Respected sir,

I herewith send you my Resume for the post of LEAD CIVIL/STRUCTURAL

ENGINEER, having 21 years of experience in oil and gas and hydrocarbon

related processing plants. If you find suitable, please revert back to me,

I will get GREENCARD OF USA soon, I can work for any employer without

sponsorship

I will available in USA in after 7th DECEMEBR 2014

Thanks & Regards,

Mona

Name: MONA KAMAL SHAH

Position: LEAD CIVIL/STRUCTURAL ENGINEER

Nationality: INDIAN

Date of the Birth: 21st

May,1972

Qualificatio 1) B.E (Civil) from MS University (Vadodara), 1993

ns: Software:

STAAD-PRO, SACS, AutoCAD & Micro Station, Microsoft office

(Proficiency in excel, word, power point).

3DModelling Package:

Frame Works Plus, Smart Plat Review, Navis Works

Authorized to work : QATAR, USA (GREENCARD)

Summary Of Civil & structural engineer with more than 21 years of

Experience: professional experience and expertise in a number of

industries with strong fundamentals in carrying out Computer

aided analysis, design & detailing of structural steel /

concrete structures in refineries and petrochemical

industries with focus on relevant IS codes, American &

British Design codes is seeking relevant assignments in Oil

and Gas industries and allied units.

Professional expertise in Project Proposal Engineering:

Carrying out preliminary Engineering, Feasibility Studies,

Preparation of Bill of Quantities and Cost Estimates, Basic

Studies and Drawings, Man-hour estimates and preparation of

final offer documents

Preparation and Review of design criteria for civil,

structural & building works and review of standard drawings.

Control & review of 3D modeling, Man-hour & schedule

planning & control, resource planning. Perform & review

detail design engineering work & drawing of main pipe rack

supporting with Air fin cooler. Expertise in review of soil

investigation data & also review of pile design & ground

improvement of soil.

Inter-disciplinary coordination activities, coordination

with the site activities and regular meetings with vendors /

clients. Checking of Vendor Design / Drawings including

Shop Fabrication drawings. Coordination with consultant for

the design approval.

Provide technical expertise related to the project . Ensure

design and engineering compliance with relevant codes,

standards, Project Specifications and Company standards.,

including resolution of technical issues.

Coordinate Monitor and engineering issues with EPC

CONTRACTORS as per project requirements and complete the

same within the time frame in all phases of the project.

Training and coordination with junior designers & engineers.

Preparation & control of MTO for civil/structural

procurement

Excellent project coordination and execution skills

PROFESSIONAL EXPERIENCE:

Sep-2012 to-date PENSPEN INTERNATIONAL LIMITED, QATAR

Lead Civil/Structural Engineer

Projects & Responsibilities

. GC 11106200 EPIC OF 16" JET A1 FUEL PIPELINE FROM QP

REFINERY TO BSV-3, QATAR PETROLEUM, QATAR

. G013-008-01300 EPC OF O2/N2 PIPELINE BACKBONE IN RAS

LAFFAN, GASAL, QATAR

. PCC05/11/C001 AL UEID AIR BASE- EPC OF NATURAL GAS SUPPLY

TO THE IPP PLOT PLAN GTF & IPP, QIP POWER TECH., QATAR

. GC12113600 EPIC FOR FEED STREAM INTEGRATION AND

INSTALLATION OF FISCAL METERING SYSTEMS, MESAIEED

. GC12107100 EPIC FOR INSTALLATION OF 20" WET GAS PIPELINE

BETWEEN KM & KS,QATAR

. GC13107800 EPIC FOR GAS SUPPLY TO RAS ABU FONTAS (RAF)

POWER STATIONS,QATAR

- Provide technical expertise related to the project .

Ensure design and engineering compliance with relevant

codes, standards, Project Specifications and Company

standards.

- Checking of Design Documents & Approval of Drawings

- Preparation of Design Basis Report & Technical

Specification

- Participating in Design Review and Progress Review

meeting with Client

- Preparation of Deliverable list & Schedule, Man-hour

estimate,Resource requirement and Progress report

- Providing Input to Project Planning Engineer to prepare

project schedule

- Coordination with various other departments for Civil

Input Data and participating management meetings

- Co-ordination with engineering clients / contractors

- Progress monitoring & reviewing of Design & Drawing

- Provide Technical support during procurement activities

as per the contractual requirement including resolution

of technical issues. Coordinate, Monitor and engineering

issues with EPC CONTRACTORS as per project requirements

and complete the same within the time frame in all phases

of the project.

2011 - 2012 RAMBOLL OIL&GAS, DOHA, QATAR

Lead Civil/Structural Engineer

Projects & Responsibilities

- Checking of Design Documents & Approval of Drawings

- Preparation of Design Basis Report & Technical

Specification

- Participating in Design Review and Progress Review

meeting with Client

- Preparation of Deliverable list & Schedule, Man-hour

estimate,Resource requirement and Progress report

- Providing Input to Project Planning Engineer to prepare

project schedule

- Coordination with various other departments for Civil

Input Data and participating management meetings

- Co-ordination with engineering clients / contractors

- Progress monitoring & reviewing of Design & Drawing

- Standardization of Design Procedures

- Preparation of Check list and Design Guidelines

Training: Project Management Professional (PMP) training from MMIT

institute. DOHA, QATAR

2011-2012,

Project: J tube installation study on Jacket on Maersk oil Al shaeen

platform, Qatar

(power required for QP PLATFORM-STP-M3 AND FMB PLATFORM)

Key Responsibilities:

. Worked as a project/structural lead for that particular project

. Worked out different options for installation of J tubes on two

platforms due to power requirement for QP platform.

Project: Feasibility study of hydrate inhibitor system and power supply

system, QPD - Qatar petroleum development

Key Responsibilities:

. Worked as a structural lead for that particular project

. Interaction with all multidiscipline for proper co-ordination.

. Perform/review of deck extension required for Topside modules to

mitigate the project requirement through SACS model

. Checking jacket capacity of additional load applied for Methanol

tankland solar panel power system

. Review of structural deliverables for additional supports provided on

existing platforms

Project: PMP Off shore Phase-2 Tie in off two wells, at Qatar Gas

Operation company, QGX- Qatar

Key Responsibilities:

. Worked as a structural lead for that particular project

. Interaction with all multidiscipline for proper co-ordination.

. Review of structural deliverables for additional pipe supports

provided on existing platforms

Project: EPIC Replacement of Air instrument compressor at QP PS-2 and PS-3

platform, Offshore platform at Qatar petroleum, Qatar

Key Responsibilities:

. Worked as a structural lead for that particular project & Overall co-

ordination as a project manager with client

. Interaction with subcontractors and vendor (Atlas Copco, UK)

. Review of structural deliverables for skid lifting Analysis

Project: Concept study and cost Estimation Report for new Gas Injection

compressor/Gas Turbine Generator at QATAR PETROLEUM DEVELOPMENT- QPD, Qatar

Key Responsibilities:

. Prepared structural input to conceptual study report and Cost

Estimation report to installed new GIC/GCG equipment at new ITP

platform.

. Review/ preliminary Analysis of in-plane analysis in SACS software to

validate the strength to carry out the future load for new bridge

Project: Feasibility study of Hydrant inhibitor system and power supply

system,at AS10 platform, QPD Qatar

Key Responsibilities:

. Prepared structural adequacy check as input to feasibility study

report for final selected power system and hydrant inhibitor system at

AS10 platform.

. Review/ preliminary Analysis of In-plane analysis in SACS software for

AS10 Deck platform

. Input to cost Estimate related to structural

Project: Vibration and Flexibility Analysis of piping Unit-15 at QATAR

PETROLEUM, Meaissed, at Qatar.

Key Responsibilities:

. Worked as a structural lead and perform project & Overall co-

ordination.

. Interaction with all multidiscipline for effective co-ordination to

sort out the vibration of piping system at Unit-15, QP, Meaiseed.

Project: Adequacy check Report of new lifting beam for removal of the

suction spool pipe of pump- PA110101 A/B/C at EDC/VDM process structure,at Qatar Vinyl Company- QVC, Qatar.

. Review of structural deliverables for additional pipe supports

provided on existing platforms

Key Responsibilities:

. Worked as a structural lead for particular project & done effective

Overall co-ordination as a project manager with client

. Interaction with all multidiscipline for proper co-ordination.

. Review of structural deliverables for new lifting beam and supporting

beams for EDC/ VDM process structure ( Report and relevant drawings)

Project: Adequacy check for Monorail beam in storage room/ Workshop area,

at OXYGEN PLANT - AL GASAL, at Ras Laffan

Key Responsibilities:

. Worked as a structural lead and perform project & Overall co-

ordination as project Manager.

. Review of structural deliverables for providing additional monorail

beam in storage building.

.

Project: Vibration and Flexibility Analysis of piping Unit-15 at QATAR

PETROLEUM, Meaissed, at Qatar.

Key Responsibilities:

. Worked as a structural lead and perform project & Overall co-

ordination.

. Interaction with all multidiscipline for effective co-ordination to

sort out the vibration of piping system at Unit-15, QP, Meaiseed.

. Review of structural deliverables for additional pipe supports

provided on existing platforms

Project: FEED Study of new Fuel Oil Gas system for SEREPT, TUNISIA.

Key Responsibilities:

. Perform adequacy check for additional / modification of equipment

(like storage tank etc) on PF2 platform by SACS software- in-place

analysis.

. Provide structural input to Basic general documents like Design basis,

site survey report, EPIC scope of work, Dossier.

Project: Vibration and Flexibility Analysis of piping Unit-15 at QATAR

PETROLEUM, Meaissed, at Qatar.

Key Responsibilities:

. Worked as a structural lead and perform project & Overall co-

ordination.

. Interaction with all multidiscipline for effective co-ordination to

sort out the vibration of piping system at Unit-15, QP, Meaiseed.

. Review of structural deliverables for additional pipe supports

provided on existing platforms

.

Project: Detail engineering for Aviation Fuel Facilities at Zirku, ZAKUM

DEVELOPMENT COMPANY,at AbuDhabi

Key Responsibilities

. Worked as a civil lead for that particular project & Overall co-

ordination

. Interaction with Abudhabi office for reviewing the deliverables

. Interdisciplinary co-ordination with piping and E & I, Review of

Vendor drawings

2008 - 2011 LINDE ENGINEERING INDIA PVT. LTD ( German company)

Principal Civil/Structural Engineer

Projects & Responsibilities

Project: Detailed Engineering for Ethylene Plant EU3, for Abu Dhabi

Polymers Company Limited, at Ruwais, ABU DHABI

Key Responsibilities

. Worked as a civil lead for that particular project & Overall co-

ordination

. Interaction with CCC (Consolidated Contractors Company, Abu Dhabi)

. Interdisciplinary co-ordination with piping and E & I, Redlining

(Review of Vendor drawings.

. Checking & Reviewing underground activities to make clash free plant

through Continuous model review

. Total Man-hour handled for the project are 32000MHr

Project: Detailed Engineering for Ethylene Plant EU2, for Abu Dhabi

Polymers Company Limited, at Ruwais, Abu Dhabi

Owner : Abu Dhabi Polymers Company Limited

Design Code used : AISC 360-05

. Technological structure

. Various types of Operating stages and pipe supporting structures.

Key Responsibilities

. Working as a area lead for that particular project & performing design

activities & checking & reviewing design documentation, (Static

calculation), drawings & model review.

2008 - 2001 L&T-CHIYODA LTD. (Chiyoda Corporation, Yokohoma, Japan)

Assistant Consultant Engineer - Civil & Structural

Responsibilities

Project: Detailed Engineering for Methanol & CO plant associated with

associated Facilities, SAUDI ARABIA

Owner : Saudi Formaldehyde Chemical Co. Ltd.

Key Responsibilities

. Preparation /Review of design criteria for civil, structural &

building works and review of standard drawings.

. Control & review of 3D modeling, Man-hour & schedule planning &

control

. Resource planning and review detail design engineering work & drawing

of main pipe rack Supporting with Air fin cooler & also reviewed

various structures etc, using international codes.

. Overall coordination with construction subcontractor & client.

. Review of soil investigation data &also review of pile design & ground

improvement of soil.

. To train junior designers & engineers. Preparation & control of MTO

for civil/structural procurement.

o Total Manhours handled for this project are 45000 Mhs

Project: Detailed Engineering for Bahrain Petroleum Company, Sitra,

BAHRAIN.

Design Code: ACI 318 & BS 5950

Basic information related to Project: Following are the Main four Units

Total Manpower Handled for this project: 22000 Mhr

Sulphur Recovery Unit (SRU-Train 4 -Unit 65)

Tail Gas Treating Unit (TGTU-Unit 68)

Olefinic Gas Treating Unit (OGTU-Unit 69)

Sour Water Stripping Unit (SWS-Train-3-Unit 74 / SWS-Train-4-Unit 75)

OSBL Piperack connecting Sulphur Recovery Unit (SRU-Train 4 -Unit 65) with

Sour Water Stripping Unit (SWS-Train-3-Unit 74 / SWS-Train-4-Unit 75).

Detailed engineering Activities:

. Process and Offsite Pipe Racks.

. Technological structure (Equipment supporting structure)

. Updation of spreadsheet as per project specific requirements

Key Responsibilities

Overall role responsibility to understand client's system & methodology so

as to strengthen prospective association with them

Project: Detailed Engineering for Saudi Methanol Project, at Al-Jubail.

(SIPC), SAUDI ARABIA.

. Detailed Engineering for Diesel Hydrotreater Unit.

. Design Code: IS :456, IS :800

. Design of Process pipe rack

. Design of compressor Foundation

Project: Detailed Engineering for Neptha Hydrocracker Unit for CPCL

Refinery

. Design of Process pipe rack

. Design of compressor Foundation

Project: Detailed Engineering for Qatar Petroleum, Chiyoda-Technip joint

venture, Ras Laffan, Qatar.

Key Responsibilities

As area lead for the Unit & performing design activities & checking &

reviewing design documentation, drawings & model review

. Technological structure

. Various types of Operating stages and pipe supporting structures.

Project: Proposal Engineering for Qatar PERL GTL, Qatar. (Chiyoda proposal

jobs)

Design Code: ACI 318

. Design of Unit Pipe rack for NGL Extraction Unit

. Design of propane gas accumulator Structure

. Compilation of MTO

Project: Detail Engineering for Isomerisation Project, Manglore Refinery,

Manglore

Design Code: IS: 456, IS:800

. Design of Main process Pipe rack (Composite with pipe rack)

. Review of Equipment foundation design

. Design of Refrigeration shelter

. Pavement design

Project: Detailed Engineering for Gasco Buhasa Project, at Abu Dhabi

Design Code: BS 8110 & BS 5950

. Equipment mounted platforms and stages

. Design of Blast resistant substation Building

Project: Detailed Engineering for Mathura Isomerisation project (MSQ)

Design Code: IS : 456, IS :800

. Design of Sub unit Pipe rack

. Design of compressor foundation

. Design of Heater Foundation

. Design of Miscellaneous Structure

1993 - 2000 CIVICON CONSULTING ENGINEERS, INDIA

Assistant consultant Engineer

Projects and Responsibilities

Key responsibilites

. Structure design of various types of industrial & commercial

buildings & complete co-ordination with clients

Project : IFFCO -Phulpur- P.D.I.L INDIA

. Structure design of substation building & overall co-ordination with

P.D.I.L

Project: IFFCO -Kalol- P.D.I.L

. Structure design & checking of Control building for P.D.I.L

Project: D. Wren International co.

. Perform analysis & design for Oil filling pump station

Project: Sayaji Hotels groups- Indore, INDIA

. Analysts for Sayaji Hotel at Indore & overall co-ordination with

client.

Project: 20 Micron Ltd.

. Structure design & checking of drawings for Machine foundation

Project: G.S.F.C- Vadodara

. Rehabilitation of different structures for Urea & AS/DAP plant, for

G.S.F.C

Project: Duncan Industries pvt. Ltd- Kanpur

. Rehabilitation of silo tower structure & checking of stability of

structure for Duncan Industry at kanpur.

Thanks,

MONA SHAH

Curriculum Vitae