Name: Engr. GIE IAN CABAYLO BOSMION
Nicaan, Libungan, North Cotabato
Address:
Cell #: 091********
E-mail: *************@*****.***
CAREER OBJECTIVE
To acquire a challenging and rewarding position with the potential for growth and advancement that
enhance my skills in the field of Engineering and offers diverse job responsibility so I can utilize my
knowledge and experience to the fullest.
EDUCATIONAL ATTAINMENT
ELIGIBILITY REGISTERED ELECTRICAL ENGINEER
Professional Regulation Commission (Licensed)
October 27, 2010
COLLEGE CEBU INSTITUTE OF TECHNOLOGY
Bachelor of Science in Electrical Engineering
2002 – 2007
Cebu City
SKILL
Knowledgeable in INTERNET
Knowledgeable in MICROSOFT OFFICE
Knowledgeable in AUTOCAD
Motor Control Troubleshooting and Design.
Electrical Installation and Maintenance NCII (TESDA)
WORK EXPERIENCE
OCS QATAR LLC
SHIFT ENGINEER
OCS QATAR (TADMUR GROUP)
Les Roses 1 Compound
Doha, Qatar
July 26, 2012 to June 29, 2014
JOB DESCRIPTION:
● Manage Technicians for 154 Villas and 7 Buildings for maintenance
schedule and distribution of manpower.
● Schedule of Corrective and Preventative Maintenance to all Facilities
Equipment.
● Site Engineer for ongoing projects in terms of accomplishment
performance, materials control and manpower deployment.
● Daily basis Toolbox meeting to all technicians and supervisors.
● Ensure all requirements relating to HSE and Security are met.
● Project accomplishment report through the use of AUTOCAD.
● Review shop drawings and submitted plan for estimate.
● Make regular site visit with contractor and contractor representatives and
client whenever needed.
● Establish and maintain effective working relationships with co-workers,
supervisors, contractors and general public.
● Responsible for ensuring that the Utilities elements of the works are
constructed in accordance with the contract requirements.
● Ensure that all work is carried out in a safe and efficient manner.
● Preparation of Taking over Certificates.
● Monitor and control expenses related to the electrical works
and ensure organizational forecasts and budgets will meet these expenses.
● Coordinate and schedule major system shut down or major repair or
improvement.
ROBINSONS LAND CORPORATION
SHIFT ENGINEER
ROBINSONS PLACE OTIS
Guazon St. Paco, Manila
February 14, 2012 to July 24, 2012
JOB DESCRIPTION:
● Supervise Engineering and maintenance operation
● Maintenance and testing of 3 unit’s Generator.
● Monitor Chiller and Cooling Tower operation.
● Inspect and check electrical wirings and connections.
● Routine check-up and PMS of all electrical equipments
and controls.
● Ensure all Electrical Equipment functional and ready for operation.
● Comply with National Standards on Building, Environment and
Facility requirements.
● Approval and Inspection of constructing tenants with their electrical,
mechanical and plumbing works in reference to their submitted and
approved plan.
● Coordinate and schedule with other departments in the event of major
system shut down or major repair or improvement.
ROOF AND WALL SAVER INC.
PROJECT IN-CHARGE
The Green Building Contactor and Painting
Makati City, Philippines
July 18, 2011 to February 24, 2012
JOB DESCRIPTION:
● Prepare a cost value reconciliation report of the project.
● Preparation of quotation for any additional work, tasked to
evaluate change orders, extra works orders and other
contractual claims.
● Attending meeting, coordinate with the architect, project engineer
and owner regarding the progress and problem encountered on
the site and discuss possible solution or corrective measure to
be undertaken and incorporate it in the revised schedule.
● Prepare monthly and weekly evaluation, accomplishment report
and billing.
● Prepare Quantity estimate.
● Prepare Accomplishment Billing.
● Coordinate with the General contractor for our scope of works.
● In-charge for the acquisition and monitoring for the adequacy of
materials and equipment for construction use.
● File/Safe keeps project documents.
GRAND REGAL HOTEL DAVAO
Shift Engineer
4 Star Hotel
Lanang, Davao City
November 6, 2010 to April 28, 2011
JOB DESCRIPTION:
● Supervise engineering and maintenance operation.
● Ensure that all standards are meet and specifically on HSE.
● Maintenance, synchronization and testing of 2 unit’s Generator.
● Monitor Chiller and Boiler operation and maintenance.
● Respond to guest request and complaints regarding
electrical and mechanical problems.
● Responsible for engineering and maintenance operations of the hotel,
hotel property, restaurant and grounds.
● Assist management in specifying proper supplies and equipment for
operations.
● Maintain the guest rooms, public space, and back of the hotel areas in
good repair by performing various tasks related to a variety of trades
carpentry, plumbing, electrical, air conditioning, painting, wall
covering and tiling to ensure an attractive and well-maintained hotel.
● Install and check electrical wirings and connections, approve electrical
modification and new installations.
● Routine check-up and PMS of all electrical equipments
and controls to ensure all electrical equipments are in good condition.
● Comply with National Standards on Building, Environment and
Facility requirements.
● Ensure that all work is carried out in a safe and efficient manner.
SULPICIO LINES INCORPORATED
Vessel Electrician ( Onboard )
Shipping Lines
Pier 4, Reclamation Area, Cebu City
January 26, 2009 to April 28, 2010
JOB DESCRIPTION:
● Ensure that all MEP and safety equipments are in good condition
on quarterly inspection and testing by government cooperatives.
● Responsible for the proper maintenance and repairs of the electrical
systems on board the ship as directed by the Chief Engineer
● The ship's electrical equipment/ systems maintained by the electricians
include (but are not limited to) machineries inside the engine room,
emergency and auxiliary generators, emergency and auxiliary
switchboards, ship's stabilizers, electrical installations of lifeboats and
rescue boats, fire alarm and fire door control systems, lifeboats, mooring
and anchor winches, CO2 system, ship's public address and public clock
systems, laundry equipments.
● Check-up 3 unit’s Generator before and after operation.
● Check-up and testing of Shaft Generator before and after
operation.
● Synchronize Generator and Shaft Generator.
● Routine check-up, cleaning, replacing and monitoring of all
Electrical equipment controls and panels.
● Maintenance of 6 unit’s Electric Cargo Winch operation
and troubleshooting.
● Assist in docking and departure maneuvering.
● Fire alarm and emergency power supply check and testing.
● Hatch Cover Hydraulic system maintenance, check-up,
troubleshooting, replacing parts and monitoring of oil level.
● Maintenance and check-up of steering room equipment and oil
level before and after operation.
VESSEL ASSIGNED:
M/V SULPICIO EXPRESS SIETE
(March 25, 2009 - April 28, 2010)
General Cargo
M/V SULPICIO CONTAINER II
(January 26, 2009 - February 25, 2009)
General Cargo
TRAININGS AND SEMINARS
ADVANCE COMPUTER ASSEMBLY, REPAIR AND TROUBLESHOOTING
Institute of Integrated Electrical Engineers of the Philippines (IIEE-Qatar)
Doha City, State of Qatar
February 14, 2014
ADVANCE ENGINEERING DRAWING WITH AUTOCAD 2011
Institute of Integrated Electrical Engineers of the Philippines (IIEE-Qatar)
Doha City, State of Qatar
December 06, 2013
POWER SYSTEM ANALYSIS USING ETAP SOFTWARE
Institute of Integrated Electrical Engineers of the Philippines (IIEE-Qatar)
Doha City, State of Qatar
November 01, 2013
BASIC PLC AND INSTRUMENTATION SYSTEM
Institute of Integrated Electrical Engineers of the Philippines (IIEE-Qatar)
Doha City, State of Qatar
March 22, 2013
ELECTRICAL INSTALLATION AND MAINTENANCE NCII
Technical Education Skills Development Authority
Davao City
May 15, 2011
CROWD AND CRISIS MANAGEMENT
Far East Maritime Foundation Inc.
2nd Floor Robin Bldg., Jakosalem St., Cebu City
October 9, 2008 to October 11, 2008
SAFETY OF LIFE AT SEA (SOLAS)
University of Visayas Maritime Training Center
September 22, 2008 to September 28, 2008
RENEWABLE ENERGY
CIT Auditorium/Cebu Institute of Technology
N. Bacalso Ave., Cebu City
February 14, 2007
INSTRUMENTATION AND CONTROL OF ELECTRICAL EQUIPMENT
Electrical Engineering Lab/Cebu Institute of Technology
N. Bacalso Ave., Cebu City
November 2006 to March 2007
ON-THE-JOB TRAINING
Switch Network Operations (NOC)
Innove Communication/Globe Telecom
I.T. Park, Apas, Cebu City
November 2006 to March 2007
ELECTRO-PNEUMATICS and PROGRAMMABLE LOGIC CONTROLLERS
Automation Center/Cebu Institute of Technology
N. Bacalso Ave., Cebu City
November 2005 to March 2006
CHARACTER REFERENCE
Engr. Michael B. Dorado
Technical Service Manager
Guill-Bern Corp.
14 San Francisco St., Pasig City
Philippines
**********@*****.***
027461470
Engr. Celso Diolan
Senior Engineer
Boom Construction co.
Doha, Qatar
***********@*****.***
Engr. Christopher H. Pino
Professional Electrical Engineer ( PEE )
Project Manager-Technical Engineering
Qatar Aluminum
Doha, Qatar
***********.*****@*******.***