Post Job Free

Resume

Sign in

Engineer Project

Location:
Singapore, Singapore
Posted:
April 08, 2015

Contact this candidate

Resume:

PROFESSIONAL RESUME

of

TEODULO AYCO MAGDOZA

Singapore Address:

** ***** *** ***** #**-47

NV Residences Singapore 518194

Philippines Address:

Lot 55/56 Phase II Camella Homes Subdivision

Lawaan, Talisay City, Cebu Philippines. 6045.

HP : +65 96704165

HOME TEL NO. : +65 92230295

EMAIL : aco26t@r.postjobfree.com

SINGAPORE PR : IC No. S2712414C

PASSPORT NO. : EB9516207

DATE OF BIRTH : 17 February 1965

PLACE OF BIRTH : Antequera, Bohol Philippines

NATIONALITY : Filipino

RELIGION : Roman Catholic

CAREER OBJECTIVE :

To pursue a challenging career in the field of Electrical / Instrument /

Fire & Gas/ Telecoms Engineering Technology and to enhance my knowledge in

the Construction, Mechanical Completion and Commissioning in Oil & Gas

field.

SUMARY OF QUALIFICATION:

> A total of 22 years of active work experiences in the field of

Electrical, Instrument and Telecoms Engineering Systems involving design,

estimation, supervision implementation, installation, inspection and

maintenance.

> Also with extensive exposure in the areas of installation, mounting,

inspection, operation and maintenance of Mechanical &

Electrical/Instrument system covering Voltage up to 22 KV and below 100v

to Power Substation, Distribution lines, Power Generators, Switch Gears,

Motors and Controllers, Load Center, HMI, DCS, LAN/WAN, Telephone and

Security Card Access System, CCTV System and Fire Alarm System,

VSAT,(PA/GA),& TVRO.

> Also with strong experience in the Air Conditioning and Mechanical

Ventilation System (HVAC, AHU,

RCU, FCU, Chiller and Cooling Tower) Fire Protection System and Boiler.

EDUCATIONALBACKGROUND:

1989. : University of Bohol (Philippines)

Bachelor of Science Degree in Electrical Engineering

License Electrical Engineer of the Philippines

1984-1985 : Peoples Electronics Servicing

Electronics Vocational Course (Basic Electronics)

SEMINARS/WORKSHOP:

Mar 07, 2015 :Apply Workplace Safety And Health in Process Plant (EVER

SAFE Consultants)

Jan 07, 2013 :Travel Safety By Boat OPITO (SMTC GLOBAL)

Mar 26, 2009 :Safety Orientation Course Oil/Petrochemical (NTUC

Singapore)

Oct 12, 2007 :Shipyard Supervisors Safety Course (NTUC Singapore)

May 06, 2006 :Shipyard Safety Instruction Course (NTUC Singapore)

Oct 07, 2004 :Module 3 Communicating for the Knowledge Economy:

Speaking &

Listening (British Council)

Jul 12,13 2000 : Productivity Management Course (NTUC Singapore)

Oct 22, 1994 :Medium Voltage Switchgears/Substation for Commercial &

Industrial Plants Seminar

Jul 02, 1994 :Fundamentals of Illumination Design for Commercial &

Industrial Buildings (IIEE Phils.)

Mar 27, 1993 :Technical Seminar on Ind. Motor Controllers Basic & Hi-

Tech (IIEE Phils.)

TRAININGS:

11/11/13 to 19/11/13 :ELECTRO PNEUMATIC INDUSTRIAL CONTROL (MFI

Technological Institute)

18/03/13 to 25/03/13 :PNEUMATIC INDUSTRIAL CONTROL (MFI Technological

Institute)

07/01/13 to 09/01/13 :Basic Offshore Safety Induction & Emergency

Training with HUET EBS OPITO (SMTC GLOBAL)

07/10/12 to 10/10/12 :SEAMAN'S RECORD BOOK AND CERTIFICATES OF DISCHARGE

(MPA Seafarers Management Department Singapore)

28/04/05 to 29/04/05 :Customized Fire Fighting & Breathing Apparatus

Course

(Singapore Aviation Academy)

10/02/04 to 16/02/04 :Metal Scaffold Erection (Building & Construction

Authority, Singapore)

05/0796 to 27/09/96 :Air-conditioning Technician Training Program

(Utopia-Aire Singapore)

04/05/89 to 05/06/89 :Advance Summer Camp Training (MS-43) CL 89, Cebu,

Philippines

SPECIAL SKILL:

> Hands-On on Personal Computer, Laptop Installation, Repair Both

Hardware & Software

> Basic Knowledge in AUTOCAD

> Proficiency in English.

PROFESSIONAL EXPERIENCE:

April 2014 to December 2014

BRUNEL INTERNATIONAL S.E.A. PTE LTD

RATU NUSANTARA FPSO (M3NERGY) Project - : Keppel Benoi Shipyard, Singapore

POSITION : E&I Project Engineer (Installation, Mechanical Completion &

Commissioning)

JOB DESCRIPTION

> Supervised & performed Installation of Electrical and Instrument

Equipment and Systems.

> Supervised & performed Mechanical Completion scope of works.

> Supervised & performed line & resistance check for all electrical,

instrument cables both for power cable, control cable and antennas cable.

> Supervised & carry out hot loop check & testing for Process

Instrumentation; E&I Systems, Fire & Gas and HVAC System.

> Preparation of Electrical & Instrument inspection test record (ITR'S) as

per specification.

> Study and review vendors drawings documents and ensure implementation in

compliance with specifications.

> Conduct Electrical and Instrument inspection in the installation,

modification and fabrication done by contractors.

> Prepare site inquiries for Electrical & Instrument fabrication

installation and issues within the contractors.

> Prepares project work schedules progress monitoring and daily/ weekly

progress report.

> Attend safety meetings with various disciplines for Permit to Work

discussion.

> Able to liaise with Consultants, Authorities, Builders & Subcontractors.

> Able to guide and lead a team of in house work force & contractors.

August 2013 to March 2014

PACIFIC ORIENTAL PTE LTD

TELOK B & DAMAR A PLATFORM EXXON MOBIL Project - : Malaysia (Offshore)

POSITION :E&I Commissioning Engineer

JOB DESCRIPTION

> Supervised & performed Mechanical Completion & Carry over scope of

works.

> Supervised & carry out hot loop check & testing for E&I System

> Supervised Pre-Com & commissioning of E&I System (FM200, F&G, HVAC,

RMU 13.8KV Switchgear

& LV Switchgear

> Calibration, simulation, troubleshooting, of all process instruments

used to measure, monitor

records and controls different process variables such as flow,

pressure, level, temperature

and others. Pressure/Level/Flow Transmitters.

> Supervised the testing, simulation of motor interfacing at HMI and DCS

such as motor status signal, start/ stop command, manual/auto status, and

PSD interlock. Simulation and cause and effect testing of all emergency

and shutdown devices.

> Supervised the punch list clearing & prepare ITR/Check Sheet for client

approval.

> Preparation of all required systems for the start-up of Well Heads.

> Support of the operation for start-up of the two Well Heads (A10 & A16)

May 2013 to August 2013

BRUNEL INTERNATIONAL S.E.A. PTE LTD

FPSO N'GOMA SBM Project - : Keppel Tuas Shipyard, Singapore

POSITION : E&I and Telecoms Commissioning Supervisor (Mechanical

Completion & Commissioning)

JOB DESCRIPTION

> Supervised & performed Mechanical Completion scope of works.

> Supervised & performed line & resistance check for all electrical,

instrument & telecoms cables both for power cable,

control cable and antennas cable.

> Preparation of Electrical & Instruments inspection test record (ITR'S) as

per specification.

> Study and review vendors drawings documents and ensure implementation in

compliance with specifications.

> Conduct Electrical and Instrument and Telecoms inspection in the

installation, modification and fabrication done by contractors.

> Prepare site inquiries for Electrical/Instrument/Telecoms fabrication

installation and issues within the contractors.

> Prepares project work schedules progress monitoring and daily/ weekly

progress report.

> Attend safety meetings with various disciplines for Permit to Work

discussion.

November 2012 to March 2013

PACIFIC ORIENTAL PTE LTD

TELOK A PLATFORM EXXON MOBIL Project - : Malaysia (Offshore)

(Posting in SEADRILL WEST LEDA)

POSITION : Electrical Commissioning Engineer (Mechanical Completion &

Commissioning)

(Permit To Work Coordinator) PTW

JOB DESCRIPTION

> Supervised & performed Mechanical Completion scope of works.

> Supervised & performed line & resistance check for all electrical cables

both for power cable & control cable.

> Supervised & performed resistance check for all motors prior to pre-

commissioning.

> Performed High-pot Test for MV cable, transformer, HV switchgear.

> Contact Resistance Testing for Bus Bars & ACB's

> Commissioning for MV, LV Switchgears

> Attend safety meetings with various disciplines for Permit to Work

discussion.

September 2012 to October 2012

TEEKAY NAVION OFFSHORE LOADING PTE LTD

TEEKAY FPSO CIDADE DE ITAJAI PROJECT - Jurong Shipyard, Singapore

POSITION : E&I Commissioning Supervisor (Fire & Gas System Repair, MC &

Commissioning)

JOB DESCRIPTION

> Supervised all the repair Works & MC of Fire & Gas System (Gas Detectors,

Flame Detectors, Smoke Detectors, Heat Detectors, O2 & H2S Detectors, ESD

Signals & Feedback, CO2, Fire Hydrant).

> Supervised & performed line check for all Fire & Gas & HVAC cables,

Performed resistance check for all cables.

> Supervised & performed functional check for all F&G Detectors, hot-loop &

functional check for all ESD signals and HVAC System function test.

> Supervised & performed as Boardman for Fire & Gas and HAVC System, cause

and Effects Testing for Fire & Gas System.

July 2012 to September 2012

EFAF ENGINEERING SERVICES

ABB HV/LV ELECTRICAL PROJECT - Island-wide, Singapore

POSITION : Electrical Engineer (Testing & Preventive Maintenance

Servicing)

JOB DESCRIPTION

> Transformers, HV and LV Switchboard Servicing, HIGH POT Testing, Partial

Discharge.

> IR Scanning for all ACB, CB, Bus Bars joints, Primary & Secondary

Injection Testing for Relays.

> Contact Resistance Testing for Bus Bars & ACB's, Performed resistance

check for all cables.

> Perform rack-in & rack-out of LV & HV Circuit Breakers and Isolator

Switch.

May 2012 to June 2012

OGRE PTE LTD

SBM FPSO CIDADE DE ANCHIETA PROJECT - Keppel Tuas Shipyard, Singapore

POSITION : E&I Comp-EX Inspector (Mechanical Completion, Commissioning)

JOB DESCRIPTION

> Detail visual inspection of all hazardous area, ex certification

instrumentation and to ensure installation and equipment meet relevant

standards IEC 60079-10.

> Visual inspection for complete and corrective installation of unit

control panel.

> System wiring matching, System cabinet wiring trouble shoot.

> In addition, cable schedule. Inspect electrical apparatus and Instruments

for hazardous area requirements like zone, category, class/division and

EPL category. Comp 'Ex'.

> Performed Equipment & System preservation using plastic, canvass, DENSU

Tape for enclosures.

> Curing of punch-list, daily job progress and coordinating with

engineering department for design modification methods of

protection(ATEX),and intrinsically safe hazardous area equipments

installations. Review document's prior to ELECTRICAL and INSTRUMENT

completion acceptance before START-UP. Reporting to the senior

construction manager.

January 2012 to March 2012

BW OFFSHORE SINGAPORE PTE LTD

BWO FPU JOKOTOLE PROJECT - Sembawang Shipyard, Singapore

POSITION : E&I Commissioning Engineer (Fire & Gas System Mechanical

Completion & Commissioning)

JOB DESCRIPTION

> Supervised & performed Mechanical Completion Works of Fire & Gas

System(Gas Detectors, Flame Detectors, Smoke Detectors, Heat Detectors,

O2 & H2S Detectors, ESD Signals & Feedback, CO2, Fire Hydrant).

> Supervised & Performed line check for all Fire & Gas cables.

> Supervised & Performed resistance check for all cables.

> Supervised & Performed functional check for all F&G Detectors.

> Supervised & performed Hot loop check and functional check for all ESD

signals.

> Supervised & Performed as Boardman for Fire & Gas System.

Feb 2011 to December 2011

ASIAPAC COMMISSIONING SERVICES PTE LTD

MODEC BP ANGOLA PSVM FPSO PROJECT-Jurong Shipyard, Singapore

POSITION : Senior Electrical Project Engineer (Installation, Mechanical

Completion & Commissioning)

JOB DESCRIPTION

> Supervised & Performed Mechanical Completion scope of works.

> Supervised & Performed Equipment & System preservation using plastic,

canvass, DENSU Tape for enclosures.

> Supervised Inspection, testing, site surveys all the electrical system.

> Supervised & Performed line check for all electrical cables both for

power cable & control cable.

> Supervised the testing of equipment and control systems Main

Switchboards, Emergency Switchboards, Perform IR Scan for all ACB, CB,

Bus Bars joints.

> Perform rack-in & rack-out of LV & HV Circuit Breakers and Isolator

Switch.

> Testing of LV & HV Power Cables using Megger Tester.

> Performed High-Pot Test, check operation of protection relays, testing

either Primary or Secondary Injection.

> Record all data during testing for ITR clearing.

September 2010 to January 2011

MEGGAWATTS ENGINEERING SERVICES PTE LTD

SEA DRAGON II SEMI-SUBMERSABLE PROJECT - Jurong Shipyard, Singapore

POSITION : E&I Project Engineer (Electrical & Instrument Installation &

Mechanical Completion)

JOB DESCRIPTION

> To carryout revision of drawing, job technical evaluation, planning,

supervision and co-ordination for, loop-check, pre-commissioning works.

> Preparation of Electrical & Instrument inspection test record (ITR'S) as

per specification.

> Study and review vendors drawing/ documents and ensure implementation in

compliance with specifications.

> Conduct Electrical and Instrument inspection in the installation,

modification and fabrication done by contractors.

> Prepare site inquiries for Electrical/Instrument fabrication installation

and issues within the contractors.

> Prepares project work schedules progress monitoring and daily/ weekly

progress report.

June 2010 to August 2010

WARTSILLA SINGAPORE PTE LTD

SBM OKHA FPSO PROJECT - Keppel Tuas Shipyard, Singapore

POSITION : E&I/Telecoms Supervisor (Telecoms & Instrument Inspector

and Mechanical Completion)

JOB DESCRIPTION

> Pre-commissioning and commissioning of the following FPSO

Telecommunication Systems: Metereological Systems (windspeed and

direction, cloudheight ceilometer, helideck motion sensor, stevenson

screen pressure, air and humidity sensor, current sensor), UHF system

field, UHF repeater Radio System, VHF Aeronautical Radio system, VHF

Marine Radio System, Non-Directional Beacon System, Closed Circuit

Television(CCTV) VSAT (stabilized antenna), B & D Local Area Network

(LAN), Wide Area Network (WAN) Public Address and General Alarm (PA/GA),

TVRO Entertainment System, Line Of Sight (LOS), PABX System, Inmarsat

System, Collision Avoidance Radar System, Gyro Compass System.

> Visual inspection for complete and corrective installation of unit

control panel.

> In addition, cable schedule. Inspect Telecoms apparatus and Instruments

for hazardous area requirements like zone, category, class/division and

EPL category. Comp 'Ex'.

> Curing of punch-list, daily job progress and coordinating with

engineering department.

> Review document's prior to TELECOMS and INSTRUMENT completion

acceptance before START-UP. Reporting to the senior construction

manager.

August 2009 to April 2010

PAN GREATWAYS ENGINEERING PTE LTD

BW OFFSHORE CASCADE & CHINOOK FPSO PROJECT

POSITION :E&I Project Engineer (Electrical & Instrument Installation &

Mechanical Completion)

JOB DESCRIPTION

> Supervise technical staffs and contractors activities for optimum

availability, efficiency for ongoing installations for E&I systems .

> Supervised, coordination, monitoring and implementation of all E&I

activities, addition/alteration, upgrading and/or refurbishment works of

the project.

> Performed mechanical completion inspection, Punch clearing, commissioning

of Ship's HVAC Air Conditioning System such as Chillers, Air-handling

Unit (AHU), and air Dampers. Assisted in final testing/simulation of HVAC

associated with the fire and gas systems cause and effects.

> Performed Instrument loop-checking, calibrations and commissioning of

both existing and newly installed instruments such as pressure, level,

temperature, flow transmitters(SMART Protocol instruments)and control

switches; inside the engine room, oil cargo pump room, topside modules,

and ship's forward rooms equipments; do tubing installation and also

pressure leak testing on supply and impulse line tubing's, loop testing,

and simulation/activation test from field instruments and unto DCS.

Performed testing and simulation on hydraulic system, cargo and ballast

tanks hydraulic valves.

> Attend to meetings and prepare monthly report for submission to client

and management.

> Supervised & Troubleshoot faults, undertake root cause analysis and

ensure system recovery.

March 2009 to July 2009

PAN GREATWAYS ENGINEERING PTE LTD

CHEVRON ORONITE EXPANSION PROJECT

Chevron Oronite Pte Ltd, Jurong Island Singapore

POSITION : M&E Project Lead (M&E Installation & Commissioning)

JOB DESCRIPTION

> Responsible for the project cycle initiation to closure and covering

functions as a Project Engineer.

> Execute Mechanical & Electrical works and Supervise and monitor all site

work.

> Liaise with Clients, Project Manager, sub-contractors and suppliers.

> Site technical, coordination and safety meeting HVAC; Mechanical &

Electrical & Other Discipline.

> Able to liaise with Consultants, Authorities, Builders & Subcontractors.

> Able to guide and lead a team of in house work force.

> Manage the overall project planning, propose and implement corrective

actions to ensure smooth delivery of project.

> Provide the project evaluation and project status to management on a

regular basis.

> Good knowledge in extracting VO's and preparing quotation.

September 2008 to February 2009

PAN GREATWAYS ENGINEERING PTE LTD

PROSAFE PETROBRAS FPSO CIDADE DE

SAO MATEOS PROJECT - Keppel Tuas Shipyard, Singapore

POSITION : E&I Senior Commissioning Supervisor (E &I Inspector MC and

Commissioning)

JOB DESCRIPTION

> Supervised & carry out hot loop check & testing for process instruments;

E&I System.

> Supervised & Carry out loop testing, calibration, simulation,

troubleshooting, of all process instruments used to measure, monitor,

records and controls different process variables such as flow, pressure,

level, temperature and others. Pressure/Level/Flow Transmitters.

> Supervised the Testing, simulation of motor interfacing at HMI and DCS

such as motor status signal, start/ stop command, manual/auto status, and

PSD interlock. Simulation and cause and effect testing of all emergency

and shutdown devices.

> Familiar in working with instruments use in Distributed Control System.

> Responsible for the DCS P&ID, I/O List, Shop Drawings, Instrumentation

Location Layout, Isometric Drawings Details for DCS.

> Prepare & sign for all the ITRs for the completed hot loop

check/functional check from CCR to Field Instrument, and submit to the

PIMS to clear PC ITR.

January 2007 to August 2008

PAN GREATWAYS ENGINEERING PTE LTD

CONOCO PHILIPS BOHAI FPSO PROOJECT

Sembawang Shipyard, Singapore

POSITION : Telecoms Lead Engineer(Project Management Team SSPL)

JOB DESCRIPTION

> In-charge of the TELECOM System Installation for the BOHAI FPSO Project

from Conoco Phillips. Responsible for the installation, carry over works.

> Perform weekly progress report & submit to the Manager.

> Review, check, approved & signed Inspection Test Record (ITR) sheet,

prepared by TELECOMS Supervisors. Coordinate and liaise with vendor and

contractor's representative in the field concerning work progress,

outstanding issues and other related matters.

> Supervise installations, pre-commissioning & commissioning of

Telecommunications equipment.

> Attend Tri-party inspection with client and contractors.

> Responsible for punch list items and mechanical completion work scope.

March 2005 to November 2006

PAN GREATWAYS ENGINEERING PTE LTD

SAKHALIN ENERGY INVESTMENT COMPANY

LNG PLANT CONSTRUCTION (CHIYODA-TOYO SAKHALIN DEPARTMENT)

POSITION : E&I Project Engineer (E &I Installation Testing &

Commissioning)

JOB DESCRIPTION

> To carryout revision of drawing, job technical evaluation, Planning,

supervision and co-ordination for, Loop check, Pre-commission and

commissioning.

> Conduct Electrical and Instrument inspection in the installation,

modification and fabrication done by contractors.

> Prepare site inquiries for Electrical/Instrument fabrication installation

and issues within the contractors.

> Assist client to modify system connections due to changes of design.

Responsible for scheduling and distribution of job orders.

> Compiling all as-built drawings and update latest revision as per

Engineering design for proper documentations and references.

> Attend daily meetings with client, subcontractors for work progress and

technical aspect.

August 2001 to February 2005

System on Silicon Manufacturing Company PTE LTD

WAFER FAB MANUFACTURING COMPANY

Pasir Ris Industrial Drive 1, Singapore

POSITION : Facilities Senior Associate Engineer (Facilities Maintenance

& Additional Installation Project)

JOB DESCRIPTION

> Operate and maintain facilities systems such as Control, Electrical, Air-

conditioning and Mechanical Ventilation Systems, Fire Protection &

Detection, Ultra Pure Water, Clean-room System, Industrial Waste

Treatment Plants and Chemical and Gas Systems for a Wafer Fabrication

plant.

> Review of system status in FMCS and alarm analysis, Trouble-shooting

Facilities alarm response & service normalization, Perform scheduled

preventive maintenance (PM).

> System calibration on a timely basis, Perform first line incident

handling, alarm response & breakdown repair works as well as

actively participate in ERT incident.

> Perform inspection rounds and manual data logging for facilities

systems, Perform facilities system isolation or lock out for after

office hours contractor works.

June 1996 to July 2001

UTOPIA-AIRE PTE LTD

M&E/SECURITY SYSTEM INSTALLATION & MAINT

Singapore Island-wide, & Regional

POSITION :Electronics & Air-Conditioning Engineer (Security System & Air-

con Installation & Maintenance)

JOB DESCRIPTION

> Lead a team of Technical Officers in performing installation T&C,

preventive maintenance and corrective maintenance of mechanical &

electrical systems such as air-conditioning equipment.

> Perform instrumentation set up and testing of refrigeration systems

> Perform service and maintenance of laboratory and test cell facilities.

> Lead and performed in calibration of test equipment, & particle counters

for Clean-room monitoring.

> Security System (Card Access System) Installation, T&C and maintenance.

January 1994 to April 1996

METRO (GAISANO) AYALA CENTRE

COMMERCIAL BUILDING PROJECT & MAINTENANCE - Cebu City, Philippines

POSITION : Engineering Department Head (Building Facilities

Installation & Maintenance)

JOB DESCRIPTION

> Supervise and direct the performance of repair jobs scheduled by Building

Maintenance Section Head. Evaluates and presents for interview request

for new equipment and recommends purchase of replacement parts.

Implement through assignment of tasks safety and fire prevention policies

and procedures.

> Review and check the completion of PMS with a regular report to the

Building Maintenance Section Head. Exercise effective control over tools,

materials and supplies through daily recording and monitoring. Provide

-on - the training and ensure subordinates compliance with established

policies and procedures. Evaluate performance, schedule training, leave,

and recommend action and movements of personnel.

> Review and ratify reports and communication prepared by subordinates,

materials and supply request. Prepare and submit for review budgeted

expenditures for headcount, services, training materials and supplies.

January 1991 to November 1993

SOCOR SHIPPING & CONSTRUCTION CORPORATION

YLLANA DREDGE PROJECT-Cebu City, Philippines

POSITION : Electrical Supervisor (Refurbish, Recondition & Repair

Testing and Commissioning)

JOB DESCRIPTION

> In-charge in all additional projects both Electrical, Mechanical and

Electronics works.

> Supervised hands-on in troubleshooting motor control devices, panel

boards of magnetic coupling with AC-DC power source, swing wench motor,

cutter motor, spud motor, ladder wench motor, synchronizing panel of 2-

600KVA GENERATOR SET.

> Supervised / Hands-on in rewinding governor motor, magnetic coil relay,

motor generator, 250KVA Generator (Caterpillar Brand). Excites 250KVA

Generator (Caterpillar Brand), 20KVA and 15KVA Generators (Denyo Brand)

Troubleshoot and repair all electrical and electronics equipment's /

devices.

> Routine preventive maintenance, servicing of all electrical switchboards,

switchgears, alarm & monitoring systems, fire detection and alarm

systems; generator automatic control systems; ships' automation &

instrumentation.

> Fault finding, rectification and repair works. Upgrading, modification,

extension and retrofitting works, Thermo-grapy works Supervised/Performed

INSTALLATION AND maintenance of HIROSS HIPOWER-T UPS SYSTEM.

REFERENCES:

Frederick Minoza

Manager/ SSPL - aco26t@r.postjobfree.com - +65 93514801

Felix F.Lanario

Company Site Rep -TOTAL CLOV Project - aco26t@r.postjobfree.com

-+65 98439488



Contact this candidate