Jitendra M.Patil
C/o Ashok H patil,
C***, Rainbow Hos .Sco,
Sector 19, Airoli,
Navi Mumbai 400708
Phone: 897-***-**** (M)
Email: **********@*****.***
PROFESSIONAL OBJECTIVE
To be associated with an organization where I could make use of my knowledge and skills in the
development of the organization accompanied by overall improvement in me and organization. Where
career can be well rounded up. It should provide the opportunity for finer blending of all interpersonal
skills with freedom to execute goal.
EDUCATIONAL QUALIFICATIONS
B.E. (Mechanical) from S.S.B.T’s, N.M.U.University, in 2002 with 63.00%
•
H.S.C. from (Nasik Divisional Board / Pune Univ) Jalgaon, With 59.33%
•
S.S.C. from (Nasik Divisional Board / Pune Univ) Jalgaon, With 81.82%
•
ACHIEVEMENTS
Throughout First class at academic
•
Undergone Training From I Oxis Corporation
•
EXPERINCE/COMPETENCIES /SKILL
Total 12 years of experience in operation and maintenance.
•
Experience in Plan Chemical Maintenance and troubleshooting the problems.
•
Experience in Project and Maintenance of machineries.
•
Costing of Project and activity planning of the work according the priority.
•
Having capacity of handing plant individually with zero friction.
•
Worked on ERP, Enterprise Version, 4.7 C & ECC 5, ECC6,
•
MS Excel, MS PowerPoint: Creation of presentations.
•
MS Outlook: Mailbox maintenance
•
MS Visio: Creation of process, oil production and treatment.
•
MS Project: Schedule maintenance and analysis of Oil and chemicals Plant
•
MS Word: Creating and editing documents
•
Programming Languages: C, Operating Systems/Environments: Windows 9.X / NT / 2003/XP,
•
UNIX, MS DOS
1/4
Application Packages: Office, Web Tools: HTML, FrontPage, RDBMS: MS Access, Oracle
•
MS CIT (MS Office 2000 Word, Excel, PowerPoint).
•
JUL’12–NOV’14 EASTERN PETROLEUM PVT LTD.
POSITION: MAINTENANCE IN CHARGE
EASTERN PETROLEUM PVT. LTD. is a manufacturer of Industrial as well as Automotive,
Engine Oils, Greases and Some Engine Oil additives. It is a First Supplier of Liquid paraffin
and Petroleum Jelly in India.
Location : Kamothe, Panvel, Dist : Raigad (New Mumbai)
Responsibilities:
1. Handling maintenance of entire plant.
2. Handling of Preventive, Breakdown and Predictive Maintenance.
3. Conducting regular & annual maintenance of the plant and Following Daily Maintenance
schedule & perform it properly of the following equipment.
4. Economic balancing of the both production & maintenance.
5. Monitoring the safe operating conditions of the plant.
6. Thoroughly conversant with operational & trouble shooting of the process
line & leads the operation team.
7. Coordinating the new project work for the modified process of the product.
8. Coordinated with production engineers on technical issues and engineering matters.
9. Identified and fixed equipment malfunctioning and system faults.
10. Coordinated with vendors and arranged necessary supplies.
11. Improved efficiency of the maintenance department through implementation of new
processes.
12. Planned and executed maintenance tasks effectively and ensured no department's work is
hampered.
13. Inspected facility and ensured every request from various departments is met.
14. Troubleshooting technical problems for equipment and systems.
15. Maintaining log books on all repair and maintenance activities as per ISO 9001.
JUL’09–JAN’12 DOW CORNING I PVT LTD
POSITION: MAINTENANCE ENGINEER
DOW CORNING is an American company having 6 billion dollar turnover all over in world. DOW
CORNING is world larger manufacturer of Silicon base specialty chemical & counted in a fortune 500
companies.
Responsibilities:
1. Compliance of all safety practices like LO/TO, PPE, SAFETY system etc.
2. Handled Pipe line Modification with design Qualification of the Oil plant as well as their
Accessories like valves, Flanges, NRV, Elbows, Tees and some Control valves.
3. Responsible to handle manpower including over time with justified situational need.
4. Responsible to follow SOP (process as well as other) without any deviation or short cuts.
5. Responsible for travel safety (shift transport vehicle, wearing seat belts etc) provided by
company for shift support.
6. Responsible to communicate administrative problems in shift to the concern dept. head.
2
7. Responsible for constant training to new operator’s w.r.t. his operations before putting on
actual job.
8. Responsible for stock monitoring and production declaration in system as per
requirement.
9. Maintain physical stock for all the material as per plan production and giving timely
feedback to Project Manager to arrange for it.
10. Responsible to follow up and completion of maintenance jobs / arranging spares by
communicating with maintenance engineer and guiding shift technician.
11. Responsible to communicate with support department for energy saving like shutting of
chiller if not required in any of the Mfg... Area and suggestions for further improvements.
12. Performance appraisal of operators.
13. Develops project objectives by reviewing project proposals and plans; conferring with
management.
14. Determines project responsibilities by identifying project phases and elements; assigning
personnel to phases and elements; reviewing bids from contractors.
15. Determines project specifications by studying product design, customer requirements,
and performance standards; completing technical studies; preparing cost estimates.
16. Confirms product performance by designing and conducting tests.
17. Determines project schedule by studying project plan and specifications; calculating time
requirements; sequencing project elements.
18. Maintains project schedule by monitoring project progress; coordinating activities;
resolving problems.
19. Controls project plan by reviewing design, specifications, and plan and schedule
changes; recommending actions.
20. Controls project costs by approving expenditures; administering contractor contracts.
21. Prepares project status reports by collecting, analyzing, and summarizing information
and trends; recommending actions.
22. Maintains safe and clean working environment by enforcing procedures, rules, and
regulations.
23. Maintains project data base by writing computer programs; entering and backing up data.
24. Maintains product and company reputation by complying with federal and state
regulations.
25. Contributes to team effort by accomplishing related results as needed.
26. Pipe line fabrication and erection of the Equipments of Silicone oil and mineral oil as per
their Material of Contraction.
APR ’05 JUN’09 PAM EXTRUSION PVT LTD
POSITION: MAINTENANCE/PROJECT ENGINEER.
Coordinate Contractors to ensure execution in accordance with project directives.
•
Provide technical input for the creation of the Basis of Design (BOD).
•
Review and challenge project philosophies, progress reports, technical notes and other
•
documentation.
Coordinate and/or attend project reviews as required (Cost, Schedule, Peer, HAZOP,
•
Risk, Readiness, etc).
Equipments handled: 1. MS REACTOR WITH AGITATOR, HEAT EXCHANGERS,
•
COOLING TOWERS, CHILLERS, CENTRIFUGAL PUMPS, GEAR PUMPS, FILTER
PRESS, NUTCH FILTER, SETTLER TANK, STEAM BOILER, THERMOPACS,
COMPRESSORS AND TANKS,
3/4
Maintaining aesthetically nice looks of the all fabricated pipe lines with their standards
•
Valves classifications, flange calcification and some special category material Handled.
•
Steward the project risk register and any other review action registers to ensure the close-
•
out of project actions.
Assist with the coordination of team members and plant for all technical and readiness
•
reviews.
Manage and continuously improve the Engineering Contractor performance on design
•
work to assure it meets the Company’s technical, financial, safety and environmental
objectives.
Provide quality assurance of project related deliverables.
•
Coordinate the discipline engineers in preparing engineering material for functional
•
reviews.
Attend quality monitoring events, including vendor reviews.
•
Manage the technical interface with the upstream partner and downstream plant
•
engineering.
Develop good understanding of THE COMPANY Standards and Guidelines to guide
•
Contractors technically during the project.
Coordinate and act as interface between project and dispensation requests.
•
AUG ‘03 TO APR ’05 KIRAN PIPES INDUSTRIES PLANT EXECUTIVE
A Kiran pipes industry is a manufacturer of plastics products like pipes, pipes couplings, Elbow & other
plastics components
Role Purchase Egg. Handling the responsibility of Plant, maintenance, Purchasing function, Supplier
development.
• Manage the technical interface with the upstream partner and downstream plant
engineering.
• Valves classifications, flange calcification and some special category material Handled.
• Contribution Procurement of various raw materials, Spares and consumables according to
the production schedules.
Development of vendors for new materials.
•
Sending the enquiries for required material, maintaining of quotations, order dispatch
•
planning and pending order follow-up.
Negotiating and finalizing contracts with vendors and contractors for materials & services.
•
Vendor evaluation, Vendor payment clearance, Vendor Development.
•
Interaction with Q.C, Production to solve quality problems.
•
Comparison & cost analysis and monitoring the stores activity.
•
4
AUG 02 TO JUL'03 MANE INDUSTRIES PRODUCTION SUPERVISOR
Main industries are a manufacturer of industrial products like casting components, Dies & fixtures.
Contribution:
To allocate manpower on department so that every should work efficiently & maximum
•
output can be achieved from them.
To maintain discipline in the department.
•
To analyze malfunctioning of machines & to prepare appropriate maintenance plan.
•
To manage all shop floor like Production, Maintenance, Quality and manpower
•
management etc.
To achieve the Production target by effective utilization of manpower was the key area.
•
To ensure all process parameters are maintained & are under control.
•
Coordinate daily activity in all departments.
•
Ensure proper documentation like Weekly Activity Reports (WAR) for invoicing purposes.
•
PERSONAL INFORMATION
Date of Birth : 8th May 1980.
Passport : Available
All the above-mentioned information is true to the best of my knowledge.
Date: Signature:
Place:
5/4