David M. McAlpine BSME
*** ******** **** 757-***-****
Suffolk, VA 23435 *****-********@*******.***
EXPERIENCE NEWPORT NEWS SHIPBUILDING Newport News, VA
**** - **** ****** ******* **** Procedure Writer
• Wrote initial technical nuclear fluid systems test procedures to validate the reactor plant design of Ford class aircraft carriers.
• Wrote detailed reactor plant acceptance test procedures for overhaul (CVN68-70) and new construction (CVN76-78) Nimitz class aircraft carriers.
• Proposed elimination of reactor plant low-temperature transient testing resulting in cost reduction of $1,000,000 over life of ship class.
• Mentored new procedure writers to ensure their performance development.
1995 - 1999 Assistant Chief Test Engineer
• Supervised all test personnel and testing of the lead reactor plant on new construction Nimitz class aircraft carriers.
• Represented Newport News Shipbuilding in matters pertaining to testing of lead plant reactor plant on new construction Nimitz class aircraft carriers.
• Planned, scheduled, and conducted the lead plant test program on USS Reagan.
• Acted as chairman of the Joint Test Group.
1992-1995 Shift Test Supervisor
• Supervised all test personnel and testing of the nuclear reactors on new construction Nimitz class aircraft carriers for the assigned shift.
• Represented the Chief Test Engineer and carried out his duties and responsibilities.
1982-1992 Shift Test Engineer, Mechanical Test Engineer
• Directed all reactor plant test operations for the assigned reactor plant and shift.
• Led the casualty response effort to place the reactor plant in a safe condition during casualties arising from the conduct of the test program.
• Established appropriate plant conditions and system status for all reactor plant work.
• Developed technical work documents performed on all reactor plant systems.
EDUCATION VALPARAISO UNIVERSITY Valparaiso IN
Bachelor of Science in Mechanical Engineering, December 1981.
QUALIFICATION
• Qualified Shift Test Engineer on Los Angeles class submarine reactor plants in 1984.
• Successfully completed maintenance qualifications every 2 years.
• Successfully completed cross-qualification to Nimitz class aircraft carrier reactor plants in 1996.
• Held DOD granted secret security clearance since May 1982.
AWARDS
• Proposed elimination of reactor plant low-temperature transient testing resulting in cost reduction of $1,000,000 over life of ship class.
• Received Timely Awards Plan (TAP) award for consistently exceeding expectations on assignment deadlines.