project Manager.
Handled architectural remodeling projects, involving framing of walls,
closet racks, pocket doors, finishings, crown molding, bi-fold doors,
locks, windows and baseboards. Completed a townhouse in Georgetown and a
condo in the Watergate Building under budget and before the estimated
completion date.
1989-1990 Carpenter
RYAN HOMES, Alexandria, VA
Worked with little or no supervision, reporting directly to the Site
Engineer for pre-sales punch out work. Installed countertops, cabinets,
handrails, shoe molding, and crown molding. Installed drywall; painted.
Performed punch-out with outstanding results for townhouses at Duke Street
Station Project.
1988-1989 Carpenter
GEORGETOWN DEVELOPMENT GROUP, Washington, DC
Responsible for framing, finishing and restoring old doors and windows in
Georgetown area condos. Worked unsupervised and reported directly to the
site Engineer. Performed framing jobs, finishing and cabinet work;
installed locks, baseboards, custom mantels, handrails and stair rails.
Because of quick learning ability coupled with fast and accurate work
habits, received raises at very short intervals and was assigned to larger
houses.
LANGUAGE
ABILITY: Fluent in English and French.
REFERENCES: Furnished upon request.