Javier Ixba
**** ***** **** ***** ****, TX *****
Phone: 512-***-****, e-mail: ***********@*******.***
SUMMARY OF QUALIFICATIONS
Management Professional with progressive accomplishments throughout
career, concentrated in the Automotive/Electronic Industry and practicing
Management roles in USA and Mexican environments. Unique diversified
background in Logistics, Materials, Manufacturing, Quality Engineering, &
New Products Development. Team player, with demonstrated ability to lead
people to achieve continuous improvement, high integrity and self-starter
with common sense approach to problem solving.
CAREER ACCOMPLISHMENTS
. As a 3PL; managed the consolidation of Panasonic's raw material and
finished goods warehouse operations to a central location that serves all
North American Operations. Closed 5 warehouses and saved $3.7
million/year.
. Servicing Panasonic's largest warehouse operation; focused on continuous
improvements initiatives with (warehouse consolidation, Key Metrics
development, Suppliers evaluation process, Work instructions, Time
Studies, FTE calculation, etc.) savings of $1.0 million/year.
. In the Automobile Manufacturing Industry, led the launch of 24 (average)
new product lines per year. Successfully transfer Saturn production lines
from Reynosa Mexico (Q.C.Onics) to Nogales Mexico (Prestolite Wire).
. Improve KPI performance in 18%, 20% and even 60 %, resulting in a
significant annual cost saving.
. Suggested a new electrical holder for the manufacturing boards ("ABC
Holder"), to avoid bent terminals. Implemented idea resulted in $ 1.5
million saving
. Won the 1999 "Delphi Excellence Award", a yearly recognition for the best
employee performance, more than 5,000 candidates evaluated.
PROFESSIONAL EXPERIENCE
UTi Integrated Logistics/Panasonic Automotive Systems - Los Indios, TX [
2007 to Present ]
General Manager - Distribution Center
. Manage a total organization of 200 people (5 Direct Reports).
. Responsible for all Finished Goods & Raw Material Warehousing,
Inventory Control, Material Distribution for Arrival
Inspection/Repack, Material distribution for Light Assembly
Operations, Shipping/Receiving more than 40K pallets per month.
. Insure that Customer order requirements are met with no
interruptions. Manage supplier factory deliveries and outbound
expedites to keep customer production lines running.
. Manage the expansion of Panasonic South Texas Operation from 100K
SFT to 315K SFT as a result of Revenue growth from $600 million to
$1.3 billion/year. Manage increased complexity due to sourcing
from Asian suppliers.
. Eliminated in-bound product relabeling @ all warehouse locations -
Savings of $500K/year.
. Control operations at over 300,000 SFT of Warehouse space handling
over 50,000 pallets a month.
. Manage all re-useable tote inventories, including program set-up,
cleaning & storage.
. Supply Manufacturing floor with kitted raw materials from Raw Material
Supermarket operation.
. Responsibility for warehouse material Distribution Budget (6
million/year).
. Responsible for accuracy & control of over $115 million in inventory.
. Oversee the implementation of a Recycling Program - Savings of +
$22K/year.
. Establish standardized key performance indicators (KPI's) for all
Logistics & Warehouse operations.
. Implemented cycle counting system with true WMS logic to replace
monthly physical inventories. Reduced warehouse downtime by 16
days/year and overtime by 7,000 hours/year. Save $1.0
million/year.
Q.C.Onics Company - $20.0 million - Automotive Wire Harness - Harlingen TX
/ Reynosa Mexico
[2003 to 2006]
APQP/ Program Manager
. Led all new business/programs launch form prototypes to mass
production phase. 24 new products per year for several Customers as
Yazaki North America, GM, Saturn, Delphi, Chrysler, etc.
. Had 2 direct reports, and coordinate activities with all related
areas as Quality, Production, Sales, etc.
. Cost Analysis, budget development and expenses control responsibility
for all new products.
. Participate in New Product Design/ Development Process. 3 to 5 new
products per year
. Participate in manufacturing optimization projects. Closed 1
manufacturing plant in USA and expand an existing one in Mexico
under the "Maquiladora" Program. Saving $900K/year.
QC.Onics Company - $12.0 million - Automotive Wire Harness - Harlingen TX
/ Reynosa Mexico
[2002 to 2003]
General Manager
. Direct activities related with the production of wire harnesses,
including raw material receive, wire preparation, molding,
assembly, packaging and shipping finish goods.
. Oversaw an organization of + 200 employee. Had 5 direct reports
(Managers/Supervisors).
. Lead the development and execution of the annual Manufacturing,
Capital & Expense Plans.
. Lead, establish & maintain Lean Manufacturing techniques - Toyota
Production System- .
. Major improvement accomplishments are: Efficiency 18%, In Process
Defects -18%, Absenteeism -20%, Turn Over -60%, Premium Freight
-60% and Total Cost per Hr. -20%
Delphi Packard Electric - Automotive Wire Harness Division - Saltillo
Mexico/Kansas City KS [1988 to 2002]
Production Manager
. Leading a Team of 4 Supervisors and more than 350 General employees.
. Resources Planning, Efficiency, Quality, Cost, Safety and Work
Environment.
. Oversaw new production lines launch and Quality Controls
implementation
. Lead the Delphi Manufacturing System ( Lean Manufacturing
Techniques) implementation for several manufacturing cell and
lines
.
Q.C Planner Manager
. Direct Quality Planning activities for 4 Delphi Plants in Mexico
. Lead TS16949 certification and all Customer Evaluation Processes
. Advance Product Quality Planning and Quality Preventive/Corrective
Action Plans.
. Quality support for different GM assembly plants as Fairfax, Oshawa,
Doraville, and Ramos Arizpe
Customer Support Engineer
. On site Customer assistance for GM Fairfax Assembly Plant in Kansas
City (3 years); Product Design, Application, Quality and Warranty -
Pontiac Grand Prix and Oldsmobile Intrigue -
. Attend/Participate in a daily operations meeting to review /
resolve quality issues related to Delphi products
. Participate in a weekly meeting to review / implement /evaluate
Engineering changes and new products introduction.
. Reduced Customer complains from 15 per month to 5 per year
Materials Manager
. Led Receiving, Distribution, Inventory Control, Shipping and
Customs activities 4 Direct reports and 60 General employees
. Measured trailers delivery performance, reducing the late arrivals
from 35 to 1 in a month
. Successfully started up a new Delphi facility in Saltillo Mexico,
defining & structuring work force, logistics, equipment, space,
training etc.
. Pilot runs and implementation of the "Kit System" to improve
materials management, after this; the "Kit System" was adopted by
12 more different Delphi plants.
EDUCATION AND TRAINING
Instituto Tecnol gico de Nuevo Laredo Mx.
Major: Industrial Engineering Minor: Electrical
Engineer
Instituto Tecnol gico y de Estudios Superiores de Monterrey
80% Credits earned towards Industrial & Systems Engineering M.D.
Major: Quality & Productivity
REFERENCES
Professional references available upon request [pic]