[pic]
DEEPAK
UPADHYAY
New Madhe Ganj,
Sitapur Road,
Lucknow 226020
Email ID: - **************.***@*****.***
OBJECTIVE: To strive towards excellence and seek a career oriented position
in a challenging organization that would enable me to put to practice and
further utilize my knowledge, qualification, skills and experience to
extend my full commitment to the organization.
EDUCATION:
SERIAL QUALIFICATION INSTITUTE/COLLEGE YEAR BOARD PERCENTAGE
NO
01 B-TECH COLLEGE OF SCIENCE 2011 U.P.T.U 62.98%
(MECHANICAL) & ENGINEERING,
JHANSI
02 INTERMEDIATE ST. H. P. INTER 2005 U.P 66.67%
COLLEGE, LUCKNOW BOARD
03 HIGH SCHOOL PIONEER INTER 2003 U.P 61.00%
COLLEGE, LUCKNOW BOARD
INDUSTRIAL TRAINING UNDERGONE:
. 4 Week Summer Training at H.A.L Lucknow in Tool Room in year 2008-09.
. 4 Week Summer Training at H.A.L Lucknow in Mechanical Factory in year
2009-10.
WORK EXPERIENCE:
. Currently I am working in Metals Seam Pvt. Ltd, Lucknow. From October
2013 to till now as a Production Engineer. Manufacture of tin
Containers & Steel drums. Company is one of the largest supplier in
north india in terms of production as well as quality. Company is
established in1964 as the pioneer manufacturer of steel drum 5 liter
to 200 liter Capacity truly as per ISO specification. Company has
business with multinational company KANSAI Nerolac Paints, ASIAN
Paints, BERGER Paints, MICRO Ink, SAKATA Inks, FCL etc.
. From dated February 2012 to September 2013. I worked at Pilot
Industries Limited, Rudrapur (Uttrakhand). There I work as a Asst.
Production Engineer. Basically it is a vendor company of Cummins, Tata
Green, Amaron, Base etc Batteries.
. From dated February 2011 to January 2012, I worked at Global Smelters
Pvt Ltd, Unnao (Kanpur). There I work as a Project Leader. Basically
Global Smelters Pvt. Ltd. is a firm to manufacture the structure of
the towers used in the Transmission Line. As a Project Leader I have
to complete all job cards, create the job sheet, maintaining the
balance sheet, and after all I have to report the complete output of
the given project to the Production Manager.
JOB RESPONSIBILITY:-
. Production Planning.-
Making targets of production of finished goods according to
requirements, working shifts, allocation of man power, supervision of
overall operation.
. Management Reports-
Generating MIS reports.
. Team Leader-
Handling different groups of workers for production, quality control.
managing workers for different machines like power press, offset,
shearing etc.
. Training & Development programs-
Proper training & developments programs for workers for getting new
skills and competencies.
. Offset to line production-
from uncoated sheet to finished tin containers. Giving Supervision
reports to managements & giving training to supervisor how to make
it.
. Analysis of performance and monetary wise impact (cost reduction) in
conjunction with production head at the end of the day.
. Arrangement of manpower, material, machine to achieve the targeted
production as per schedule.
. Ensure work instruction is being followed by operators and helpers.
. Minimizing wastage and rejection as per standard set by the company.
. Maintain a report of scrap generated and rework on daily basis.
. Data preparation to analyze overall process loss/gain.
. Ensure PPP & PPM are met as per standard norms set by company.
. Ensure optimum utilization of work area.
. Allocation of manpower within section.
. In case of m/c breakdown fill up breakdown slip and effort should be
made to get it rectified at the earliest.
. Maintain production sheet daily.
. Ensure that the stock movement is made without the respective Challan.
. Ensure proper handover of records and resources to the next shift in
charge.
. Troubleshoot with maintenance department if machine in case of
breakdown.
. To maintain inventory of all grid and lead ingots in the predefined
area.
. Briefly summarize day activity with the production head at the end of
the day and finalize the plan for next day.
. Ensuring that strong and efficient teamwork culture exists within the
production team.
. Directing the production team members and introducing efficient
methods of production line.
PROJECT UNDERTAKEN:
. The topic on the final year project is "Motorized Screw Jack". In this
project we have attached a DC Motor by the help of which we are going
to lift the weight by using Screw Jack. Actually this motor provides
the rotating action to the screw for the purpose of lifting, and this
motor can work out with the use of a 12 Volt battery.
STRENGTHS:
. Highly flexible and adaptable.
. Strong determination, hard worker and result oriented.
. Positive, "Can Do" attitude.
HOBBIES:
. Love Bike Riding.
PERSONAL INFORMATION:
Name : Deepak Upadhyay
Father's Name : S.N. Upadhyay
Sex : Male
State : Uttar Pradesh
Contact No : 084********
Email : **************.***@*****.***
Date of Birth : 07/04/1989
Languages Known : English & Hindi
Nationality : Indian
(Deepak Upadhyay)
Dated: