AZMAT ALAM
NEAR WATER TANK WORD NO-** MOTIPUR
MUZAFFARPUR (BIHAR)
PIN-843111
E-mail- acgjzb@r.postjobfree.com
Mob-+918*********, 810-***-****
POST-SITE ENGINEER(MEP-ELECTRICAL)
OBJECTIVE
"To be a part of a world class company that provides challenging
opportunities to enhance my knowledge and contribute positively to the
growth of the organization and self."
PROFESSIONAL QULIFICATION
Examinations Passed Board/University Year %
B TECH (ELECTRICAL) J N T U HYDERABAD 2009-2013 68.74
TECHNICAL TRAINING
IN ELECTEICAL DESING AND DRAFTING (MEP-ELECTRICAL)
FROM AIR VOICE ENGINEERING SOLUTION PVT. LTD. HYDERABAD.
DURATION-DEC-2012 TO MAY-2013
BRIEF DESCRIPTION-
> Fundamental of electrics
> Codes and standard to be followed
> Electrical design calculation
> Load calculation
> Cable size calculation
> Lv & Lc wiring
> Distribution & installation
> Power generation & transmission
> Switch gear protection
> Load distribution schedule
> Drafting
> G+N industrial & domestic load calculation
TECHNICAL COURSES
> C-PROGRAMING & DATA STUCTURE for 1 year in 2010
> AUTO CAD (electrical) from Auto desk for 3 month (80 hr)
> Diploma in circuit analysis and designing (D-CAD) for 3 month in 2012
> EMBBEDID SYSTEM (diploma) for 2 month in 2013
WORK EXPERIENCE
> COMPANY NAME- ZIMNY ELECTRICALS (Jamshedpur, Jharkhand )
> Duration - 15-05-2013 to JUN 2014
> Work profile- SITE ENGINEER IN MEP SECTION
WORK RESPONSIBILITY
> Ensured that the products were installed correctly and tested them
> Coordination with the contractors and suppliers and maintained good
working relations
> Tested the system and identified any discrepancies in construction
projects and objectives
> Ensured that the work was completed in accordance with the projects
schedule and the construction contract
> Prepared that the technical documents and ensured that work was
carried in accordance to the drawings and specification.
> Maintained the different phase of the projects and evaluated all the
technical problems and resolve them.
TRAINING
> ORGANIZATION-NTPC LTD.
> DURATION-21 DAYS
> BRIEF DESCRIPTION-I worked at power generating station and mainly
focused on AVR, BOILER,TURBINE and COAL HANDELING PLANT
PROJECTS
1. Project Title-FOOT STEP POWER GENERATION SYSTEM OF RURAL APPLICATION
FOR RUN AC & DC LOAD.
BRIEF DESCRIPTION-In this project the conversion of the force
energy in to electrical energy. The control mechanism carries the A.C
ripples neutralizer, unidirectional current controller and 12V, 1.3Amp lead
acid dc rechargeable battery and an inverter is used to drive AC/DC loads.
The battery is connected to the inverter. This inverter is used to convert
the 12 Volt D.C to the 230 Volt A.C. This 230 Volt A.C voltage is used to
activate the loads
2. Project Title-WIRELESS DC MOTOR SPEED & DIRECTION CONTROL USING RF
COMMUNICATION
BRIF DISCRIPTION-Controlling industrial / home appliances is a very
interesting and useful project. This project is designed to control up to
four electrical appliances. This project used popular RF encoder and
decoder IC's
ACADEMIC QULIFICATION
Examinations Passed Board/University Year %
Intermediate B.S.E.B (Patna) 2009 56.98
High School B.S.E.B (Patna) 2006 54.72
COMPUTER SKILLS
> Languages : c language
> Operating systems : windows 07/08,xp
> Package : M S Office 20003.2007.2010
Personal Profile
> Father's Name : SARFARAZ AHMAD
> Date of Birth : 24-10-1991
> Sex : Male
> Nationality : Indian
> Languages Known : English, Hindi and Urdo
Personal Skills
> Good Communication Skills
> Good Team Player
> Good Analytical Skills
> Good at Implementing Things
Declaration:
I do hereby declare that the information submitted by me is true to the
best of my knowledge.
Date :
Place :NEW DELHI
AZMAT ALAM