S WATI DESAI
Memphis, TN **119
*****.*****.*@*****.***
EXPERIENCE
L ogistics Engineer M ay 2012 – Present
V ersant Supply Chain, Memphis, TN
I mplementation and Certification of ISO 9001:2008 Standards – Project Manager
•
I SO 9001:2008 Lead Auditor Certified
•
K aizen activities and time studies to increase productivity
•
D rawing facility layouts to increase work flow
•
N ew customer implementations/Operations Manager
•
C ontract Engineer J an 2012 – Feb 2012
V alley Tool: Contract to BorgWarner, Water Valley, MS
E xpand on Macros created to include current and future production lines
•
A ssistant Production Planner Co-op J une 2011 – Dec 2011
B orgWarner Drivetrain Systems, Water Valley, MS
A ssist in design of Supermarket Layout
•
C onduct daily inventory counts to insure inventory accuracy
•
I mplemented Kanbans and tugger route improvement strategies
•
C reated Macros for Quality engineering department to identify and obtain reject parts
•
R educed time to analyze data from 8 hours to 30 minutes for Production Engineers by creating
•
Macros to analyze data
M anufacturing Engineer Co-op J an 2011 – May 2011
P arker Hannifin Fluid and Control Division, Jackson, MS
D evelop, evaluate, and improve manufacturing methods
•
A ssist in lean cell design and related duties
•
A ssist with design and construction of new tools and equipment
•
I dentify and address safety concerns
•
C onduct time studies
•
P erform basic mechanical design
•
EDUCATION
M ississippi State University 2 007 – 2012
B achelors of Science in Industrial & Systems Engineering
•
RELATIVE SKILLS AND ABILITIES
M icrosoft: Word, PowerPoint, Excel, Access, OneNote, Publisher, Outlook, VBA
AutoCAD, AutoDesk Inventor, Lotus, Minitab, Flexsim, Red Prairie WMS
Language: English, Gujarati, Hindi, Spanish
R EFERENCE – A vailable upon request