Full Names: HERMES ANTONIO ROMERO ESPINOZA
Position: Professional Specialist
Venezuela
Country of birth
Date of birth:
Spanish and English
Languages:
Contact: +521********** / ********@*****.***
Experience: Over 9 years
SUMMARY:
Over 9 years of experience developing engineering optimization and productivity tasks in oil
fields of light, heavy and extra-heavy oil, specifically in the design, evaluation and diagnosis of
artificial lift systems. I have participated in projects aimed at the search improvements in Rod
Pump, GL, PCP and ESP. Also, I worked with the diagnostic of damage formation, and
evaluation for the application of stimulation work. My different positions have allowed me to
interact in reservoir evaluation works, interpretation of geological data, wells services
operations, repair and drilling of wells. Additionally, I have worked in the elaboration of
technical specifications for the procurement of artificial lift systems and completion
equipment.
In the region south western of Gulf of Mexico, I participated as Productivity Engineer in the technologic
wells planning Project in the Abkatun Pol Chuc and Littoral active, to incorporate technological
improvements that contribute in enhancing of the productivity wells. Additionally, I executed projects of
evaluations to the integral model of wells and feasibility evaluation from artificial lift system.
EDUCATION:
Petroleum Engineer
Universidad Central de Venezuela
2005
Diplomat of Heavy Oil
Universidad Gran Mariscal de Ayacucho
2007
Skills:
Strong knowledge and domain of simulation for artificial lift systems and nodal analysis.
Solid knowledge in design, diagnostic and monitoring of artificial lifting systems .
Hard knowledge in evaluation of horizontal and multilateral wells.
Page 1/6
Solid domain in the diagnostic of damage formation.
Strong knowledge in production optimization.
Hard experience in handling fields with automated monitoring systems.
Solid knowledge and experience in operations of well services, reservoir and drilling of directional,
horizontal and multilateral wells.
WORK EXPERIENCE:
PHISOGI México. Consulting Senior Engineer of Productivity. October, 2012 to present.
- Productivity study to technological projects in offshore well for carbonate reservoir on Abkatun Pol-
Chuc and Littoral fields.
- Evaluation and implementation of new technologies and best practices to improve the productivity of
oil well.
- Evaluation of stimulation work.
- Evaluation and estimations of initial production rates for oil well with probabilistic methodology.
- Generate the variables of high and low impact in the productivity of wells.
- Generate sensibilities with nodal analysis to evaluate production strategies.
- Design and diagnostic of artificial lift system (ESP, GL).
- Feasibility studies for the implementation of ALS
Featured projects
Evaluation of technical feasibility for application of artificial lift systems in the Ixtal field.
Update of simulation model and estimate the initial production rate by new wells in
Yaxché – Xanab – Hokchi fields.
The technologic wells planning Project in the Abkatun Pol Chuc and Littoral fields.
PDVSA. Coordinator of Production Optimization Cabrutica. June, 2011 – October, 2012.
- Planning of procurement and technical services to be contracted.
- Planning and implementation of new technologies for the completion of production wells.
- Coordinate and evaluate the implementation of best operational practices to reduce deferred
production.
- Evaluate and coordinate (in synergy with field development reservoir & Drilling) proposals for
drilling, completion and workover.
Page 1/6
PDVSA. Optimization of Production Engineer Cabrutica. May, 2009 – June, 2011.
Develop and monitor the artificial lift system for to contribute in the increase to the
production.
Design of artificial lift system (ESP, Rod Pump, PCP) to new wells, workover, well services
and special projects.
Development, monitoring and optimization of wells with instrumentation for real time
monitoring in horizontal and multilateral wells.
Evaluation and development of new technologies and best practices for artificial lift system.
Monitoring and optimization of diluent system in heavy oil well.
Preparation of daily operation activities.
Evaluation of formation damages and proposals of well stimulation.
Requests for materials and equipment for the completion of wells.
Featured projects
Design, installation, evaluation and monitoring of completions for wells subject to cyclic
steam injection using progressive cavity pumps with elastomers for thermal applications.
Work plan for intervention and completion with coiled tubing by low productivity wells for
reduce the OPEX of intervention and formation damage.
Developing and implementing of campaign to update and modernization of equipment for
data acquisition gauge of Cabrutica District.
Termination design for wells recovery plan of Mara – Zuata cluster.
PDVSA. Optimization of Production Engineer Liviano – Mediano - Dación April, 2006 -
May, 2009.
Develop and monitor the artificial lift system for to contribute in the increase to the
production.
Design of artificial lift system (ESP, Rod Pump, PCP, and GL) to new wells, workover, well
services and special projects.
Development, monitoring and optimization of vertical, directional and horizontal wells.
Page 1/6
Evaluation and development of new technologies and best practices for artificial lift system.
Monitoring and optimization of diluent system in heavy oil well.
Preparation of daily operation activities.
Evaluation of formation damages and proposals of well stimulation.
Requests for materials and equipment for the completion of wells.
Featured projects
Reactivation of sensors monitoring in wells with ESP systems and preparation of
plans for monitoring and evaluation of sensor data.
Improvement designs of gas lift systems by low productivity wells to avoid the
formation of hydrates in surface equipment as a result of pressure drops
Evaluation of inyectivity indexes in water disposal wells of Dacion field (200000 BPD).
Construction of database with the information of dynamic fluid measures t o be used in
monitoring and diagnostic in wells without sensor gauges.
Improvement in the termination schemes to reduce buoyancy problems in rod sucker
in rod pump wells.
Implementation and evaluation of valves with Venturi effect to stabilize the injection
point in gas lift wells.
Evaluation and characterization of elastomers to optimize the use of progressive
cavities equipment by wells in the fields.
Preparation of stimulations plans in wells with paraffin formation problems.
PetroUCV; S.A Optimization of Production Engineer. July 2005 – April 2006
Develop and monitor the artificial lift system for to contribute in the increase to the
production.
Design of artificial lift system (Rod Pump, PCP) to new wells, workover, well services and
special projects.
Evaluation and development of new technologies and best practices for artificial lift system.
Page 1/6
Preparation of daily operation activities.
Evaluation of formation damages and proposals of well stimulation.
Requests for materials and equipment for the completion of wells.
Featured projects
Construction of database with the information of dynamic fluid measures t o be used in
monitoring and diagnostic in wells without sensor gauges.
Evaluation of feasibility and implementation of progressive cavity equipment of rate
flow medium (500-800 BPD) powered by gas engines for the first horizontal wells
drilled in the area.
Implementation and evaluation of prepackaged gravel pack for sand control
completions on new wells and subject to repair.
MAIN SPECIAL COURSES ATTEND:
Basic Course of Stars and Cmost. Caracas, Abril 12
Completion and Production Workshop. Maracaibo, March 11
Pressure Analysis Course. Maracaibo, November 10
Thermal Recovery of Heavy Oil. Puerto La Cruz, November 09.
Rod Pumping Optimization Advanced. Maracaibo, October 08.
ESP Design, Analysis and Optimization with Sub pump. Caracas, April 08.
Echometer, Maracaibo, February 07
Artificial Gas Lift for engineer, San Tomé, September 06
Wellflow Basic and Advanced, San Tomé, July 06
Nodal Analysis of collection and pumping systems. Caracas, May 07.
Introduction to Natural Gas Engineering. Institute of Technology UCV, March 05.
Basic Workshop Process Simulation. OPIC Consultants. Caracas, March 05.
Special Work of Transmission and Distribution Systems of Natural Gas. Institute of Technology
UCV, March 05
Operational Analysis of Transmission and Distribution Systems of Natural Gas. Institute of
Technology UCV, March 05.
PIPESIM, Caracas November 04
Maintenance of Transmission and Distribution Systems of Natural Gas. Institute of Technology.
UCV, November 04.
Operation of Transmission and Distribution Systems of Natural Gas. Institute of Technology.
UCV. August 04.
Page 1/6
Natural Gas Transport. Institute of Technology. UCV, June 04
Natural Gas Measurement. Institute of Technology. UCV, May 04.
Cementing Oil and Gas wells. Holcim de Venezuela SA. UCV, February 04.
Computer Skills:
Artificial Lift Systems and Nodal Analysis: Suite Theta (Rodstar, Xdiag, Cbalance), Wellflow, PC-PUMP,
PIPESIM, SUBPUMP, AutographPC, Prosper, GAP, AutographPC, Netools, DMS.
Pressure Analysis: Pansystem.
Reservoir Simulation: Eclipse 100, CMG Suite (Imex, Stars y Cmost)
Capture fluid levels: ECHOMETER
Production monitoring: OFM, ASPEN Explorer.
Database: Wellview, TOW, Oracle.
Suite Office: Excel, Word, Powerpoint, Project.
Page 1/6