K VENKATESAN ( Ven )
Education
Master Degree in Mechanical Engineering, Anna University 1989, India
Chartered Engineer, Institution of Engineers, India.
Corporate Membership, Institution of Engineers, India.
Member in ASHRAE, USA.
Citizenship: Singaporean.
VISA : USSFTA ( Unites States Singapore Free Trade Agreement in 2004 ) Professional VISA
category - H1B1 can be obtained for first 18 months and further extension is renewed.
Employer do not require to submit I - 129 form. ESTA clearance available for next two years.
Professional Attributes
Qualified Post-graduate, Chartered Mechanical Engineer, for professionalism shown during last 26
years of career in the field of Mechanical discipline with special technical capability in HVAC and
Process Utilities on design and construction.
He has successfully operated within multi-cultural environments and feels comfortable doing so. He
has managed teams of multidisciplinary engineers and interfaces effectively with related engineering
disciplines and national and international Architects.
As an excellent communicator, he is adept at securing technical and planning authority clearances
and presenting design and construction proposals to client teams.
His knowledge and abilities extend from feasibility studies, through to detailed design, procurement
and construction. Consequently he has been closely involved in vendor selection, site quality and
progress evaluation, shop and construction drawing approval, cost management and project
management.
Presently working as Lead Mechanical Engineer with M+W Singapore since year 2008. Has worked in
India, Malaysia and Singapore.
Key Summary Experience Breakdown By Project Type & Then Duties:
Data Centre Projects
Microsoft – 128 MW ( IT Load ) – 100 Acre Land - Malaysia
Principle Engineer for mechanical engineering discipline design management for Asia Pacific region,
leading / mentoring a group of 12 persons. HVAC with HT / LT chiller working in conjunction with
Thermal Storage tank during power outage. Mechanical infrastructure for 275 KV sub station. CFD
analysis for extreme weather condition for Generator working in conjunction with Cooling Tower and
Internal Data Hall Steady state conditions. Diesel Infill station designed to serve multiple above ground
belly fuel storage tanks. Drawings developed in REVIT.
Pacnet – 6MW ( IT load ) Singapore (EPC Project) – Singapore
Lead Mechanical Engineer, project was designed to achieve Tier 3 certification from the USA based
Up-Time Institute. First Data Centre project certified for design management in Singapore. Systems
included HVAC, Fire Protection, Diesel Fuel Oil and Building Services. Energy modeling was
undertaken using Trace 700.
Computational Fluid dynamics ( CFD ) was used for air flow design verification.
The project achieved Green Mark Gold Plus certification (similar to LEED). Also first data centre
certified by BCA based on new guidelines.
Resume_Ven.doc 1 of 4
Digital Realty- 30 MW ( IT load) – 30,000 sqm – Tenant fit-out (TKD), Singapore
Senior Mechanical Engineer project was designed to achieve Tier 3.5 certification. Systems
included HVAC, Fire Protection, Diesel Fuel Oil and Building Services. One of tenant, Face book - 6
MW
Equinix Data Center Front end design of mechanical works
Engineering Management of a Data Center extension in an existing factory in
Intel
Vietnam.
Detailed estimate of mechanical services including HVAC, Diesel, Plumbing
Yahoo Data Centre
and Sanitary.
Khazana Data Centre Peer review for project in Dubai and Abu Dubai
Jurong Data Centre, 30 MW, based build - Singapore (EPCM Project) - Senior Engineer
Construction and site management of mechanical base build infrastructure works
Systems included Air Conditioning, Diesel Fuel Oil (with 48 hours capacity underground storage)
Plumbing & Sanitary.
Responsibilities included interacting with the client and consultant team, and liaising with local
authorities
Other Industrial Projects
Michelin Tire Factory (EPCM) – 500 Acre land - India – Senior Engineer
Seconded to M+W India, and made responsible for the design, development of construction and co-
ordination drawings and preparation of tender documents.
Systems included Fire Protection, Process Cooling Water, Process Vacuum, Laboratory Vacuum,
Industrial Water, Sanitary Systems with pumping stations, Smoke Control and Ventilation.
Responsibilities included final material take-offs, interacting with the client and consultant team, and
liaising with local authorities.
Mead Johnson Dry Filling Line, Singapore (EPC Project) - Senior Engineer
Design of HVAC, Fire protection, Hot Water, Plumbing and Process Drain Systems.
Design, preparation of tender packages and cost estimations for HVAC,
AUO LCD Plant
Process Exhaust, Process Cooling Water, Process Vacuum, House Vacuum,
Fire Protection and Plumbing systems.
Western Digital Disk Design and detail estimate of Process Exhaust, Process Cooling Water,
Process Vacuum, House Vacuum, Scavenging Vacuum and HVAC.
Drive FAB
Feasibility study.
Mangosteen
Pharmaceuticals
Non-project related contributions to M+W Singapore
Selected to front and lead the development of the Singapore Knowledge Centre.
Resume_Ven.doc 2 of 4
As the Knowledge Manager for the region, he was key in determining the form and content of the
“data base”. He was charged with interacting with all regional groups around the world and ultimately
rolled out the system to the Singapore based engineers.
Other Industrial / Critical Mission Projects from Previous Employment – Singapore
ICES (A Star) Senior Project Manager.
BSL 2 Lab Responsible for design, construction and financial management.
Gemalto Pte Ltd Senior Project Manager
Cleanroom Project Responsible for design, construction and financial management including
obtaining the fire certificate. System include MEP and CSA works.
PUB Senior Project Manager
Cleanroom Project Design, construction and site management included obtaining authorities
clearance. System include MEP and CSA works. Fit out in an existing
building.
National University Senior Project Manager
Responsible for site management. HVAC Upgrade
Hospital
Novotel Hotel Senior Project Manager
Refurbishment Duties included design, project and financial management.
Infineon Project Manager.
Semiconductor Responsible for design and construction of ACMV & co-ordination with other
M & E trades.
Interaction with Consultant, Architect and Client.
Duties included financial management.
Parkway Parade Project Manager.
EPCM Hyper market Replacement of AHU’s and FCU’s and upgrading of car park and kitchen
and furniture mall ventilation. Interact with other trades, Consultants, Architects and Client.
project Duties included cost and cash flow management. Refurbishment Project
Gemplus Project Engineer.
(Prepaid telephone Fully responsible from inception to completion of design and construction
and credit card) management of HVAC, Cleanroom, Process and Solvent Exhaust,
Compressed Air, Dust Vacuum, Process Vacuum and Process Cooling
Water.
SKF Warehouse
Project Engineer – Site Supervision of ACMV works.
Commercial Project From Previous Employment, Malaysia
Times Square Senior Engineer
45 Storey Mixed Use Design management of ACMV (capacity 12,000 TR) including Cineplex,
Development Bowling Alley, Food Court, Indoor Theme Park, Restaurants, Shops, Offices,
Basement Car Parks, Hotel Ballrooms, Function Rooms and Service Suite
Kuala Lumpur
Apartments.
Close co-ordination with the architect, structural and acoustic consultants and
client.
Calculation tool developed for ACMV system design.
Design development for Air Conditioning, LPG, Fire Protection, Plumbing and
Sanitary services.
Project cost approximately USD 300 million.
Resume_Ven.doc 3 of 4
Oscar Food Court tenancy fit out works. Design of Air Conditioning,
Petronas Twin
Mechanical Ventilation, Fire protection, LPG, Plumbing and Sanitary.
Tower Annex Kuala
Lumpur, Malaysia
Previous Employment & Projects Handled – Project Engineer - India
Copper Clad Lamination Factory – HVAC vapour absorption system
with dehumidifier to maintain low RH for job site coastal area
Photo Voltaic Cell Factory – Air cooled chiller to maintain low RH with
heater control in air stream
Software Training Institute – water cooled chiller
Various Telephone Exchanges in Gujarat
India Radio Broadcasting Recording Studio – High acoustic
performance met
Three Star Hotel Manoharama project
300 bed Hospital and Multi-Purpose Hall for Visakhapatnam Steel
Plant township.
Feed study of Aurobindo Ashram – HVAC for meditation hall
Research analysis on technical feasibility of modern rice mill co
generation.
Worked as Planning Engineer in a production factory supplying CNC
machines to Bajaj factory.
Worked as Service Engineer for Kelvinator – imparting training to
technicians, handle consumer protection council case to resolve amicably
and interaction with factory for product upgrade
Non-project related contributions
Software development for heat load estimation on an hourly basis and for calculating the peak load.
The engineering data was used for the selection of the equipment, the maximum and minimum
tonnage of the building for multiple zones with diversity. Its purpose was to rationalize the installed
chiller capacity and optimize the sizing of chilled water and condenser water pipes and pumps,
evaluation of airflow for staircases and lift lobby pressurization and static pressure for Mechanical
Ventilation systems.
Overall Summary of experience gained in years from various sectors
o
Industrial Hotel Commercial Hospital Office
No. of Years 17 1.3 4.5 1 2.2
Design 50% 40% 45% 40% 60%
Management
Project 30% 40% 35% 50% 30%
Management
Site 20% 20% 20% 10% 10%
Management
Resume_Ven.doc 4 of 4