RISALIETH TORREGOSA TALLE
Mobile Number:+639*********
Email add: *********.*****@*****.***
W O R K E X P E R I EN C E
July 1, 2014 – Present CARRASCAL NICKEL CORPORATION
BUN-OT, CARRASCAL, SURIGAO DEL SUR
Survey and Design Engineer
1. Manage the survey team.
2. Update the mining map accomplishment.
3. Design structures needed in mine site (silting pond, buildings and roads) and SDMP projects (buildings and roads)
4. Cost Estimates
5. Conduct survey using total station and gps rtk
6. Plot all survey data.
7. Manage the carpentry works
Nov. 16, 2013 – May 16, 2014 THPAL NICKEL CORPORATION
TAGANITO, CLAVER, SURIGAO DEL NORTE
SDMP Civil Engineer
1 Prepare Program of Works on the approved projects.
2 Prepare the detailed estimates on the approved projects.
3 Participate in the preparation of bidding.
4 Inspect the projects if it follows the design stated on the plan and quality of works.
5 Check the actual accomplishment and the progress billing of the contractor.
Nov. 2008 – Nov. 2011 RAPID METAL DEVELOPMENT KWIKFORM
ABU DHABI, UNITED ARAB EMIRATES.
Design Draft person
Project Involved:
MAFRAQ INTERCHANGE (The tallest land bridge in United Arab Emirates.)
Responsibilities:
1. Lay-out, drafting and detailing the different scaffolding of the bridge.
2. Quantify the scaffolding and formworks equipment for the bridge.
Buildings, Tunnels, Water Tanks and Other Structures
Responsibilities:
1. Design the scaffolding for slab, walls and column in safe but economical.
2. Drafting and detailing the scaffolding for slab, walls and column.
3. Prepare structural analysis
4. Quantify the scaffolding and formworks equipment.
5. Coordinates with the salesmen.
1
6. Interacts and explain to the sales men and the client if there is technical problems arise.
7. Make sure that the client satisfies the design made.
8. Site visit if needed.
May 2004 – September 2008 HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD. Ubay, Bohol
Philippines
Bohol Irrigation Project Phase II, Irrigation Component
Construction of Irrigation Canals and Appurtenant Structures (BHIP 2-C-2)
P 580,000,000.00 Cost of Project
Quantity Surveyor/Office Engineer
Responsibilities:
1. Plotting and drafting the plan and profile of canal and laterals.
2. Plotting and drafting the cross sections of canal and laterals.
3. Compute the volume of excavation and embankment based on the cross section of canal and laterals.
4. Structural detailing of structures ( drainage pipes, box culvert, turnout, thresher crossing, rcpc crossing, foot
bridge)
5. Prepare bar bending schedule and bar bending diagram of steel bars for the fabrication
6. Compute the quantity of steel bars and volume of concrete in every structure.
7. Prepare the computation of mass diagram and plot the mass diagram (support the payment of waste
disposal).
8. Prepare Back –up computation to Support the Monthly Billing and Prepare Monthly Billing.
9. Prepare the back-up computations to support the Firm-up Quantities (Change Order In DPWH Project
Prepare As-Built Quantities (Final Quantities) to support the Final Billing (Final Payment).
June 2003 – March 2004 ABOITIZ CONSTRUCTION GROUP OF COMPANIES – GORONES DIV. Carcar, Cebu
Structural Ovellay Component
Barili-Carcar-Bato Road Project
Province of Cebu
P 600,000,000.00 Cost of Project
Quantity Engineer/Cad Operator
1. Prepare Monthly Report for the Consultant.
2. Quantity Take-off (earth works, concrete and steel bars).
3. Prepare Monthly Accomplishment.
4. Prepare Change Order and Variation Order.
5. Prepare Back-up Computation and supporting documents for Change Order.
6. Prepare Monthly Billing.
7. Prepare Backup For Monthly Billing.
8. Drafting and detailing the different structure.
Dec. 2002 – June 2003 ABOITIZ CONSTRUCTION GROUP INC. – GORONES DIV. Carcar,Cebu
Structural Overlay Component
Barili-Carcar-Bato Road Project
Province of Cebu
P 600,000,000.00 Cost of Project
Cost Engineer
1. Prepare Backup for Monthly Billing & Change Order.
2. Monitor the cost expenses of the project. ( labor costing, material costing and equipment costing).
3. Prepare Monthly Accomplishment Report.
February 2002 – Dec.2002 ABOITIZ CONSTRUCTION GROUP INC. – GORONES DIVISION Carcar, Cebu
Cadet Engineer
1. Monitor Sub-contractor Accomplishment.
2. Checking Sub-contractor Billing.
3. Quantity Take-off ( earthworks, bars and concrete).
4. Checking Sub-contractor Accomplishment in the Site.
2
Jan. 2000 – Feb. 2002 GETAFE MUNICIPAL HALL Getafe, Bohol
Engineering Assistant
1. Prepare bid Documents.
2. Prepare Billing and checking Billing.
3. Quantity Estimate.
4. Plotting of shop drawing ( Using Release CAD 14).
COMPUTER FLEXIBILITY
Microsoft Windows Applications
Auto Cad (Profecient)
Auto Cad Land Desktop
Word
Excel (programming)
Surpac 6.1.4 – Pit Design, Survey Plotting
Frame Ce –Structural Analysis and Steel Design
EDUCATIONAL ATTAINMENT
PASSED THE MATERIALS EXAMINATION March 2003
(DPWH ) MATERIALS ENGINEER 1
BACHELOR OF SCIENCE IN CIVIL ENGINEERING Graduated March 1998
Cebu Institute of Technology
N. Bacalso Ave., Cebu City
PASSED CIVIL BOARD EXAM Nov. 1998
SECONDARY EDUCATION Graduated March 1993
Sto.Niňo Institute
Getafe, Bohol
ELEMENTARY EDUCATION Graduated March 1989
Getafe Elem. School,
Getafe, Bohol
PERSONAL INFORMATION
Date of Birth : August 7, 1976
Place of Birth : Tagbilaran City
Status : Married
Husband : Clint J. Talle
Location : Poblacion, Getafe,Bohol
REFERENCES
ANVAR SADAT
Engineering Manager
RMD Kwikform Middle East-Sharjah
*****.*****@***********.***
PETER THOMAS
Engineering Manager
RMD Kwikform Middle East-Abu Dhabi
Peteeer.thomas@rmdkwikform
3
4