Post Job Free
Sign in

Engineer Engineering

Location:
Honolulu, HI
Posted:
September 10, 2014

Contact this candidate

Resume:

Reynaldo S. Dumlao

E mail: *********@*****.***

*** ***** *****, ******, ** 96734

Telephone Nos. : 916-***-****

: 808-***-****

CAREER PROFILE

Over twenty (20) years of competitive experienced in the Telecommunication Industry specifically

in the field of Switching, Transmission and Outside Plant Engineering.

Planning, Engineering and Design of SPC toll exchanges including cost analysis, commissioning

and acceptance.

Planning, design and engineering of distribution and feeder networks, including cost analysis and

deployment strategies

Excellent organizational and interpersonal skills, readily accepts responsibility and works well with

all levels of organization.

Computer literate. (MS Word, MS Excel, Powerpoint, Autocad, Visio and Microstation)

PROFESSIONAL EXPERIENCE

Henkels and McCoy Inc. – March 19, 2012 to April 20, 2012

Outside Plant Engineer

Design and Engineer of UH BTOP Project. The Project requires provision of Fiber Optic cable to

Hawaii’s Public School and Public Library for Broadband Technology Opportunity Project

(BTOP).,

AFL Network Services Inc. – February 1, 2010 to Present

Outside Plant Engineer

Design and Engineer of Fiber to the Cell Site (FTTCS), Fiber to the Node (FTTN) F2 Conditioning

BAU and JPA Projects of AT&T at San Ramon and San Jose, California. Pre post the propose

design using the ARES Microstation, O CALC and prepare the computerized Wordprint for

construction drawings under the Lightspeed Projects of AT&T.

Prepare the Permit Drawings and Traffic Control Plans for the encroachment from the proposed

VRAD location to SAI and power feed location using Autocad software.

1

Engineering Plans for distribution cable extension, cable replacement and building entrance cable

facilities under the Business As Usual Group (BAU).

AFL Network Services Inc. – October 13, 2008 to May 29, 2009

Outside Plant Engineer

Design and Engineer of F2 Conditioning to remove bridge tap and multiples at F2 distribution

cables on various DA’s using BSTCAD software at Louisiana, USA for the Fiber to the

Node(FTTN) Project of AT&T,

Prepare the engineering plans for distribution cable extension, cable replacement and building

entrance cable facilities under the Business As Usual Group (BAU).

Northstar Communications Group – November 7, 2005 to May 16, 2008

Outside Plant Engineer

Design and Pre post Cable Plan of Fiber to the Node(FTTN) Project of AT&T using ARES

Microstation and prepare the computerized Wordprint for construction drawings under the

Lightspeed Project of AT&T California. Conduct surveys and analysis to select the most

appropriate location of the Video Ready Access Device(VRAD), Issue the conduit plan in Autocad

for securing right of way and city permit, calculate the cost of the project for budget allocation.

Issue the detailed F2 conditioning plan to removed the bridge tap and multiples on the F2

distributiion cable.

Prepare the engineering plans for distribution cable extension, cable replacement and building

entrance cable facilities under the Business As Usual Group (BAU).

PeaceSat Hawaii – May 13, 2002 to September 13, 2002

Volunteer Work

Assist in the operation and maintenance of Video Conference system for the Pan Pacific

Education and Communication Experiments by Satellite.

Philippine Long Distance Telephone Company – February 14, 1981 to July 15, 2001.

Network Engineer – Toll Network Engineering

2

Responsible for the Planning and Engineering of SPC Toll Switching and Transmission projects at

various at Metro Manila and Provincial exchanges under the PLDT ZBP projects.

Monitor the installation of Toll Switching Engineering Project to ensure conformity with the

Engineering plans and specifications.

Compute trunk requirements for network dimensioning and design network configuration based

on approved technology guidelines and Standard Engineering Practices.

Heads the acceptance committee in the performance of acceptance test and inspection of newly

installed Switching and transmission facilities.

Issue modification orders for the provision of additional Inter toll trunk requirements between toll

switching exchanges and other Telecom carriers that are interconnected to PLDT base on the

traffic study recommendation to maintain satisfactory service.

Heads the acceptance committee in the performance of acceptance test and inspection of newly

installed transmission facilities

Performed other related and non related Engineering works that may assigned from time to time

(i.e. documentations, technical reports and evaluations, budget data sheets and drafting of the

necessary floor plans and equipment layouts, transmission routing scheme and schematic

diagram).

Republic Telephone Company – June 11, 1981 – February 14, 1980

Engineering Assistant – Outside Plant Engineering Division

Prepared the Detailed Engineering plans of Outside Plant Engineering projects (aerial and

underground) for feeder and distribution cable at various and provincial exchanges. Conduct

feasibility studies regarding the provision of additional cable facilities, conduct site surveys and

inspection, issue work orders and budget data calculation and coordinate with concerned group

to properly implement the project. Monitors the installation of Outside Plant Project in conformity

with the Engineering plans and specifications and participate in the conduct of acceptance test.

EDUCATION

BS Electrical Engineering – National University, Manila, Philippines, March 1979

TRAINING AND SEMINARS ATTENDED

1. JAM OSP for Engineering and Aotl 3.0, AT&T Training, October 8 12, 2007.

2. ARES/PLR Design and Workprint and Aotl, AT&T Training, May 8 25, 2007 .

3. Synchronization Equipment Planning and Engineering, Oscilloquartz S.A., Neutchatel,

Switzerland, September 25, 2000 to October 6, 2000.

4. DIGILOOP Planning and Engineering, ECI Orlando, Florida, November 20, 1995 – December

1, 1995.

5. Asynchronous Transfer Mode (ATM), PLDT, March 13 17, 20

3

6. Transmission Technology, PLDT, June 7 9, 1999.

7. SDH System Description Operation and Maintenance, PLDT, May 10 18, 1999.

8. Fundamentals of Data Communication, PLDT, April 12 14, 1999.

9. ISDN Basic Engineering Course, PLDT, June 8 12, 1998.

10. EWSD POWER (GR 40) Operation and Maintenance, PLDT, March 9 13, 1998.

11. EWSD POWER ( GR 12 ) Operation and Maintenance, PLDT, February 23 28, 1998.

12. Telecommunication Signaling System, PLDT, November 3 7, 1997.

13. CCS#7 Signaling System, PLDT, June 30, 1997 – July 4, 1997.

14. Telephone Traffic Engineering, PLDT, May 27 30, 1997.

15. NEAX61 INTS Engineering and Planning, NEC, February 17 28, 1997.

16. Microsoft Office, Informatics Computer Institute, September 23 27, 1996.

17. Telecommunication Technology Update, PLDT, August 7 8, 1996.

18. Seminar on Administrative Policies and Procedures for Supervisors, PLDT, July 30, 1996 –

August 2, 1996.

19. EWSD System Survey, PLDT, July 25 26, 1996.

20. Primary Reference Clock O & M, PLDT, July 15 16, 1996.

21. Supervisory Training Course, PLDT, June 3 7, 1996.

22. Upgrade Training for PROFI V.8 TO V.9, ETSI Siemens, May 7 13, 1996.

23. EMS 1 Selector and EMS 1 Test Distributor, ITEC, August 28, 1987.

24. Outside Plant Engineering Course, Telectronics Systems, Inc. April 3 – May 9, 1980.

25. COBOL Programming, March April, 1980.

PERSONAL DATA

Born 02/15/57, married, 1 child, excellent health and willing to relocate.

4



Contact this candidate