Keith W. Sawyer

Objective Leadership position guiding an Operations/ Production/Engineering team

providing the opportunity to employ the skills, abilities and expertise I

Qualificatio have gained and demonstrated through my education and career

ns accomplishments.

Demonstrated success in leading an organization at the plant level through

difficult business conditions while dramatically improving safety, quality,

reducing costs and maximizing productivity.

Expert ability to develop technical professionals into a cohesive unit

providing a strong foundation upon which operational excellence was

achieved.

Extensive knowledge and accomplishments in all aspects of operations

execution, budget preparation and management at the plant and corporate

levels.

Demonstrated abilities to effectively interact and communicate with senior

executive team members, all levels of management, production personnel,

customers and external vendors & contractors regarding all aspects of a

manufacturing environment.

Professional September 2012 - Current - syncreon-U.S., York PA

experience Operations Manager - Logistics Supplier for Harley Davidson Motrocycles -

Inventory, Assemble & Sequence Parts to Harley Davidson Assembly Line

Responsible for all aspects of the management and scheduling of a two (2)

shift operation of 520 union associates to meet Harley Davidson's

production requirement

Responsible for (18) Salaried Supervisors & (2) Salaried Production

Managers

Responsible for developing and implementing safety, quality and operation

improvement initiatives

Implemented scrap reduction program featuring one by one root cause method.

Reduced monthly scrap from $80,000 to $20,000

Successfully coordinated relocation of 400,000 sq ft operation with no

impact to Customer,

Successfully launched new MY14 program in July 2013, meeting condensed

customer timing

Developed system to more effectively track customer driven OT to ensure

that all costs were recouped resulting in improved monthly EBITDA results

March 2011 - April, 2012 - Magna Composites, Salisbury, NC

Engineering Manager - Salisbury/Newton, NC Facilities - Heavy Truck

Composite Components - Molding, Machining, Bonding, Assembly and Painting

Responsible for the oversight of a Program Engineering Group of six (6)

engineers responsible for implementation of advanced planning, equipment

design and coordination of new program launches; providing design and

development support for cost and process improvement initiatives; Cost

estimating for all current and future programs.

Developed manufacturing plan to successfully launch the 2013 Kenworth Heavy

Truck Sleeper Roof. Met or exceeded PACCAR's build dates and requirements,

as well as ensuring compliance with Magna's TS 19649 procedures and

processes. Launch Date - May 2012. Responsibilities included product

costing, processes & capacity planning, tooling and capital requirement

planning. - $6.8 Million in Annual Sales

Successfully launched the 2012 Mercury Marine 150 HP Engine Cover Program.

Met Mercury Marine build dates and requirements, within budget.

Responsibilities included product costing, processes & capacity planning,

tooling and capital requirement planning. Program was challenging due to

being designed four (4) years prior to launch and sitting idle for (2)

years. Required to accommodate late design changes and still meet launch

timing - $5.0 Million in Annual Sales

Developed system to identify and track cost improvement opportunities. $7.0

Million in annual savings opportunities identified since May 1, 2011.

Projects totaling $2.4 Million in projected savings for 2012 have been

implemented and $4.0 Million identified as opportunities focusing on

process and operating improvements Material, Labor and Scrap.

July 1, 2010 - March 21, 2011 Ventra - Ionia, LLC, Ionia, MI

Manufacturing Engineering Manager - Ionia Facility - Steel Bumper Systems -

Stamping, Machining, Plating, Painting & Assembly

Developed and Managed an effective Manufacturing Engineering Group of eight

(8) professionals responsible for implementation of advanced planning,

equipment design and coordination of critical new program launches for

organization; providing design and development support for cost and process

improvement initiatives; Accurate cost estimating for all future programs.

Identified and tracked $3.5 Million in annual savings opportunities in

2010. Projects totaling $926K annually implemented July 2010 - March 2011

focusing on process and operating improvements Material, Labor and Scrap.

Developed strategic manufacturing plan to successfully launch the 2013 Ford

Taurus Chrome Grille assemblies in July 2012. Responsibilities include

product costing, processes & capacity planning, tooling and capital

requirement planning.

Responsible for actively managing Product Data Management (PDM), including

routings, BOM's, production standards, FMEA's, and plant capacities for

future and current programs.

October, 2009 - July 1, 2010 Ventra - Ionia, LLC, Ionia, MI

Plating Manager - Ionia Facility - Steel Bumper Systems - Stamping,

Machining, Plating, Painting & Assembly

Responsible for the development and oversight of an effective Plating

Department Group of twenty seven (27) salaried associates and one hundred

(100) hourly union associates. Responsible for the Plating Lab & Quality,

Production, Maintenance and Plating Controls.

Ensured Plating department prepared for plastic plating production level

increase to 89,000 plated parts per month in June 2010 from 8,700 parts per

month in 2009 with no significant erosion in FTC of 86%.

Successfully developed staffing and training levels to meet GM, Chrysler

and Ford requirements to provide plated plastic and steel parts to

specifications. Implemented third shift plastic plating in April 2010.

Coordinated and Implemented manufacturing plan to launch the Ford 2011

F250/350 Super Duty front plastic plated grille assembly in January 2010.

Program met all milestone dates and met or exceeded customer expectations.

Program launched with minimal quality concerns and met customer delivery

schedules. Approximately $11.9 Million in annual revenue

Coordinated manufacturing plan to launch the GMT Super Duty

Chevy/GMC/Denali plastic plated front grille assemblies in April 2010.

Program has met all milestone dates and met or exceeded customer

expectations. Program launched with no significant quality or delivery

concerns. Approximately $7.9 Million in annual revenue

Developed and implemented a level load schedule program for plastic plating

to provide clear and definitive production goals & objectives to management

as well as production associates. Line load efficiency increased from 77%

in March 2010 to 89% in July of 2010.

August, 2008 - October, 2009 Ventra - Ionia, LLC, Ionia, MI (Became part

of FNG July 2009)

Facilities & Engineering Manager - Ionia Facility - Steel Bumper Systems -

Stamping, Machining, Plating, Painting & Assembly

Responsible for a Manufacturing Engineering Group of thirty (30)

professionals responsible for implementation of advanced planning,

equipment design and coordination of critical new program launches for

organization; providing design and development support for cost and process

improvement initiatives; Cost estimating for all future programs; facility

infrastructure, capital refurbishments and management; MRO Inventory

Management

Developed and managed manufacturing plan leading to the successful launch

of the 2010 Ford Taurus Chrome Grille assemblies in July 2009 meeting

Ford's build dates and requirements. Responsibilities included all

processes, tooling and capital requirement implementations.

Developed and managed manufacturing plan to launch the Ford 2011 F250/350

Super Duty front grille assembly in January 2010. Program has met all

milestone dates and met or exceeded customer expectations. Responsibilities

included all processes, tooling and capital requirement implementations.

Developed and managed manufacturing plan to launch the GMT Super Duty

Chevy/GMC/Denali front grille assemblies in April 2010. Program has met

all milestone dates and met or exceeded customer expectations.

Developed plan and managed transfer of Current Dodge Ram Front bumper

program to Ionia from another FNG Facility in a (2) month time frame

without negative impact to Chrysler quality or delivery.

January, 2006 - August 2008 Meridian Automotive Systems, Ionia, MI

Plant Manager - Ionia Facility - Steel Bumper Systems - Stamping,

Machining, Plating, Painting & Assembly

Successfully developed and lead an effective and efficient Management Team

increasing performance in the areas of Safety, Quality and Cost

Improvement, achieving challenging organizational objectives and targeted

business performance metrics.

Achieved successful consistent record for reducing the level of recordable

incidents from 124 in 2005 to 77 in 2006 to 58 in 2007.

Successfully and repeatedly achieved superior results in exceeding

challenging business goals surpassing EBITDAR target of 19.2% achieving

20.3% in 2006 on Sales of $185 Million and again in 2007 exceeding goal of

22.0% and achieving 23.7% on Sales of $181 Million. Superior results

achieved through the application of MBS Kaizen Events, strategic Labor

Management initiatives and significant process improvements.

Reduced overall Plant Inventory in 2006 and 2007 by over $5 million;

reduced raw material by $2million; reduced vital Nickel inventory by 176K

lbs.

Achieved significant reduction in 2007 Overhead Costs reducing related

expensed by $8 million representing approximately 4% of Sales in 2007.

Responsible for leading strategic development and implementation of Plastic

Plating Process which made possible an additional $30 Million in Sales for

2008.

October, 2003 - January, 2006 Meridian Automotive Systems Ionia, MI

Industrial & Manufacturing Engineering Manager - Steel Bumper Systems -

Stamping, Machining, Plating, Painting & Assembly

Responsible for the development, implementation and oversight of an

effective Manufacturing Engineering Group of fifteen (15) engineers

providing increased support for cost and process improvement initiatives;

implemented advanced planning, equipment design and coordination of new

program launches for organization.

Successfully undertook responsibility for $7.0 million initiative involving

program and facilities equipment and related process implementation,

including overall management responsibility of internal WIP rack fleets for

all programs.

Designed and implemented multiple process improvements resulting in over

$900,000 annual savings for the organization in 2004.

Developed, implemented and managed strategic manufacturing plan leading to

the successful launch of the 2004 F150 Ford front and rear bumper

assemblies meeting Ford's critical milestones as well as ensuring

compliance with Meridian's QS-9000 and Ford Q-1 procedures and processes.

Responsible for managing Product Data Management (PDM) for five (5) FEM/REM

facilities, including routings, BOM's, production standards, FMEA's, and

plant capacities for future and current programs.

June, 2000 - October, 2003 Meridian Automotive Systems Ionia, MI

Manager of Plant Engineering for Exterior Plastics

Responsible for providing lead process, facility and construction

engineering management of eleven (11) multi-million $ SMC molding

facilities with annual capital budgets: 2003 - $13.5 Million. 2002 - $9

Million. 2001 - $8 Million. 2000 - $6.1 Million

Project Highlights

Designed, upgraded and relocated multi-million $ SMC (Sheet Molded

Compound) process to a refurbished facility in Grabill, IN - Complete May

2003. Capital: Building - $2.5 Million, Process upgrades & relocation -

$3.9 Million.

Designed and implemented an ultraviolet coating system, including upgraded

paint system, meeting GM specifications in Grabill, IN Facility. Met

expedited startup timeframe condensed to five (5) months to meet customer's

required program timing. Complete - June 2003. Capital: $2.3 Million.

Undertook Salisbury, NC Plant expansion to meet customer needs. Complete -

November 2003. Capital: $5.6 Million

Oversaw construction of Celaya, Mexico SMC molding facility and

implementation of new SMC Molding Operation. Coordinated transfer of

multiple programs for production. Coordinated installation of SMC prime

paint line. 2000 through 2002.

July, 1998 - June, 2000 Meridian Automotive Systems Ionia, MI

Manager of Industrial Engineering - Steel Bumper Systems - Stamping,

Machining, Plating, Painting & Assembly

Developed and managed IE Department of two (2) engineers focusing on

designing and implementing process improvements, Bills of Materials and

Routings accuracy; achieved results improving inventory tracking and

standard costing, accurate future program costing proposals for four (4)

Meridian facilities and launch and maintenance of MAPICS operating system

in Meridian facilities.

May, 1997 - July, 1998 Hayes-Lemmerz International, Inc. Howell, MI

Facilities Manager - Cast Aluminum Wheels. Casting, Machining & Painting

Lead a team of 31 (four (4) salaried project engineers, three (3) salaried

maintenance supervisors and twenty-four (24) hourly union general

maintenance associates) providing support in the production of cast

aluminum wheels. Responsibilities included day-to-day operations, capital

project planning and implementation, operation reliability improvements,

TPM systems, and facility maintenance and improvements.

May, 1995 - May, 1997 Hayes-Lemmerz International, Inc. Howell, MI

Facilities Engineering Supervisor- Cast Aluminum Wheels. Casting, Maching

& Painting

Lead a team of 4 ( two (2) salaried project engineers, one (1) facilities

technician and one (1) intern) responsible for the development and

implementation of capital projects, facility improvements, maintain

operation work standards and costs and provide manufacturing process

support.

August, 1994 - May, 1995 Hayes-Lemmerz International, Inc. Howell, MI

Industrial Engineer- Cast Aluminum Wheels. Casting, Maching & Painting

Responsible for successful implementation of work standards for machining

operations in a UAW environment. Managed implementation of acrylic clear

coating capabilities project for cast aluminum wheels. Implemented bulk

nitrogen storage and delivery system reducing annual nitrogen costs by

$132K.

March, 1994 - August, 1994 Ironton Iron, Inc (Division of Intermet)

Ironton, OH Industrial Eng

Responsible for developing and maintaining production standards.

Supervised implementation of rust preventative tumbler to replace drip line

resulting in annual material savings of $160,000.

August, 1990 - November, 1992 Frasier & Jones Co Syracuse, NY

Industrial Engineer

Responsible for developing and maintaining production standards, process

improvements, and development of capital projects.

February, 1988 - August, 1990 Grinnell Corporation Columbia, PA

Manufacturing Engineer

Responsible for developing and maintaining production standards, process

improvements, and development of capital projects. Key responsibility in

development and justification of successful installation of $10 million

foundry mold operation.

July, 1981 - February, 1988 Crouse-Hinds Company Syracuse, NY

Manufacturing Engineer

Responsible for developing and implementing process improvements.

Education 1977 - 1981 State University of New York @ Buffalo Buffalo, NY

Bachelor of Science - Industrial Engineering

Minor - Psychology

Professional American Institute of Industrial Engineers

memberships

References Available upon request