Post Job Free
Sign in

Management Mechanical Engineering

Location:
India
Salary:
23000 in hand
Posted:
September 15, 2014

Contact this candidate

Resume:

RACHANA DEVENDRA

NAMJOSHI Address: ***, Samarth Residency

D.O.B.: 12th October 1988 Old Gole Wada, Opp. To Hamal Wadi

Parnaka, Kalyan -421 301

AGE: 25 years

Phone: 902-***-****, 942*******

Gender: Female

E-mail ID: ***********@*****.***

Objective: To work in an Organization to increase & utilize my skills, knowledge.

Educational Qualification

Exam Passed

Board/University

Year of Passing

Remark

S.S.C.

MAHARASHTRA

MARCH 2004

78.4%

H.S.C.

MAHARASHTRA

MARCH 2006

60%

B.E.(PROD)

MUMBAI UNIVERSITY

MAY 2011

69%

M.E.(1st sem) (MECHANICAL-MANUFACTURING)

MUMBAI UNIVERSITY

Dec-2012

68%

M.E.(2nd sem)

MUMBAI UNIVERSITY

MAY-2013

75%

Note: 1) I had one year drop after first year of engineering due to my health problem.

Work Experience :

Duration Company Division Department

July-Dec 2010(in plant Siemens-kalwa Logistics-top(technical Switchboard/ED-

training ) works order processing) MVP

Computer Knowledge :

• Certified Auto Cad 2d-3d

• Sap(ERP module) functioning in MM(material management)

• Skilled in Microsoft Office (Word, Excel,PowerPoint)

• Certified Solid works

Achievements :

B.E. Project

Successfully completed following projects and works:

1) Study of Logistics and Supply Chain Management.

Switchboards are essentially “tailor made” products i.e. they have to be designed to

suit the requirements of the customer. Different industries have different requirements for

their electrical installation and machines, hence varies the current / voltage requirements.

In such situations, logistics management becomes very essential to plan, execute and

control the delicate activities related to work.

2) Development of Vendor Rating System Model.

Vendor performance is also observed. Hence for optimization of process flow in for

improving the performance of vendors, Vendor Rating System i s d e v e l o p e d

c o n s i d e r i n g t h e criteria Quality, Delivery Reliability, Documentation, Services.

Weighted Point Method is used for rating.

3) Hardware Standardization.

The idea was to summarize the hardware required in all the assemblies of the product

and prepare a standard format.

With the use of such a format the hardware list would be standardized for each of the

assemblies.

4) Implementation Of 5-S on Lean Line for Hardware Trolley.

5) Visual Planning and Management System.

M.E. Project : Inventory Optimization, in Precihole Machine Tool Pvt. Ltd., Kalyan

Paper Publications:

1) Review article: Role of Inventory Management on Cash Flow - An Overview

Published in: MULTICON-W 2014, International Conference & Workshop on

Advances in Mechanical Engineering.

2) Hardware Inventory Control By ABC Analysis – Case Study

Published in: ICEFT-14, International Conference on Eco-Friendly Technologies for

Sustainable Growth.

I hereby declare that the information given above is true to best of my knowledge.

Place: Kalyan, Maharashtra, India

(Rachana D. Namjoshi)



Contact this candidate