ORLAN IGASAN MORENO
Sheet Metal Worker / Lagger
Cell No. +639********* / Home No. (043-***-****
OBJECTIVE
To be part of an institution with a working environment conductive
for personal upliftment, intellectual and career advancement and attains a
position that would offer job satisfaction and channels for application of
knowledge gained.
EDUCATION
ELECTRONICS
Batangas State University (Formerly P. B. M. I. T.)
J. P. Rizal Avenue, Batangas City
April 1993
TRAINING
Technical Education and Skills Development Authority
TESDA Regional Training Center
J. P. Rizal Avenue, Batangas City
Transcript of Competencies (Common Wiring Electrical)
Batangas Association for Guaranteed Metalcraft & Engineering
Technology
(BAGMET)
Libjo Tacad, Batangas City
Transcript of Competencies (Pipe Insulation)
WORKING HISTORY
Company : BECHTEL
Project : Bechtel Glad Stone LNG Project
Module Yard Batangas, Philippines
Position : Sheet Metal Worker / lagger
Inclusive Date : July 27, 2013 to August 21, 2014
Duties and Responsibilities
> Always be present on tool box meeting and be engaged cooperate and
understand (JHA) & STARRT Card before execution of tasks.
> Preparation of tools and materials either hot or cold process
insulation.
For Hot Acoustic Insulation
> Attach rubber band on pipes for installation of insulation materials
purposes laying of first layer, (mineral wool) in staggered position
at least 300mm then secure with filament tape. Install second layer
(mineral wool) in staggered position then secure with stainless strap
band by use of pistol grip at least 300mm distance each band.
> Installation of vinyl over second layer of insulation grip it by use
of rachet belt or lease joint must be in 3 or 9 o'clock position.
Apply adhesive (rugby) in vertical & horizontal joints secure it with
stainless strap band at least 300mm distance of each band.
For Cold Acoustic / Anti Sweat Insulation
> Attach rubber band on pipeline intended for installation of materials.
> Laying of cellular foam glass in staggered position as apply 95.50
adhesive on all joint's then secure with strap band at least 300mm
distance each bands.
> Install mineral wool in staggered position as a second layer secure
with filament tape at least 300m distance each tapes.
> Install mineral wool in staggered position as a third layer secure
with strap band at least 300m distance each bands.
> Installation of vinyl over second layer of insulation grip it by use
of rachet belt or lease joint must be in 3 or 9 o'clock position.
Apply adhesive (rugby) in vertical & horizontal joints secure it with
stainless strap band at least 300mm distance of each band.
> Installation or sticking of vapor barrier over second layer of the
foam glass, joint should be in 3 or 9 o'clock position avoid
corrugated as possible.
For Cold Insulation
> Attach rubber band on pipe line intended for installation of
insulation materials.
> Detailing measuring & laying of cellular foam glass in staggered
position as a first layer (no Adhesive) make sure that there will be
no gaps secure with filament tape at least 300mm distance each tape.
> Detailing measuring & laying of cellular foam glass in staggered
position as a second layer make sure that there will be no gaps then
apply adhesive 95.50 secure with strap band at least 300mm distance
each band.
> Installation or sticking of vapor barrier over second layer of the
foam glass, joint should be in 3 or 9 o'clock position avoid
corrugated as possible.
For Metal Jacketing
> Installation of sheet metal over insulated pipe's, detailing measuring
of metal prior to installation, the joint must be in 3 or 9 o'clock
position then secure with stainless strap band by use of pistol grip
at 200mm distance each band for aluminum while 150mm for stainless and
provided with expansion spring from 30" pipe and up size on hot while
with no expansion spring for cold.
> Detailing measuring cutting of support box either stainless or
aluminum for installation purposes.
> Installation of 450, 900 bend, lobster back, segmented elbow, saddle,
end cups and all associated sheet metal fitting's required at job
site, provided with back up strip as armor to avoid inner insulation
from damage specially on 900 elbow, supports and boxes.
> Apply silicone sealant on all joints vertical and horizontal joints as
finishing torch to prevent water penetration.
> All activities must be guided by inspector.
Company : AGC AN AUS GROUP COMPANY
Project : Pluto LNG Project
Western Australia Perth Karratha
Position : Sheet Metal Worker / Lagger
Inclusive Date : December 8, 2011 to March 6, 2012
Duties and Responsibilities
> Always be present on tool box meeting and be engaged cooperate and
understand (JHA) job hazard analysis and step back five. System before
starting activities.
> Installation of insulation materials and cladding for hot and cold
pipes, vessels, tank's valves and flanges. Make sure surface are clean
install vapor stop (Aluminum Foil) start installation of first layer
observe the gaps and the position of materials it should be staggered
position and no gaps fix it with filamen tape. Then install second
layer applied with adhesive in staggered position to avoid leak don't
leave any gaps then install vapor varier (TEMBUTIL) finish it with
Mylar Tape in all joints.
> After inspection is done start, install sheet metal the joint should
be in alternate position fix it with stainless strapp by using
strapping tools then finished it by applying silicon sealant.
Company : HYUNDAI HEAVY INDUSTRIES CO., LTD.
P.O. Box 20159 Doha Qatar
Project : Qatar Shell Pearl GTL Project
Ras Laffan Industrial City
Position : Tinsmith / Insulator
Inclusive Date : July 12, 2009 to July 05, 2011
Duties and Responsibilities
> Always be present on tool box meeting and be engaged cooperate and
understand (JHA) job hazard analysis & (TSTI) total safety task
instruction. System before starting activities.
> Performs layout and fabrication of fittings required on the job site.
> Installation of insulation materials and aluminum cladding for
commissioning purposes.
> Report directly to foreman / supervisor all accomplishment and
problems that arise.
> Installation of insulation materials and aluminum cladding on
pipelines, vessels tanks valves and flanges.
> Detailing and fabrication of aluminum cladding and fitting required of
job site like saddle, reducers conical and eccentric, equal and
unequal saddle, value box's flange box straight cladding, orange fill
or dome collars end caps elbows and flashing.
> Use of metal cladding materials equipment such as rolling machines,
grooving machine, strapping machine, bending machine, cutting machine,
divider, tin snip and nibbler with full safety pre - caution.
Company : BECHTEL & CO. LLC
SOHAR ALUMINUM SMELTER PROJECT
SULTANATE OF OMAN
Position : TINSMITH / INSULATOR
Inclusive Date : August 9, 2007 - August 28, 2008
Duties and Responsibilities
> Secure permit for insulation works, do the visual inspection of
scaffolding prior to use.
> Responses on Foreman / Supervisors instruction do also rectification
or cleaning of punch list.
> Removal of aluminum cladding and insulation materials due to O. C. and
U.T. inspection.
> Performs layout and fabrication of fittings required on the job site.
> Installation of insulation materials and aluminum cladding for
commissioning purposes.
> Report directly to foreman / supervisor all accomplishment and
problems that arise.
> Performs other related duties that maybe assigned from time to time.
Company : BECHTEL INTERNATIONAL
BECHTEL EG LNG Train 1 Project
MALABO EQUATORIAL GUINEA
Position : TINSMITH / INSULATOR
Inclusive Date : May 20, 2006 - May 16, 2007
Duties and Responsibilities
> Use of metal cladding materials equipment such as rolling machines,
grooving machine, strapping machine, bending machine, cutting machine,
divider, tin snip and nibbler with full safety pre - caution.
> Performs layout and fabrication of fittings required on the job site.
> Installation of insulation materials and aluminum cladding for
commissioning purposes.
Company : PSN PRODUCTION SERVICES NETWORK
BROWN & ROOT INDUSRIAL SERVICES
PHILIPPINES INC.
TABANGAO REFINERY, BATANGAS CITY
Position : TINSMITH / INSULATOR
Inclusive Date : March 17, 2004 - May 27, 2004
Duties and Responsibilities
> Read and interprets instruction and documentation and plan work
activities.
> Report and received assignment, instruction and direction from the
supervisor.
> Installation of insulation materials and aluminum cladding on
pipelines, vessels, tanks and flanges.
> Detailing and fabrication of aluminum cladding and fitting required on
job site like saddle, reducers conical and eccentric, equal and
unequal saddle, value box's flange box straight cladding, orange fill
or dome collars end caps elbows and flashing.
Company : ECG TRADING & GENERAL CONTRACTOR
BRGY. DUMANTAY, BATANGAS CITY
TEL. No. & FAX No. 783-8101
Mobile No. +639**-*******
Position : TINSMITH / INSULATOR
Inclusive Date : October 15, 2001 - December 19, 2003
Duties and Responsibilities
> Read and interprets instruction and documentation and plan work
activities.
> Report and received assignment, instruction and direction from the
supervisor.
> Installation of insulation materials and aluminum cladding on
pipelines, vessels, tanks and flanges.
> Detailing and fabrication of aluminum cladding and fitting required on
job site like saddle, reducers conical and eccentric, equal and
unequal saddle, value box's flange box straight cladding, orange fill
or dome collars end caps elbows and flashing.
Company : DAELIM COMPANY LTD.
FORMOSA PLASTIC CORPORATION
Taiwan, R.O.C.
Position : TINSMITH FABRICATOR
Inclusive Date : February 5, 1999 - February 1, 2000
Duties and Responsibilities
> Performs layout and fabrication of fittings required on the job site.
> Installation of insulation materials and aluminum cladding for
commissioning purposes.
> Report directly to foreman / supervisor all accomplishment and
problems that arise.
> Performs layout and fabrication of fittings required on the job site.
> Report directly to foreman / supervisor all accomplishment and
problems that arise.
PERSONAL PROFILE
Birthdate December 21, 1972
Birthplace Batangas City
Gender Male
Civil Status Married
Nationality Filipino
Religion Roman Catholic
SSS No. 04-0855643-1
Passport No. EC1737318
EDUCATIONAL BACKGROUND
VOCATIONAL
Batangas State University
(Formerly Pablo Borbon Memorial Institute of Technology)
Electronics
Batangas City (April 1993)
SECONDARY
University of Batangas
(Formerly Western Philippines Colleges)
Batangas City
ELEMENTARY
Batangas City South Elementary School
Batangas City
I hereby certify that the above information is true and correct to
the best of my knowledge and belief.
ORLAN I. MORENO
Applicant