Post Job Free
Sign in

Petroleum Engineer

Location:
Mexico
Salary:
6500
Posted:
October 10, 2014

Contact this candidate

Resume:

Full Names: HERMES ANTONIO ROMERO ESPINOZA

Position: Professional Specialist

Venezuela

Country of birth

**/**/****

Date of birth:

Spanish and English

Languages:

Contact: +521********** / ********@*****.***

Experience: Over 9 years

SUMMARY:

Over 9 years of experience developing engineering optimization and productivity tasks in oil

fields of light, heavy and extra-heavy oil, specifically in the design, evaluation and diagnosis of

artificial lift systems. I have participated in projects aimed at the search improvements in Rod

Pump, GL, PCP and ESP. Also, I worked with the diagnostic of damage formation, and

evaluation for the application of stimulation work. My different positions have allowed me to

interact in reservoir evaluation works, interpretation of geological data, wells services

operations, repair and drilling of wells. Additionally, I have worked in the elaboration of

technical specifications for the procurement of artificial lift systems and completion

equipment.

In the region south western of Gulf of Mexico, I participated as Productivity Engineer in the technologic

wells planning Project in the Abkatun Pol Chuc and Littoral active, to incorporate technological

improvements that contribute in enhancing of the productivity wells. Additionally, I executed projects of

evaluations to the integral model of wells and feasibility evaluation from artificial lift system.

EDUCATION:

Petroleum Engineer

Universidad Central de Venezuela

2005

Diplomat of Heavy Oil

Universidad Gran Mariscal de Ayacucho

2007

Skills:

Strong knowledge and domain of simulation for artificial lift systems and nodal analysis.

Solid knowledge in design, diagnostic and monitoring of artificial lifting systems .

Hard knowledge in evaluation of horizontal and multilateral wells.

Page 1/6

Solid domain in the diagnostic of damage formation.

Strong knowledge in production optimization.

Hard experience in handling fields with automated monitoring systems.

Solid knowledge and experience in operations of well services, reservoir and drilling of directional,

horizontal and multilateral wells.

WORK EXPERIENCE:

PHISOGI México. Consulting Senior Engineer of Productivity. October, 2012 to present.

- Productivity study to technological projects in offshore well for carbonate reservoir on Abkatun Pol-

Chuc and Littoral fields.

- Evaluation and implementation of new technologies and best practices to improve the productivity of

oil well.

- Evaluation of stimulation work.

- Evaluation and estimations of initial production rates for oil well with probabilistic methodology.

- Generate the variables of high and low impact in the productivity of wells.

- Generate sensibilities with nodal analysis to evaluate production strategies.

- Design and diagnostic of artificial lift system (ESP, GL).

- Feasibility studies for the implementation of ALS

Featured projects

Evaluation of technical feasibility for application of artificial lift systems in the Ixtal field.

Update of simulation model and estimate the initial production rate by new wells in

Yaxché – Xanab – Hokchi fields.

The technologic wells planning Project in the Abkatun Pol Chuc and Littoral fields.

PDVSA. Coordinator of Production Optimization Cabrutica. June, 2011 – October, 2012.

- Planning of procurement and technical services to be contracted.

- Planning and implementation of new technologies for the completion of production wells.

- Coordinate and evaluate the implementation of best operational practices to reduce deferred

production.

- Evaluate and coordinate (in synergy with field development reservoir & Drilling) proposals for

drilling, completion and workover.

Page 1/6

PDVSA. Optimization of Production Engineer Cabrutica. May, 2009 – June, 2011.

Develop and monitor the artificial lift system for to contribute in the increase to the

production.

Design of artificial lift system (ESP, Rod Pump, PCP) to new wells, workover, well services

and special projects.

Development, monitoring and optimization of wells with instrumentation for real time

monitoring in horizontal and multilateral wells.

Evaluation and development of new technologies and best practices for artificial lift system.

Monitoring and optimization of diluent system in heavy oil well.

Preparation of daily operation activities.

Evaluation of formation damages and proposals of well stimulation.

Requests for materials and equipment for the completion of wells.

Featured projects

Design, installation, evaluation and monitoring of completions for wells subject to cyclic

steam injection using progressive cavity pumps with elastomers for thermal applications.

Work plan for intervention and completion with coiled tubing by low productivity wells for

reduce the OPEX of intervention and formation damage.

Developing and implementing of campaign to update and modernization of equipment for

data acquisition gauge of Cabrutica District.

Termination design for wells recovery plan of Mara – Zuata cluster.

PDVSA. Optimization of Production Engineer Liviano – Mediano - Dación April, 2006 -

May, 2009.

Develop and monitor the artificial lift system for to contribute in the increase to the

production.

Design of artificial lift system (ESP, Rod Pump, PCP, and GL) to new wells, workover, well

services and special projects.

Development, monitoring and optimization of vertical, directional and horizontal wells.

Page 1/6

Evaluation and development of new technologies and best practices for artificial lift system.

Monitoring and optimization of diluent system in heavy oil well.

Preparation of daily operation activities.

Evaluation of formation damages and proposals of well stimulation.

Requests for materials and equipment for the completion of wells.

Featured projects

Reactivation of sensors monitoring in wells with ESP systems and preparation of

plans for monitoring and evaluation of sensor data.

Improvement designs of gas lift systems by low productivity wells to avoid the

formation of hydrates in surface equipment as a result of pressure drops

Evaluation of inyectivity indexes in water disposal wells of Dacion field (200000 BPD).

Construction of database with the information of dynamic fluid measures t o be used in

monitoring and diagnostic in wells without sensor gauges.

Improvement in the termination schemes to reduce buoyancy problems in rod sucker

in rod pump wells.

Implementation and evaluation of valves with Venturi effect to stabilize the injection

point in gas lift wells.

Evaluation and characterization of elastomers to optimize the use of progressive

cavities equipment by wells in the fields.

Preparation of stimulations plans in wells with paraffin formation problems.

PetroUCV; S.A Optimization of Production Engineer. July 2005 – April 2006

Develop and monitor the artificial lift system for to contribute in the increase to the

production.

Design of artificial lift system (Rod Pump, PCP) to new wells, workover, well services and

special projects.

Evaluation and development of new technologies and best practices for artificial lift system.

Page 1/6

Preparation of daily operation activities.

Evaluation of formation damages and proposals of well stimulation.

Requests for materials and equipment for the completion of wells.

Featured projects

Construction of database with the information of dynamic fluid measures t o be used in

monitoring and diagnostic in wells without sensor gauges.

Evaluation of feasibility and implementation of progressive cavity equipment of rate

flow medium (500-800 BPD) powered by gas engines for the first horizontal wells

drilled in the area.

Implementation and evaluation of prepackaged gravel pack for sand control

completions on new wells and subject to repair.

MAIN SPECIAL COURSES ATTEND:

Basic Course of Stars and Cmost. Caracas, Abril 12

Completion and Production Workshop. Maracaibo, March 11

Pressure Analysis Course. Maracaibo, November 10

Thermal Recovery of Heavy Oil. Puerto La Cruz, November 09.

Rod Pumping Optimization Advanced. Maracaibo, October 08.

ESP Design, Analysis and Optimization with Sub pump. Caracas, April 08.

Echometer, Maracaibo, February 07

Artificial Gas Lift for engineer, San Tomé, September 06

Wellflow Basic and Advanced, San Tomé, July 06

Nodal Analysis of collection and pumping systems. Caracas, May 07.

Introduction to Natural Gas Engineering. Institute of Technology UCV, March 05.

Basic Workshop Process Simulation. OPIC Consultants. Caracas, March 05.

Special Work of Transmission and Distribution Systems of Natural Gas. Institute of Technology

UCV, March 05

Operational Analysis of Transmission and Distribution Systems of Natural Gas. Institute of

Technology UCV, March 05.

PIPESIM, Caracas November 04

Maintenance of Transmission and Distribution Systems of Natural Gas. Institute of Technology.

UCV, November 04.

Operation of Transmission and Distribution Systems of Natural Gas. Institute of Technology.

UCV. August 04.

Page 1/6

Natural Gas Transport. Institute of Technology. UCV, June 04

Natural Gas Measurement. Institute of Technology. UCV, May 04.

Cementing Oil and Gas wells. Holcim de Venezuela SA. UCV, February 04.

Computer Skills:

Artificial Lift Systems and Nodal Analysis: Suite Theta (Rodstar, Xdiag, Cbalance), Wellflow, PC-PUMP,

PIPESIM, SUBPUMP, AutographPC, Prosper, GAP, AutographPC, Netools, DMS.

Pressure Analysis: Pansystem.

Reservoir Simulation: Eclipse 100, CMG Suite (Imex, Stars y Cmost)

Capture fluid levels: ECHOMETER

Production monitoring: OFM, ASPEN Explorer.

Database: Wellview, TOW, Oracle.

Suite Office: Excel, Word, Powerpoint, Project.

Page 1/6



Contact this candidate