RACHANA DEVENDRA
NAMJOSHI Address: ***, Samarth Residency
D.O.B.: 12th October 1988 Old Gole Wada, Opp. To Hamal Wadi
Parnaka, Kalyan -421 301
AGE: 25 years
Phone: 902-***-****, 942*******
Gender: Female
E-mail ID: ***********@*****.***
Objective: To work in an Organization to increase & utilize my skills, knowledge.
Educational Qualification
Exam Passed
Board/University
Year of Passing
Remark
S.S.C.
MAHARASHTRA
MARCH 2004
78.4%
H.S.C.
MAHARASHTRA
MARCH 2006
60%
B.E.(PROD)
MUMBAI UNIVERSITY
MAY 2011
69%
M.E.(1st sem) (MECHANICAL-MANUFACTURING)
MUMBAI UNIVERSITY
Dec-2012
68%
M.E.(2nd sem)
MUMBAI UNIVERSITY
MAY-2013
75%
Note: 1) I had one year drop after first year of engineering due to my health problem.
Work Experience :
Duration Company Division Department
July-Dec 2010(in plant Siemens-kalwa Logistics-top(technical Switchboard/ED-
training ) works order processing) MVP
Computer Knowledge :
• Certified Auto Cad 2d-3d
• Sap(ERP module) functioning in MM(material management)
• Skilled in Microsoft Office (Word, Excel,PowerPoint)
• Certified Solid works
Achievements :
B.E. Project
Successfully completed following projects and works:
1) Study of Logistics and Supply Chain Management.
Switchboards are essentially “tailor made” products i.e. they have to be designed to
suit the requirements of the customer. Different industries have different requirements for
their electrical installation and machines, hence varies the current / voltage requirements.
In such situations, logistics management becomes very essential to plan, execute and
control the delicate activities related to work.
2) Development of Vendor Rating System Model.
Vendor performance is also observed. Hence for optimization of process flow in for
improving the performance of vendors, Vendor Rating System i s d e v e l o p e d
c o n s i d e r i n g t h e criteria Quality, Delivery Reliability, Documentation, Services.
Weighted Point Method is used for rating.
3) Hardware Standardization.
The idea was to summarize the hardware required in all the assemblies of the product
and prepare a standard format.
With the use of such a format the hardware list would be standardized for each of the
assemblies.
4) Implementation Of 5-S on Lean Line for Hardware Trolley.
5) Visual Planning and Management System.
M.E. Project : Inventory Optimization, in Precihole Machine Tool Pvt. Ltd., Kalyan
Paper Publications:
1) Review article: Role of Inventory Management on Cash Flow - An Overview
Published in: MULTICON-W 2014, International Conference & Workshop on
Advances in Mechanical Engineering.
2) Hardware Inventory Control By ABC Analysis – Case Study
Published in: ICEFT-14, International Conference on Eco-Friendly Technologies for
Sustainable Growth.
I hereby declare that the information given above is true to best of my knowledge.
Place: Kalyan, Maharashtra, India
(Rachana D. Namjoshi)