Post Job Free
Sign in

Engineer Quality

Location:
United States
Posted:
September 09, 2014

Contact this candidate

Resume:

Bryan Lee Trivett

**** ********** **.

Shelby, NC 28152

704-***-****

************@********.**.***

With 30 + years of experience as a Plant/Production Manager/Supervisor within

manufacturing and production of fiberglass, extrusion, specialty glass and quality

engineer in automotive. Thorough knowledge of Lean Manufacturing, 6S, ISO 9001

and 14001 implementation and auditing, windows 2010 operating systems, process

flow and mapping. The gap from 2012 to 2013 in employment I went back to college

and finished my degree in Industrial management.

Currently May 2014 - Present

Quality Engineer for Magna Interiors, LLC in Spartanburg, SC. Assigned

responsibilities of developing and analyzing quality metrics as well of launching new

automobile products, to include the F26 and F16 BMW sporty SUV models. Using

knowledge of the standards of automotive software development, safety standards,

quality and manufacturing process along with ISO14001 and automotive control

plans, production part approval process and advanced product quality planning

procedures effective analytical, problem solving and team building skills.

Responsible for identifying quality issues and implementing corrective action plans

by coordinating with quality representatives

Quality Resident Engineer May 2013 – May 2014 Noonan Group

Quality Resident Engineer for Magna Exteriors and Interiors on site at BMW in

Greenville, SC. Liaison between BMW and Magna on the assembly line helping to

control the quality of parts that are produced at MEI. Relaying real time information

back to MEI over all issues with parts so that adjustments can be made as needed to

maintain top quality for all headliners, pillars, IP and all other parts supplied by MEI

to BMW Plant 10.

Production Supervisor August 2011 – October 2012 Cooley Group, LLC

Production Supervisor over two extrusion lines and the packaging of produced

materials.. Guided and mentored the seventeen hourly associated that produced,

packaged and shipped the billboard, roofing, automotive insulation, pond liner and

tent material. Given the task of writing the Basic Job Analysis and Work Instructions

for each of the production positions within Cooley at the Lancaster Plant.

Interviewed and hired a complete crew for D shift, as the plant was ramping up to 4

crews, 12 hour shifts, 7 days a week. Implemented the use of Fastenal vending

machines for operating supplies and daily use items to aid in the cost reduction of

operating supplies and help control the budget. Worked through the process of

assisting Cooley to become ISO 9001 certified and in the process trained and

complete the requirements to become certified as an ISO 9001 auditor.

Plant Manager May 2008 – July 2011 Industrial Glass Technologies

Managed the employees, production and efficiency, to ensure the plant was running

smoothly, quickly, efficiently and safely, while producing specialty glass for the

medical field, entertainment, electronic and housing industries. General supervision

of all phases of plant operations including: production, quality control, maintenance,

receiving, and shipping. Responsibilities also include recruiting, hiring and training

personnel and facility/physical plant up-keep and capital improvements. Worked

closely with the production team to increase productivity and profitability.

Senior Engineer Technician February 1978 – May 2008 (retired) PPG, Industries

PPG Industries, Started at the bottom as a Forming Operator in Feb. 1978. Transferred

to Batch Control Technician operating the computer system for the mixing the raw

materials for the furnaces. Took a military leave of absence from 1982 – 1986 joined

the US Army, upon returning took the assessment center to become a Group Leader

in the Forming Department over 8 small fiberglass furnaces and 48 employees. In

1988 was promoted to Salary and assigned to two Double Level furnaces supervising

120 plus employees. In 1990, Moved to the position of the Single Level Production

Technician in charge of all aspects of the production from the furnace to the

customer. 1991 promoted Senior Production Engineer Technician of the Dry and Wet

Chop Product lines. Managed the process, quality, equipment, and scheduling of

product changes and maintenance. Maintained quality assurance checks and

certifications for fiberglass in the shingle and extrusion market. Controlling the cost

of raw materials, production and shipping of all finished goods to the customer. Over

the next 15 years assisted in the building, rebuilding, start-up of fiberglass plants and

furnaces in the US and worldwide.



Contact this candidate