CURRICULUM VITAE
Mohammad Haroon Saddiqui
Flat No. A-9 third Floor Good Earth Centre
Block-4 Gulistan-e-jouhar
Karachi - Pakistan.
Cell No. : (+92) 0300 - 2931532
E - Mail:acgs8f@r.postjobfree.com
Career Focus
To work with an organization offering challenging work opportunities in a
Competitive work environment, relevant to my education with maximum
efficiency and to obtain challenging position
Computer Literacy
. SAP (Systematic Applicable Program); Training completed
successfully under the Supervision of Siemens Experts in QM
(Quality Management) Module.
. Extended knowledge and working experience in Microsoft Office
(Excel, Word and Power Point) and Internet.
Professional Training
. Successful Completion of Two year's internship in pattern making
trade from metallurgical training centre of Pakistan
Steel Mills.
. Skills of Supervision from Pakistan institute of management
Experience
Bolan Castings Limited
Department : Development Department as a Pattern Maker
Sub Ordinate : Team In charge of Development Department
Duration : From March 2006 up till date
Knowledge : During this period I learned different knowledge about my
Responsibilities.
Responsibilities:
. Design & Manufacture Various Wooden, Metallic & Araldite
Patterns
. To Execute Preventive Checks & repair work on Patterns and
Too ling's
. To Study & Execute Methodology of repair and Modification.
. To supervise manufacturing of Jigs, Fixture & Supports.
. To Assist in application of Tooling & Fixtures during
trials
. To preparing patterns layouts. Reading & interpretation
pattern drawings.
. Pattern mounting. Repairing pattern when required by
batching.
. Pattern finishing (metal or wood).
. Measuring dimensions using instrument. Pattern
inspection.
. Cleaning & house keeping the work area
. Establishment of work shop for jig repairing and
maintenance.
. Pre-qualification of contractor in various categories
for different works.
. Development of spare parts store and its system for
inventory control.
. To maintain all Patterns and core boxes in good running
condition.
Experience
DEWAN MOTOR CYCLE LTD
Producing Chinese Technology LIFAN Motorcycle (Star Bikes)
Department : Quality Assurance as a Assistant Manager
Sub Ordinate : Team Incharge of Quality Department
Duration : From July 2004 to March 2006
Knowledge : During this period I learned different knowledge about my
Responsibilities :
. Local Parts Receiving Inspection and Feed Back to Vendors
. OFF Tool Simple (OTS) Process and Advice to Vendors for
Improvement Quality.
. Painted Parts Inspection (Film Thickness, Gloss Thickness,
and Orange Peel Audit etc.)
. Assembly Inspection (Surface Conditioning, Electrical
Function and Assembly Parts Fitment etc.)
. Engine Inspection (Engine Performance, Torque Checking
etc.)
. Vehicle Performance Inspection (Drum Test, Brake Test,
Engine Analyzing, Rattle Test, Drive Ability Test and
Safety Conditions).
. Repair Conformation and Pre Delivery Inspection.
. Customer Delling (After Sales Services and Warranty Claims
Analysis)
. Audit of Production and Inspection Equipments.
. Support to Production Department for Improving Process and
Time Study.
. Monitoring Board Updating and Presentation in Daily Morning
Meeting
. Preparation of Daily and Weekly Feed Back Report.
First Six (6) Months I was worked in Product Development Department (PD)
Responsibilities :
. Vendors Evaluation and Negotiation for Localization.
. Development of Local Parts.
. Vendors Follow Up of Supply for Lean Production.
. Monthly Scheduling of Local Parts Supply
Experience
Bolan Castings Limited
Department : Development Department as a Supervisor
Sub Ordinate : Team Members of Development Department
Duration : From FEB 1998 TO MARCH 2002
Knowledge : During this period I learned different knowledge about my
Responsibilities.
Responsibilities:
. To preparing patterns layouts. Reading & interpretation
pattern drawings.
. Pattern mounting. Repairing pattern when required by
batching.
. Pattern finishing (metal or wood).
. Measuring dimensions using instrument. Pattern
inspection.
. Cleaning & house keeping the work area
. Establishment of work shop for jig repairing and
maintenance.
. Pre-qualification of contractor in various categories
for different works.
. Development of spare parts store and its system for
inventory control.
. To maintain all Patterns and core boxes in good running
condition.
Personal
Father's Name : Qazi Mohammad Mateen Saddiqui
Date of Birth : 13-03-1975
N.I.C. No. : 42101-8734181-1
Marital Status : Married
[pic][pic][pic]