ANTONIA CHAMBERS
***** ********** *****, **********, ** 30005
*******.********@*****.***
OBJECTIVE:
To gain the position of a Wireless Project Manager where my ten years of progressive
telecommunication wireless experience will contribute towards the growth of the organization..
SKILLS/KEYWORDS:
SPRINT-SITERRA, MS OFFICE, NSN, COP, DAS
ALU-FST, RRU, RBS 3106, 3206, GPS, CONSTRUCTION MANAGEMENT, PM
ERICSSON- SITE HANDLER, INTEGRATION, COMMISSIONING, LTE, SMALL CELL
TEMS, 4G, VOLTE, VOIP, NOC, SITE AUDITS, FIBER, LMR
WORK HISTORY:
NATIONAL CELL SITE CONSTRUCTION MANAGER (ALU/SPRINT) JAN. 2013-DEC. 2014
MPI INDUSTRIES, LLC – BOSTON, MA, REMOTE WORK FROM HOME IN GA
• Responsible for the overall planning, budgeting, and document keeping aspects of the cell site
closeout process for Sprint’s Network Vision and 2.5 Commissioning and Integration Project
• DEVELOPED AND EXECUTED STRATEGIC PLANS IN ORDER TO ENSURE THAT QUALITY COP (CLOSE OUT PACKAGES) WERE
DELIVERED
• EXTENSIVE KNOWLEDGE OF SPRINT’S SITERRA AND ART TOOL DATABASES
• WORKED CLOSELY WITH UPPER MANAGEMENT TO MAKE SURE THAT THE SCOPE AND THE DIRECTION OF OUR PROJECT WAS
ON SCHEDULE
• PROJECT BUDGETED AT 300M
• ASSISTED ALU FINANCIAL TEAM EACH MONTH WITH MANAGING BILLING AND RECEIVABLES, ALONG WITH PROCESSING
SAF
VENDOR SUBMITTED
• IDENTIFIED THAT ALL OOS SUBMITTED INVOICING WAS CORRECT AND APPROVED
• MANAGED TIGER TEAMS ON BLITZ CLEANUP PROJECT
• TRAINED FIELD CMS AND GC ON THE PROCESSES INVOLVED IN COMPLETING CLOSEOUT PACKAGES
• HELD QUARTERLY SAFETY AND QUALITY MEETINGS FOR THE NE REGION.
• CONDUCTED WEEKLY MEETINGS WITH PROJECT TEAM TO DISCUSS CHANGE ORDER REQUESTS, QUALITY ISSUES, AND ANY
RISKS, ASSUMPTIONS OR CONSTRAINTS IN REGARDS TO THE PROJECT
• BUILT STRONG SOLID WORK RELATIONSHIPS BY PROVIDING TIMELY, ACCURATE, AND HIGH QUALITY INFORMATION TO OUR
CUSTOMER AND UPPER MANAGEMENT
• REVIEWED AS-BUILT/RED-LINED CD’S AS NEEDED
FIELD CELL SITE CONSTRUCTION MANAGER (ALU/CSPIRE) MAY 2012-JAN.2013
MPI INDUSTRIES, LLC – JACKSON, MS AND BILOXI, MS
• SCHEDULED PRE-CONSTRUCTION SITE WALKS WITH GC’S TO IDENTIFY ANY PRE-EXISTING CONDITIONS PRIOR TO
CONSTRUCTION START
• HELD SAFETY MEETINGS, INSPECTED ALL PERMITS, AND MADE SURE THAT ALL EQUIPMENT USED ON THE TOWERS WERE IN
PROPER WORKING CONDITION
• SIGN COMPLETED JSA FORMS
• ATTENDED DAILY MARKET CALLS WITH ALU MARKET LEAD FOR SITE CONSTRUCTION STATUSES AND SAP APPROVALS
• OBTAINED ANY SPECIAL PERMITS/CLEARANCES NEEDED TO GAIN ACCESS TO GOVERNMENT RESTRICTED AREAS
• CREATED BOM’S ( BILL OF MATERIALS) FOR EACH NEW CELL SITE AND UPLOADED PDF TO FST
• REVIEWED ALL CLOSEOUT DOCUMENTS AND PHOTOS
• INFORMED RF TEAM OF ANY NEED CHANGES TO BE MADE TO THE SITE’S RFDS
• SCHEDULED POST-CONSTRUCTION SITE WALKS WITH GC, SIGNED ANY RED-LINED CD’S
COMMISSIONING ENGINEER/TEAM LEAD MAR.2012-MAY 2012
NEW WORLD TECHNOLOGY, INC. – DALLAS, TX
• NSN (NOKIA SIEMENS NETWORK) FLEXISWAP PROJECT
• PREFORMED INSTALLATION, COMMISSIONING, AND INTEGRATION OF NOKIA FLEXIBTS
• SOFTWARE AND HARDWARE UPGRADES
• CLEARED ON-SITE ALARMS
• MONITORED ANRITSU SWEEPS TESTING FOR VSWR, RETURN LOSS, AND DTF
• PERFORM FUNCTIONALITY TESTS (VIDEO CALLS, MMS)
• SITE ACCEPTANCE
Dec.2011-Mar.2012
CONSTRUCTION MANAGER (ERICSSON/T-MOBILE/CLARO)
Tangent International – San Juan, PR
• Supervised equipment delivery and installation
• Antenna and RRU swaps
• Integrated 1st and 2nd carrier UMTS equipment
• Coordinated the day-to-day activities of both the contractors and the vendors while they finished up
final punch lists and site walks
• QC/QA
• Maintenance window site cut-overs
Field Test Supervisor (Ericsson/AT&T)
ASTRON CONSULTING – NEW YORK CITY AND THE SURROUNDING BOROUGHS, NY JAN. 2011-JULY 2011
• FOLLOWED ERICSSON MOPS, TEST PLANS
• INSTALLED RAX/TX60 BOARDS INTO 3206 UMTS CABINETS ALONG WITH 2 ND
CARRIER RADIOS AND FILTERS
• REPOSITIONED RF LTE JUMPERS
• INSTALLED SIAD, MU, FIBER, GPS AND GPS RECEIVERS
• EMAS, SITE HANDLER, DAM, DUL SCRIPTING
NETWORK INTEGRATION CARRIER ADD ENGINEER (ERICSSON/TMO) JULY 2010-JAN 2011
AVENGER ENGINEERING – BILOXI, MS
• INTEGRATED BOTH 1 2 UMTS 3206 CABINETS
ST ND
AND CARRIER
• INSTALLED RAX/TX60 CARDS FOR NATIONWIDE LTE UPGRADE
• PROVIDED DETAILED DRAWING OF ALL THE OTHER CARRIERS IN THE CELL SITE COMPOUND
• TOOK PRE AND POST INSTALL PHOTOS IF THE EQUIPMENT AND THE COMPOUND
MICROWAVE PATHING TECHNICIAN (NEW WORLD TECHNOLOGY/CLEARWIRE) FEB.2009-MAR.2010
TEKSYSTEMS – GREENSBORO, HIGH POINT, WINSTON SALEM, NC
• RESPONSIBLE FOR THE INSTALLATION AND PROGRAMMING OF DRAGONWAVE’S HORIZON DUO MODEM, CERAGON
MODEM, ORTHOGONS, PTP600/400 MICROWAVE EQUIPMENT
• RAN -48V POWER CABLES FROM BREAKER BOX TO THE EQUIPMENT CABINET
• CLEARED TROUBLE TICKETS DURING THE MAINTENANCE WINDOW WITH THE NOC
• LOADED SCRIPTS CONTAINING FREQUENCY, CAPACITY, AND TX POWER INFORMATION
• ACHIEVED TARGET RSL LEVELS THAT WERE WITHIN A -2DBM ERROR MARGIN
• WORKED WITH COMMISSIONING TEAM TO BRING NEW SITE BUILD ON AIR
• CPP CERTIFIED
• PROVIDED CUSTOMER SUPPORT BY GOING OUT ON TRUCK ROLLS TROUBLESHOOT CLEARWIRE MODEM ISSUES
SWITCH SITE AUDITOR (BRIDGE NETWORKS/SPRINT) APR.2008-JAN.2009
TEKSYSTEMS – CHARLOTTE, NC AND NORFOLK VA
• PERFORMED SWITCH AUDIT ON ALL CONNECTED EQUIPMENT
• RESPONSIBLE FOR LOCATING DSX1/DSX3/ODX
AND DOCUMENTS ALL BAY POSITIONS ALONG WITH
LEC/MANRING LOCATIONS
• INPUT RELAY RACK, PATCH PANEL, AND PORT LOCATIONS OF THE EQUIPMENT ASSOCIATED WITH THAT SWITCH
• DOCUMENTED ALL OC3/OC12 MOTOROLA INFORMATION
• T1 AGGREGATORS
• SPM, VPU, MGX, DTC, VM NORTEL
• GATHERED ALL ONSITE INFORMATION AND CREATED A PLAN THAT WOULD ENSURE THAT THE SWITCH WAS ENERGY
EFFICIENT
EDUCATION:
SURRY CENTRAL HIGH SCHOOL – DIPLOMA 2002
10+ YEARS OF TELECOM EXPERIENCE IN VARIOUS ROLES
CERTIFICATIONS:
CPR
CPP CONNECTORS
ERICSSON HS1/B3
REFERENCES:
AVAILABLE UPON REQUEST