MARIE MARAVILLA
** ****** *** ******** ******* VIC. 3023
E-mail: *****.*********@*****.***
Tel. Home no.: +613-********
MOBILE NO.: +614********
Key Qualification:
I have gained extensive experience mainly in Building services (MEPF) and civil drafting including major highway and
rail projects, I have undertaken drafting for major roads on freeways, interchanges and drafting building design
services.
I am highly skilled in CADD packages such as MicrostationV8i, AutoCAD 2013 and Projectwise.
Professional Experience:
• Parsons Brinckerhoff
28 Freshwater Place
Southbank, Vic 3006
CIVIL DRAFTER
October 7, 2013 – November 11, 2014
Project Undertaken:
Doha Qatar Expressway
This project will form part of the major highways infrastructure in Qatar. It consists of the detailed design of
approximately 26 kilometers (16 miles) of divided highway with grade-separated interchanges and bridges. The project
is located within the urban environment of Doha.
• A 20-km long East West Corridor, aimed at reducing pressure on routes to the new airport;
• A bypass for Wakrah, and a redesign of the road that passes through the town;
• Upgrading E-ring road into four lanes;
• Installing an Al Khor bypass;
• Building two multi-level intersections on Mesaimeer road;
• Designing a new outer ring road covering the Eastern Industrial Area, and Al Furousiya Street;
• Widening Al Saad street
• SMEC Australia
71 Queens Road
Melbourne
Vic 3004
CIVIL DRAFTER
April 8, 2013 – June 14, 2013
Project Undertaken:
Princess Highway Duplication
The upgrade will give Winchelsea a new bridge with a pedestrian path constructed north of the two existing bridges,
and the bluestone bridge to the south – built in the 1860s – will be maintained to provide pedestrian and cyclist access
across the river
1
Austin Street to Deans Marsh Road, Winchelsea
The duplication will continue to include a new bridge crossing of the Barwon River and traffic lights at both Hesse
Street and Deans Marsh Road intersections.
• AF Engineering
174 Tuner St
Port Melbourne Vic 3207
RAIL DRAFTER
December 3, 2012 – April 3,2013
Project Undertaken:
Regional Rail Link Package A – Southern Cross
• Two new platforms (15 and 16) at Southern Cross Station
• New bridge deck over Dudley in West Melbourne
• Laying of new track along 0.8 kilometres
• New signalling system for the new regional tracks and modifications to the signalling system for the
metropolitan rail tracks
• Hyder Consulting
Level 16, 31 Queens St.
Melbourne Vic 3000
CIVIL DRAFTER
September 21, 2009 – November 16, 2012
Project Undertaken:
Sothern Expressway (Adelaide) – Storm Drainage
The $407.5 million duplication of the Southern Expressway is a key part of the development of Adelaide's north-south
corridor and, when complete, will deliver an 18.5 kilometre multi-lane, two-way expressway between Bedford Park
and Old Noarlunga by mid-2014.
Landscaping elements being developed for the duplicated expressway include:
• revegetation and amenity plantings
• shared use pathways
• stormwater basins
• noise walls
• landart
Regional Rail Link (RRL) Package E, Deer Park to West Werribee Junction Vic, Australia
Baulderstone and Leighton Joint Venture (BLJV) (D&C Contract)
The Regional Rail Link is a major new rail line that will separate regional trains from metropolitan trains, increasing
capacity and reliability, between Melbourne (Southern Cross Station) and West Werribee. A Hyder and Aurecon joint
venture will design Package E under a design and construct contract for BLJV. BLJV’s client is Transport Victoria.
Package E includes 25 kilometres of new rail tracks, road upgrades and grade separations at road intersections, new rail
bridges across Werribee River, Lollypop Creek, Davis Creek and Skeleton Creek, a railway cutting between Ballan
Road and Lollypop Creek and two new stations at Tarneit and Wyndham Vale.
2
M80 Ring Road Upgrade,Tulla Sydney Alliance
The Tulla Sydney Alliance, a partnership between VicRoads, Thiess, Parsons Brinkerhoff and Hyder, was awarded the
first contract of works for the Victorian and Australian Government’s $2.25 billion upgrade of the M80 Ring Road.
The M80 Ring Road Upgrade extends 38 kilometres, from the Princes Freeway at Laverton North to the
Greensborough Highway at Greensborough. The project will improve safety, ease congestion, reduce travel times and
improve reliability for all road users.
The upgrade is being carried out in stages, with the most congested sections and those with the worst safety record
being upgraded first. Tulla Sydney Alliance is delivering 9.7 kilometres of the upgrade between Calder Freeway and
Sydney Road.
The Tulla Sydney Alliance works will include:
- Widening to three lanes in each direction with a fifth and sixth lane between some interchanges
- Intelligent transport systems such as ramp metering and variable message signs to manage traffic flow
- Reconfigured freeway interchanges and entry and exit ramps
- Landscape planting and urban design features
• KBR (Kellogg Brown & Root)
Level 3, 441 St. Kilda Road
Melbourne Vic 3004
RAIL DRAFTER
June 15, 2009 – September 18, 2009
Westall Rail Upgrade, (Microstation V8i) –
• General drafting of railway plans, sections and station yard layout.
• Drafting signalling and overhead wiring
• Responsible for utilising Microstation to complete track design and rail alignment works.
Project Undertaken:
The Westall Rail Upgrade project involves works within the Dandenong rail corridor to improve service
reliability and overcrowding on this busy line.
Specifically the project involves:
• Construction of a third track between Centre Road and Springvale Road;
• A significant upgrade to Westall Station including a third platform, 80 extra car spaces and
improvements to passenger facilities, safety and accessibility;
• Pedestrian level crossing upgrades at three location between Centre Road and Springvale Road
• Additional overnight storage space for five trains at the Westall stabling depot
3
• WorleyParsons Services Pty Ltd
Level 4, 333 Collins St.
Melbourne 3000
CIVIL/STRUCTURAL DESIGNER/DRAFTER
February 11, 2008 – 29 May 2009
Emirates Aluminium (EMAL) Smelter Project, (Microstation V8 / PDS FrameWorks Plus) –
• Drafting of piles, concrete and steelwork, for Casthouse and Carbon Areas. Including;
1.Anode Store, Pile, Footing & Slab Layout & Detail Drawings.
2.Rodded Anode Store, Pile, Footing & Slab Layout & Detail Drawings.
3.Casthouse, Steelwork Model & Drawings.
4.Checking of various concrete drawings.
• Design and Draft of Architectural Plans, Section, Elevations and Details of Carbon Areas
and Casthouse.
Ma’aden Phosphate Project, Chemical Complex, (Microstation V8) –
• 2D drafting of site Roads, Drainage and Underground Services including;
1. Stormwater Layout, Sections and Details.
2. Potable Water Layout, Sections and Details.
3. Pressurised Sewer Layout, Sections and Details.
• Responsible in production of CADD drawings to the requirement of
the Engineers and designer.
• Involved in the preparation of design drawings of roadways.
• Produces road layout plan, roadways, cross sections, drainage plan
and utility plans such as water distribution system, street lighting layout, sewer
layout, signage layout and structures provided by the designer and engineers
• Parsons Brinckerhoff
Level 7, 457 St. Kilda Road
Melbourne
CIVIL DRAFTER
July 2004 – February 2008
• General drafting using Microstation and AutoCAD
• Develop and check plan and details in order to be consistent and in compliance with office standards and
engineering direction given.
• Ensure the format of the CAD drawings is set up to cater for individual projects specific requirement
• Produced construction plans and detailed drawings produce by the engineer/ designer.
• Provide accurate and timely drafting input to all projects as required.
• Remained skilled and up to date in the use of AutoCAD and Microstation.
• Strive to achieve maximum productivity including billable hours.
4
Project Undertaken:
Melrose Drive Upgrade
In October 2006 the Victorian State government announced an $8 million upgrade to ease congestion and
improve safety at the intersections of Melrose Drive / Mascoma Street / Westfield Drive and Dromana Avenue /
Matthew Avenue. The Project is being delivered by the Tullamarine Calder Interchange, an Alliance between
Vicroads, BaulderstoneHornibrook and Parsons Brinckerhoff.
Dynon Port Rail-Link
Track civil & signal detailed design and documentation for major rail lik into Port of Melbourne from Dynon
Freight Terminal. Works also includes existing assets condition assessment, stakeholder interaction and
structural risk management.
Dandenong Creek Wetland
Detailed design of artificial wetlands along dandenong creek between dandenong southern bypass and the
future Eastlink bridge crossing. Design follows on from work undertaken by PB related to the widening of
dandenong creek of Eastlink project.
Tullamarine Calder Interchange Project
Works commenced on a major upgrading where the Tullamarine and Calder Freeways merged adjacent to
Essendon Airport 10 km north of Melbourne. The project is being planned, designed and constructed under an
alliance agreement between Vicroads, BaulderstoneHornibrook and Parsons Brinkerhoff.
Environmental Upgrades to Terminal Station
Design and contract documentation of storm water interception, containment treatment and discharge system
across 13 terminal station thought Victoria.
Mitcham Frankston Freeway
Tender Bid for Connect East Construct – Drafting of 21 km of dual 2 to 4 lane median separated main
carriageway. A feature of the PB design was an 80km/h freeway to freeway interchange connecting the MFF to
an upgrade of the Monash Freeway and also a double grade separation for the Princes Highway Interchange
and Heatherton Road.
Other Projects Undertaken:
- Ballarat Railway
- Environmental Upgrade Works Stage 2 (SPI Powernet)
- Power Distribution Sites
- Mobile Oil Australia Pty Ltd
- Caltex Australia
- Norvac Distribution Sites
- Brunswick Terminal Station
- Sydenham Emergency Pump Station
- DB Industrial Laverton North (Stage 1 and 2)
- RiverValley Estate Sewerage Pump Station
- Yallourn Switchyard Review
- Cranbourne – Frankston Road Services Relocation Strategy
- Hallam Road Services Relocation Strategy
- ApolloBay Remediation
- Taylors Road Functional Design and Planning Scheme Amendment
- Beveridge Pipeline Phase 2
- FKP Industrial Development Campbell field
5
• WSP Asia
Manila Philippines
DRAFTER (MEFP) – BUILDINGS SERVICES
Nov 1999 – May 2004
Railway projects:
CAD Production:
• Responsible in production of CADD drawings to the requirement of the Engineers.
• Directly involve in doing Mechanical, Electrical, Plumbing & Drainage, Fire Protection and Piping
arrangement.
• Ensure the format of the CADD drawings is set up to cater for individual projects specific requirements.
• Directly involve in doing detail drawings to give additional information on specific parts generally at larger
scale than the general arrangement.
• Layout MEFP plans and MEFP details for a project with limited guidance from the Engineer/Designer.
• Produce drawings such as CSD (Combined Services Drawing), SEM (Structural Electrical Mechanical)
and ISD (Individual Services Drawing)
• Manage and maintain the record of all incoming and outgoing drawings from the office in accordance with
WSP Asia Quality Assurance Procedure.
• Using Microstation V8 in doing SDC300 projects
Project Undertaken:
Circle Line 1 (Conventional Centre Station, Millenia Station, Museum Station, DhobyGhautStation)
Singapore
Responsibilities include:
• Producing Combined Services Drawings (CSD)
• Producing Sections and Elevation drawings
• Producing and establishing structural opening for mechanical services, electrical services, plumbing and
drainage and fire services with guidance from engineer/ designer
KCRC (Nam Sheung Road Station, Nam Cheong Station and Luk Ma Chau Terminus Station)
Hongkong
Responsibilities include:
• Layout MEFP plans and details
• Producing Combined Services Drawings (CSD)
• Produces sections and elevation services.
Other Railway project
SDC300 Kai Tak Station -Hongkong
SDC300 Ho Man Tin Station-Hongkong
SDC300 Ma Tau Wai – Hongkong
SDC300 ToKwa Wan Wa
Other Projects:
English Schools Foundation-Hong Kong ABS CBN ‘ELJBuilding (Philippines)
Integer Pavillion Ltd. (Hong Kong) Manansala Tower-Rockwell Land Corporation (Phil.)
University Hong Kong KennedyTown (Hong Kong)
Lady Ho Tung Hall -Hongkong Royal Bank (UK)
Hong Kong Excelsior 11 Chater Road-M&E Drawing-Hong Kong
Sheraton Hong Kong and Tower-Hongkong AIG Tower Hongkong
Doha Bank Hq. At WestBay – Qatar, Dubai
6
Souk Al Nakheel– Dubai
• As Cad Draftsman undertook a number of projects with the following responsibilities:
• Produce scaled drawings using AutoCAD Software
• Projects received and send through e-mails.
• Doing Building design and architectural details like PC post tension, EPS (Expanded Polystryrole
Method) Retaining Walls and Drainage System.
• Coordinate CAD works with the client.
• Designing some company’s product basically furniture.
• Illustrate standard designs and details, which ensure uniformity and correctness.
• Coordinate works with the designing engineers.
• Interpret sketches in a scaled and detailed design such as residential and commercial establishment.
• Created aesthetic design using airbrush, watercolor and color pencil.
• Architectural manual drafting of plans, sections and perspective
• Drafting and designing 2 storey residential houses and commercial establishments.
Education / Trainings:
• BS in Architecture
• AutoCAD
• Microstation V8i
• AutoCAD 2013
• Autoturn
• Projectwise
PERSONAL BACKGROUND:
Birth date : September 11, 1974
Civil Status : Married
SEX : FEMALE
Language spoken : English
7