Project Area Site Manager, Quality Control System Manager/ Site Safety and

Health Officer (SSHO)/Superintendent /Estimating - Responsible for

reviewing and submission of submittals, oversee all testing required for

project, inspect all materials and compare with specification requirements.

Conduct all preparatory, initial, & follow up meetings. Maintain testing

plan and submittal status log. Worked effectively with all government

representatives, subcontractors, and suppliers to insure a quality project

was completed on time and in compliance with the contract specifications

and drawings.

************@*******.***

PROFESSIONAL EXPERIENCE

Cell 386-***-****/ Home 386-***-****

Quality Systems Engineer/Superintendent

Company Name: Hydra Engineering & Construction, LLC

36 Jasper Thomas Rd

Crawfordville, Fl 32327

Project: Marine Corp Logistics Base, Albany, GA

Quality Systems Engineer

Company Name: J&S Construction Company, Inc.

1843 Foreman Drive I Cookeville, TN 38501

Projects: Ft Campbell, Ky /Whitman AFB, Mo / Ft Stewart, Ga

Quality Systems Engineer

Company Name: Great Lakes Dredge & Dock Company, LLC, Oak Brook, Illinois

Anna Maria/Gasparilla Project

CQC Manager/EHS Manager/Alternate SSHO

GTMO Cuba

Company name: Harry Pepper & Associates, Inc. Jacksonville, Fl.

Project Title: GTMO, Cuba - Building Child Development Center

CQC Manager / Alternate SSHO / Alternate Superintendent

Company Name: Atlantic Marine Construction, Inc (AMC), Virginia Beach,

Va.

Project Title: Richard Russell Dam, Elberton, Ga.

Construction Cost: $20 Million

Draft Tube Crane- Repainting & Mechanical Repairs in 30 day time frame due

to critical needs power plant. Lead abatement & full containment. Security

& Roadway improvements.

Tainter Gates Repair & Painting. Full containment & critical fracture

repairs. Not done since originally installed 30 years ago.

Received 3 safety awards from Army Corp of Engineers. 0 accidents or

injuries, Savannah District

Project Coordinator / Manager, Project Start-up & Turnover

Company Name: Amec Kamtech, Inc. Tucker, GA

Project Title: Southern Company/Ga. Power FGD Expansions

Start-up & Systems Turn-over for Expansion of Major Power Plants /

Commissioning/ QC /Test Term Validate (TTV) Project Turnover.

Project Site Manager / Superintendent / SSHO / CQC

Company Name: ESA Environmental Specialists, Inc. Jacksonville, Fl.

Project Title: (JAX) Jacksonville Naval Air Station, Jax, Fl.

Four 250,000 Gal above ground Water Towers. Refurbish & Paint with Lead

Abatement & Containment including Curtin Shield, Orange & White checker

board fashion on flight line

Project Title: (EPA)Environmental Protection Agency

Contract Digging of Deep Aquifer Wells, Missouri for the EPA to Dig 18

wells, 850 ft deep into the deep 2nd aquifer level due to contamination of

1st aquifer level thru out Southern Mo.

Drafting & Design

Company Name: Suwannee River Log Homes, Wellborn, Fl.

AutoCAD work for the design & building of Custom Log Homes.

Complete design of Foundations, Site Work, Floor Joists, Walls & Structure,

Roof Systems, Kitchens & all related accessories.

Electrical Design Engineer

Company Name: Vision Power Systems, Jacksonville, Fl.

On-Site Power Gen. Plants, Several 5 ~ 10MW Gen. Plants in NE. Dual Fuel w/

Heat Recovery & Prime Power. Project Commissioning.

Complete design & Start-up of 5-10MW Dual Fuel Diesel Gen Plants for Large

Industrial

Customers in the NE USA. Includes Parallel 6 Diesel Gens with Set-up

Transformers & MV Sw gear, Absorption Chillers, Remote Radiators, Diesel &

Natural Gas fuel supplies, Building & Foundations, HVAC & all support

Structures

CONTRACT POSITIONS

Project Manager / Engineer. Project Commissioning / Test Term Validate

(TTV) Project Company Name: Zap Elect. Orlando, Florida

Project Title: Iron Bridge Denitrification Additions WWTP

Electrical construction of $5 M WWTP Expansion, - 2 year project.

Project Manager / Engineer/ QA

Company Name: Paxson Electric; Orlando, Fl.

Project Title: Eastern Waste Water Treatment Facility

Electrical construction of $12 M New Waste Water Treatment Plant (WWTP),

-1 year project

Engineering, Design Dwgs & Specs, Mods, Contractual Compliance, QC

Management

Company Name: Reynolds Smith and Hills, AEP Inc .

Project Title: Modifications to Kennedy Space Center, Documentation of

dismantlement of last Apollo Launch Platform.

Shuttle Design Modifications & Renovations to Pads 39A & 39B., LEFT TTV

Launch equipment.

Aerospace and Defense efforts associated with NASA Endeavor

Company Name: White Electrical Construction Co. (Atlanta, Georgia &

Jacksonville, Florida)

Project Management (Office and In - Field), Estimating, Engineering, QC,

Drafting, Purchasing, Expediting, CPM's, Scheduling, Manpower Logistics.

Developed/created, Supervised and Managed - House Computerized Cost and

Estimating System. Project Commissioning / Test Term Validate (TTV)

Project Turnover.

Projects Included:

* Felt, Paper & Pulp Mills * Breweries

* Electric Substations/ * Power Plants

* High-rise Hotels/ * Tire Factories

Incl. Ballrooms, Restaurants, Commercial Areas, Rooms Underground Parking,

Emer. Power, etc. Various Chemical, Heavy Industrial & Commercial Projects

EDUCATION

. Sr Eng Tech, NICET, Sponsored by NSPE: Washington, DC: Cert.#039399:

6/89.

. Engineering, Building Codes, NECA, NFPA, 2006, NAVFAC & USACE Certified

2005 Management, NAVFAC & USACE ECAT Training

CERTIFICATIONS

. Quality Control Management for Contractors, U.S. Army Corps of Engineers

. Lead Abatement Cert.

. First Aid & CPR Cert.

. Certified Rigger

. OSHA 30 Hour for Construction

. OSHA 30 Electrical Hazards

. OSHA Fall Production

. OSHA Materials Handlings

. OSHA Cranes and Rigging

. OSHA Motorized Mobile Platforms

. OSHA Competent Peron

. OSHA Excavations

. OSHA Work zone Traffic\ Control

. OSHA Forklift Hazards

. OSHA Stairs and Ladders

. OSHA Concrete & Masonry

. OSHA Confined Space Entry

. OSHA Steel Erection

. OSHA Hand & Power Tools

. OSHA Fire Prevention

. OSHA Welding and Hot Work

. OSHA PPE

. OSHA Ergonomics in Construction