Scott Brown
******@*****.***
Cell 248-***-****
Objective:
To obtain a Project Manager/ Superintendent/Sales position with a growing
company where my years of business, project management, hand's on
construction and people skills may be utilized and where hard work is
recognized and encouraged.
Employment History:
Project Superintendent- JJO Construction-Mentor, Ohio
9/2012- Current
Dollar General - Marion,OH Current
Dollar Gereral - Uniontown, OH. Ground up
Dollar Generals - Lewisburg and French Creek, WV
Both were ground up jobs, the buildings were PEMB and 9100 sq. ft.
site work packages.
Bullseye Center Elizabethtown, Ky.
This was a 5 unit strip mall. The scope of work included
demolition of an existing gas station, a small
3 unit building and a house and garage. A complete site package
with cuts and fills to balance and
achieve the new elevations. The building structural steel and the
exterior was a combination of EIFS
and Masonry. Tenants finish's performed were the landlord work
for a Mattress Firm and a Qdoba.
Landlord and tenant for a Fire House Sub.
Dollar Generals -Spencerville, Ohio-Gratiot, Ohio and Princeton,
WV
All were ground up builds, with a complete site work package. The
buildings were PEMB
And 9100 Sq. ft. each
Project Superintendent - C E Gleeson Constructors - Royal Oak,
Michigan 6/2007-11/2011
Walgreens Manassas, VA Feb
2011 - Nov 2011
This project consists of clean and grubbing of the site, all site
utilities and grading, establishing a new lane along the main road
Dumfries for the entrance, construction of a 14,600 sq. ft. block and
brick building. Coordination of all activities with Walgreens, City and
Developer.
LA Fitness Broadville, IL
April 2010 - Sept 2010
Project was a 50,000sq ft build out, the shell was existing so there
was a lot of interior demo, including removing concrete and excavation
for the pool and spa, Steel beams and columns that needed to be
relocated, Project scope included a basketball court, a stepped
platform spinning room, Aerobic room, "Kids Klub" and Juice Bar.
LA Fitness Royal Oak, MI Aug 2009 - April 2010
This project was a 40,000 sq. ft building with a ground floor parking
structure. The structure was a "Pre-Cast panel" design. The project
stated in Aug 2009 and was completed on schedule in April of 2010.
Project scope included a lap pool, spa, basketball court, aerobics, and
spinning rooms, locker rooms with saunas. Weather was a big factor in
the completion of the job. Weight restrictions and coring of the Pre-
Cast floor panels so as to not lower the structural and stress factor
of the floor panels was a challenge.
In between jobs in the field, I have been in the office as part of the
estimating team, and management team for contracts.
Walgreens Portland, IN Oct 2008 - March 2009
Scope of work for this job was to finish up the building since I took
it over from another superintendent and had to bring it back on
schedule. Building was finished on schedule.
Walgreens Fort Wayne, IN June 2008 - Oct 2008
Scope of work included demolition of 4 existing homes and buildings,
install approximately 5 ft. of engineered fill to site, footings to a
finished building. The schedule was 5 months.
Douglas J Aveda School of Cosmetology Royal Oak, MI June 2007 -
Oct 2007
Work scope included major demolition of an existing two story building
with a new 2 story attached addition, for a total of 34,300 sq. ft. The
existing building required a new fa ade, Scope for the inside area's of
the school were all new HVAC, electrical, and plumbing, elevator,
partitions, drywall and all finishes. Contract
amount $3,156,686.00
Project Superintendent - Willson Builders, Inc. - Toledo, OH
1/2007 - 4/2007
Kohl's Westland, MI
Work scope included remodel of over 90,000 sq. ft. building. The job
was done on schedule which was a 14 week duration.
The work was completed with a day shift for the exterior and some
interior and a night shift for all of the interior work. I was the
superintendent on the Interior work at night. The interior finished
with time spare. The reason for the short duration with this company is
that I was only contracted for this particular job.
Project Superintendent - DeMaria Building Company - Detroit/Novi,
MI 1/2001 - 4/2006
During the five years with DeMaria as a site superintendent I have been
in charge of several job sites. The range of diverse work included a
Mail Sort Facility at the new airport, Reconstruction and painting of a
million gallon water storage building, updating fire alarms and HVAC
systems in different buildings for the Detroit Water and Sewer Dept.
Building 51 units of town houses and 25 building of a combination of
triplex and duplex units. Upgrades at a fresh water plant for the City
of Detroit Water Dept. Responsibilities were scheduling, budgets,
running subcontractor meetings, attending owner meetings, safety
enforcement. DeMaria provided many opportunities for training, the
latest was completing the 30 OSHA training class. This was only one of
several training session that I have completed.
Project Superintendent - Etkin Skanska - Southfield, MI
05/1999 - 10/2000
Renovation and additions to the Clawson High School. Scope of the work
included a new gym and renovated locker room area, additions to the
Administrative office and the Media Center, complete renovation of
classrooms, updating science rooms, renovating the old gym into a new
auditorium. The part of the bond issue was approximately 15 Million.
Several phases had to be managed at one time with up to 75 workers on
site.
Project Superintendent - The Christman Company - Lansing, MI
06/1997 - 05/1999
Haslett High School Haslett, MI
Work scope included new class rooms, Media Center, gym, weight room, and
student commons additions, with renovations to the Administrative office
and science rooms. Part of this bond issue was also a class room
addition to the Middle School, which I was also in charge of. The Bond
issue was 14 million.
Ingham Medical Center Emergency Department expansion and renovation.
President - S. B. Builders - Port Huron, MI
1987 - 1997
Residential and Commercial Projects, including a 202 unit apartment
complex as a general contractor completed in 14 months. Design and
construction of several custom homes, and other commercial projects,
construction management training, and supervision
Education:
Bachelor of Science, Construction Management Expected Graduation: May 2015
Macomb Community College / Wayne State, Detroit, MI
Experience equal to degree.
Skills and Abilities:
Includes project management, estimating and qualifying of bids and
Contracts; design build, general contracting, office manager, subcontractor
coordination and control, and carpentry
Notes and Other Information:
My career has benefited from a variety of experience's including working
with Clients, Architects, Owners, Sub-Contractors, Unions, City Officials,
contracts and cost estimating
REFERENCES
Raley-Miller (Developers)
Larry Raley
10815 Sikes Place, Ste. 300
Charlotte, NC 28277
*****@***********.***
Robert Johnson Architects
Robbie Johnson
1808 West Morelead
Charlotte, NC 28208
*****@************.***
Gary Collins
Director of Development-LA Fitness
*****@********.***
DeMaria Building Company
Frank Kersanty-General Superintendent
C- 248-***-****
******@************.***