Lucius George
Intelligent Transportation System Specialist/Inspector
321-***-**** / *********@*****.*** / Orlando, Florida 32822
SUMMARY OF QUALIFICATIONS
Mr. George has over 5-year record of success overseeing all phases of traffic signal and ITS projects for
government and private-sector clients. Mr. George experience includes managing crews of up to 5 in highway
improvements, DMS Installations and Maintenance, CCTV Installations and Configurations, Rugged Com L2
switches, Naztec Signal Controller, Peek LMD Signal Controller, UPS system installation and a variety of
other traffic signal projects. Mr. George backed by strong credentials and a proven history of on- time, on-
budget and high-quality project completions.
PROFESSIONAL EXPERIENCE
Atkins/PBS&J 09/2010 – 08/2014
482 South Keller Road, Orlando FL
Infrasource Underground Construction Services, Inc. /Transtech Electric 09/2008 – 09/2010
312 West 1st Street # 203 Sanford, FL
Florida Industrial Electric 04/2006 – 09/2008
1050 Miller Drive Altamonte Springs, FL
Traffic Control Devices Inc. 03/2005 – 03/2006
242 North Westmonte Drive Altamonte Springs, FL
EDUCATION
Diploma 1999
St. Croix Complex High School
Strayer University Present
CERTIFICATIONS
• Advanced Maintenance of Traffic, 2012
• Aerial Lift Safety Certification
• Confined Spaces Safety
• Trenching & Shoring Certification
• Certified Aerial Boom Truck Operator and First aid1CPR
KEY SKILLS
• •
Electrical Maintenance Service and Construction safety enforcement/ Equipment
Repair of Traffic Signals Operator
• Installation of Electrical lighting/Wiring of
• Infrastructure Improvement Projects
signal systems
• Environmental Remediation Projects
• Budgeting and Cost Controls
• CCTV Installation
• Installation of overhead and underground cables
• Site Safety/OSHA Compliance
• Subcontractor/Crew Supervision
Page 1 of 3
Lucius George
Intelligent Transportation System (ITS)
• Inspection/Installation of Fiber Optic Cable
• Data Entry, Computer related service
PROJECT EXPERIENCE
FDOT District Seven, Hillsborough County, Robert Swain, 813-***-****, 1/10/2010 to 12/15/2012.
This project includes the design and deployment of new Naztec Nema Type II traffic signal cabinets with
ATMS. Now software, UPS, ITS components, Sensys traffic counting and monitor systems. The work
consists of a fiber-optic communications network, infrastructure upgrades, and ITS devices installed
along SR 60, Bloomingdale Blvd., Waters Ave., Linebaugh Ave, Sheldon Rd., Bearss Ave., Fletcher Ave., US
301, Providence Blvd and others. The overall system will tie into the existing Hillsborough County traffic
management center (TMC). Responsibilities include overseeing day to day construction activities, working
with multiple crews on multiple corridors, enforcing MOT, OSHA and safety requirements, observing and
documenting work habits and enforcing the contract, plans, FDOT Specifications and Standard Index.
Other responsibilities include acting as liaison for the County with the public, enforcing permit compliance
and data collection such as but not limited to; controller cabinet inspection, grounding as-built logs, Sensys
repeater and access point collection logs as well as compiling issue logs and completing daily work reports
for the County that include all pertinent construction information.
FDOT District One, Lee County, Michael R. Ryan, 239-***-****, 04/2010 to 09/2011.
This project includes the design-build incident management system (IMS) for the Edison and Caloosahatchee
bridges in Lee County, which will provide detour information for motorists on US 41/Business 41. Proper
installation of all communications and field devices, and the system’s integration into Lee County’s signal
operations center and emergency operations center, will be necessary to allow the IMS to be properly managed.
Full installation of the system will include approximately 16 HAR stations, nine DMS, 37 dynamic trailblazers,
nine CCTV cameras, 17 vehicle detection stations, road weather information stations (RWIS), and fiber and
wireless communications.
FDOT District One, Sarasota County, Michael Jordan, 941-***-****, 09/2009 to 10/2012.
As system Manager for this countywide advanced traffic management system (ATMS) project, Atkins provided
CEI services for the deployment of 68 miles of fiber optic cable, eight network hubs, upgrading 123 intersections
from PEEK to Naztec equipment, and adding 70 CCTV cameras.
FDOT District One, Sarasota County, Robbin L. Levar, PM, 941-***-****, 03/2011 to 08/2012.
This Phase II of a 3 phase project provides cabinet and controller upgrades at 31 intersections along seven
corridors and crossing multiple jurisdictional maintaining agencies. Mr. George is serving as a ITS Inspector &
system integration aid with responsibilities including cabinet inspection, coordination of preemption system and
lighted street signs. Mr. George has also been responsible for timing programming updates in the Naztec
controllers.
City of Chattanooga, Chattanooga Regional Intelligent Transportation System Phase I Equipment
Installation Construction Engineering and Inspection Services, Chattanooga, TN. The Chattanooga
traffic signal Phase I upgrade project is part of the planned regional ITS enhancements that cover
Chattanooga, other municipalities in Hamilton County, and unincorporated Hamilton County. This
regional plan was inspired by the dramatic growth of Chattanooga’s metropolitan area. This project
includes wireless vehicle detection and wireless modems to access the City’s network. Phase I is the first
project in Tennessee to initiate an adaptive traffic control system. Along Highway 153, the City is
Page 2 of 3
Lucius George
Intelligent Transportation System (ITS)
installing devices and software to provide real-time solutions that will more effectively and efficiently
manage traffic along this corridor. Atkins provides the City with ITS construction management and
inspection, and is responsible for providing in-depth construction inspection, overseeing testing and
configuration of all system components, providing technical oversight, and ensuring that the contractor
delivered all requirements of Phase I. Atkins is also responsible for all CMAQ and TDOT
documentation requirements. Employee Role: As CEI, Mr. George gathers information from numerous
existing signalized intersections to upgrade equipment. Reference: John Van Winkle, 423-***-****
Pinellas County, East Bay Drive Advanced Traffic Management System Construction Engineering
and Inspection Services, Largo, FL. Phase 1 Countywide ATMS/ITS Installation – SR 686 from Gulf
Blvd (CR699) to Airport Parkway. Employee Role: As senior Inspector, Mr. George is responsible for
work that consists of installation of ITS/ATMS devices along SR 686 including Closed Circuit
Television (CCTV) camera assemblies, dynamic message signs (DMS) assemblies, advance vehicle
detection, video detection, fiber optic cables, cabinets, conduit, pull boxes, and all other equipment for a
fully functional ITS/ATMS implementation. Project dates: 3/2013-3/2014. Reference: Tyson Evatz,
FDOT District Seven I-75/SR 93A from MANATEE/HILLSBOROUGH CO/L TO
PROGESS/BLOOMINGDALE 0756 ITS FREEWAY MANAGEMENT, Mr. George is the
responsible for following: CCTV field elements, MVDS field elements, Electrical and ITS conduit and
pull boxes, Electrical power service for ITS field elements, Lightning protection systems, including
grounding systems and surge protective devices, ITS FOC communication infrastructure, ITS Ethernet
network and network devices, Wireless communication infrastructure and wireless Ethernet network,
ITS integration services, ITS testing services, Grounding. Project dates: 4/2014-7/2014. Reference:
James White 239-***-****.
Page 3 of 3