Post Job Free
Sign in

Manager Project

Location:
Bowie, MD
Salary:
150000
Posted:
September 02, 2014

Contact this candidate

Resume:

[pic] Lang Maith

Address: Upper Marlboro, MD ****4 * Phone: 301-***-**** * E-Mail:

****.*****@*********.***

DoD Security Clearance Level: Preferred

Areas to Work:

. Active DoD Top Secret/SSBI Clearance MD, DC,

Northern VA or Remote

. Active Dept. of State EOD

Preferred Work

Status:

I.T. Certifications & Training: Corp.-to-

corp. or 1099 (fully insured)

. VMware Certified Professional 5.5 - VCP (in-process)

. NetApp Clustered Data ONTAP 8.2 Administration Hourly

Rate:

Currently $90/hr. C2C

(negotiable)

Work Authorization:

. U.S. Citizen Availability to

Start:

2 weeks after an

offer

Preferred Method of Contact:

. Via e-mail at: ****.*****@*********.***

Education:

Univ. of MD

University College

- Major: Business

Administration

Employment History:

[pic] Dept. of State (DoS) (3-Month Assignment plus extensions)

NetApp Storage Administrator / Level 4 Architect

January 2014 - Present

. In charge of all NetApp Storage Enterprise operations supporting the

DTS-PO Project at SA-43 & APS.

. Racked, Installed and Configured the FAS3270s and FAS2240s into

Production for enterprise use.

. Totally redesigned the NetApp Storage Infrastructure from the ground

up. (literally a complete overhaul)

. Wrote very high-level technical documentation for Government VPs in

addition to created detailed Visio diagram workflows and Data Center

Rack Elevations.

. Worked heavily in setting up the new Datastore Environments for the

new VMware (VI) efforts.

. Utilized countless math calculations, formulas and storage calculators

for creation of the right arrays.

. Performed FAS Controller upgrades from 7-Mode to CDOT 8.2. (versions

8.0.x and 8.1.x to 8.2.1)

. Created a standardized uniformity by upgrading all DS4243 SATA disk

shelves to the same firmware.

. Based on IOPs estimations I was able to strategically offload heavy

DTS-PO workloads onto the new controllers through successfully planned

Aggregate creations and spindle performance counts.

. Cured problematic customer latency complaints by creating new and

improved SQL 2012, Oracle, Citrix, VMware and Exchange Aggregates,

LUNs and Volumes.

. Prepared all SAN backend configurations for our VMware environment.

. Designed Backup and COOP environment utilizing SnapManager, Snapshots

and Snap Vault.

. Was able to move data on the fly internally using NDMPCOPY and

SnapMirror functionalities.

. Configured iGroups (iSCSI Initiator Groups) for both our VMware and

physical server environments.

. Made expandable Volumes via Thin Provisioning for VMware and thick

provisioned Volumes for our Oracle and SQL 2012 databases.

. Performed data migrations from SATA to both SAS and FLASH storage for

faster IOP performance.

. Monitor NetApp network health and activity via SolarWinds Storage

Manager and NetApp DFM.

. Provided shared drives to network users via NetApp's CIFS and NFS

protocols.

. Assisted in the Pure Storage design planning for our VMware upgrade

from Version 4.1 to 5.5.

. Cured problematic latency and slow performance issues reported by the

customer.

. Heavy VMware and NetApp reading and implementation of all industry

"Best Practices".

. Utilized deduplication for faster data backups and faster data

restorations when needed.

. Ensured data uptime using RAID-DP (fault tolerance) +2 configurations.

. Set-up new redundant environments by making our (2) 3270s and (2)

2240s run as HA Pairs.

Technologies: Remedy ARS, VMware 4.1, VMware 5.5, vCenter 5.5, ESXi Hosts,

NetApp Storage, 7-Mode, CDOT 8.2, SAS, iSCSI, RAID-DP, Fibre Channel, LUNs,

Aggregates, HA (High Availability), DRS, vMotion, Storage vMotion, SAN,

NAS, NFS, CIFS, Multistore, SnapManager, SnapMirror, SnapProtect, SnapLock,

SnapVault, SnapRestore, OnCommand System Manager 3.1, Data Fabric Manager

(DFM), VMFS-5, 7-MTT, DataStores, Windows 7 Enterprise, Windows Server

2003, Windows Server 2008 R2, Microsoft Office Professional, Active

Directory, DNS, SQL Server 2008, SQL Server 2012, Oracle 11 and SolarWinds.

[pic] D.C. Metropolitan Police Dept. (MPD)

Sr. Data Center Engineer & COOP Administrator

February 2013 - June 2014

. Lead Point-of-Contact for the CIO and the OIG for technical matters

involving the MPD's COOP/DR.

. In charge of all of MPD's data backups citywide for all 5 Data

Centers.

. Served as the Lead Backup Exec 12 Administrator for MPD using our Dell

Storage Pools.

. Created MPD's new Data Backup Standard of Procedures (SOP)

. Heavy use of SAN and NAS technologies for storage. (police

surveillance, interrogation videos, closed circuit camera feeds, end-

user home directories, VM Datastores, etc.)

. Configured the NetApp storage components and backend configurations

for the new Cisco FlexPod.

. Had to develop optimization standards for the NetApp storage in

support of Test and Production.

. Made specialized LUNs, Aggregates and Volumes within the Cisco FlexPod

to support not only VMware, Sharepoint, Exchange, Oracle and SQL.

(databases and applications)

. Designed Visio diagrams and Data Center Rack Elevations.

. Used NetApp OnCommand (GUI) and Putty (CLI) for day-to-day NetApp

Administration.

. Ensured mission critical data stored on the NetApps were in an HA Pair

configuration.

. Used NDMPDCOPY for "real-time" data transfers and SnapMirror for

repository copies.

. Maintained MPD's physical and virtual citywide Data Center inventory.

. Utilized SnapShots for backups and used SnapVault for data archives.

. Ensured the FAS2240s were up-to-date with all updates and firmware as

well as the storage shelves.

. Monitor system performance and troubleshoot failed peripherals

citywide using SolarWinds.

. Virtualized and re-designed most of the Data Center through use of

vCenter, ESXi hosts and P2V.

. Served as the Sr. VMware Administrator for the Data Center handling

all aspects of virtualization.

. Converted older servers and workstations into VMs via P2V using

vConverter.

. Simplified the network environment by departmentalizing VM Servers to

specific ESXi hosts.

. Used vSphere 5.5 to access vCenter 5.5 which was a GUI overview of the

entire network's VMs and ESXi Hosts.

. Able to maintain vital Data Storage uptime in case of an emergency

using Storage vMotion.

. Performed data gathering, fact finding, technical recommendations and

submit vendor quotes.

. In charge of MPD Headquarter and UCC hosted servers for Monthly

Microsoft Patching.

. Responsible for creating numerous new Standard of Procedures (SOP) for

MPD to adopt and enforce.

. Serve as the Lead WSUS/SCCM Administrator in charge of all Microsoft

server-related patch pushes.

. Developed official SCCM SOP (Standard of Procedures) for citywide

patch operations. (HQ, NOC, etc.)

. Designated as the SCCM point-of-contact for designing, testing and

implementing upgrades into Prod.

. Key point-of-contact in the environmental replacement of MPD's iLEADs

application over to Mark43.

. Successfully provided both remote & onsite technical support.

. Configured Storage Pools using Dell Compellents for on-site

Dev/Testing Environment server storage.

. Performed data backups (Full & Deduplication) on a daily cycle along

with restorations when needed.

. Granted authorization for handling budget issues, purchase

requirements and vendor relations.

. Implemented iDRACs on our Dell servers for remote management.

. Assisted with the creation of new MPD citywide Print Queues for each

district.

. Manage user accounts and permissions.

. Create and maintain documentation and diagrams on network

infrastructure, hosting infrastructure and backup and network

monitoring.

. Successfully performed application migrations from one server to

another or performed upgrades of the current application version

without disruption to daily operations.

. Worked independently as well as effectively with the Net-OPS Team.

. Support various teams (Application, Database and MPD End-Users) by

providing hardware/software support at the operating system,

application and network levels.

. Actively participated in the one week on-call rotation.

Technologies: NetApp, VMware, vSphere 4, vSphere 5.5, ESXi Server, VMware

Workstation, vMotion, Storage vMotion, Data ONTAP 8, Hyper-V, Project

Server, Sharepoint 2010, Windows Vista Professional, Windows 7

Professional, Windows Server 2003, Server 2008 and Server 2012, Exchange

Server 2007 and 2010, Microsoft Office Professional, Active Directory, SQL

Server 2008, McAfee ePO, Cisco FlexPod, Remedy ARS, LPR, FilesOnQ, WALES,

iLEADS, Shot Spotter, AFIS, WINS, DNS, DHCP, Print Servers, WSUS and SCCM

Administrator Console.

[pic] Dept. of Homeland Security (DHS)

Sr. Systems Engineer & Implementation Manager

February 2011- November 2013

. Serves as the Implementation Manager on many DHS enterprise-wide

solutions both in physical and VMware virtual environments which

effects 20,000+ users.

. Through Hyper-V (10%) and VMware (90%) we were able to create a

recyclable virtual Test Lab Environment running on Windows Server

2008.

. In charge of all of DHS HQ, HOC and NOC Microsoft Monthly Patching.

. Served as the Lead SCCM Administrator in charge of patching and

patching notifications to the DHS as a whole but specifically the GWO

and NOC for maintenance window progress.

. Assisted in the development of the new DHS SCCM SOP (Standard of

Procedures).

. Designated as the SCCM point-of-contact for designing, testing and

implementing upgrades into Prod.

. Created VMware machines for validation and testing purposes using

vSphere.

. Through VMware templates we were able to create and validate POAM and

FDCC for Windows 7.

. Member of DHS's OCIO Surge Team. (government essential personnel)

. Member of the DHS's Disaster Recovery/COOP Team in case of emergency.

. Nightwatch Manager at the HOC for DHS Engineering Team.

. Migrated Windows Server 2003 Domain Controllers to Windows Server 2008

R2 Domain Controllers.

. Performed various application migrations critical to enterprise

Operations & Maintenance.

. Prepare and submit official government endorsed reports requesting

upgrades, changes, fixes etc. in the form of Change Requests,

Emergency Change Requests, Break/Fix and Implementation Plans.

. Operate as the Technical Liason for after hour issues that may impact

GWO or the HOC operations.

. Submit Weekly Status Reports of progress and currently pending issues.

. Has headed up multiple I.T. Pilot Programs which turned into

successful enterprise wide implementations.

. Utilize Project Server 2010 to stay on track with projects, milestones

and deliverable schedules.

. Provide rotational weekly 24/7 coverage for all Operations &

Management technical issues remotely.

. Attend Weekly Conference Calls (RAC & ICCB) for government

presentation and approval of new technologies or current network

modifications.

. Serving as the Technical Lead for DHS' new Blackberry I.T. Policy

Changes.

. Upgraded Windows Domain Controllers from Server 2003 to Server 2008.

. Document step-by-step the baseline build and upgrade process as

technical documentation.

. Upload, check-in and check-out documents in Sharepoint for enterprise

sharing and revisions.

. Built and configured Project Server 2010 to stay aware of all assigned

projects.

. Manage user accounts and maintain mail flow on the DHS Exchange 2007

and 2010 Servers.

. Observe real-time DHS network enterprise health from servers to

routers using What's Up Gold.

. Determine DHS handheld, PDA and Blackberry health using Zenprise.

. Build, re-image and configure Dell servers with various OS versions

for various DHS site locations.

. Made the Symantec E-Vault Admin for backing up and restoring all

archived e-mails.

. Perform a wide variety of Server Remediations in conjunction to

security scan findings found by PVG (Patch Vulnerability Group).

. Has become the key point-of-contact for many vendors for software and

hardware related issues.

. Involved with off-site Power Outages which includes bringing servers

both down and up properly.

. Appointed the Oratio/Blackberry Technical Lead for handicap and

hearing impaired gov't workers.

. Back-up network data and schedule instances via Netback-up.

. Created Test Cases and formulated a Pilot Test Group to try new policy

changes on and capture feedback and suggestions before rolling the

policies into DHS Production.

. Assigned to the Smart Card Read Pilot Team for Blackberry to integrate

usage only with CAC Cards.

. Join and decommission servers from the network as needed.

. Perform OS Service Pack upgrades which require updates and validation

of our Dell server HALs, BIOS, DRAC, NICs and video card firmware,

etc. before performing the upgrade officially.

. Address and resolve all technical issues assigned in my Remedy ARS

queue.

. 1 of 2 direct point-of-contacts for WinMagic keys and licenses for DHS

operating system encryptions.

. Able to rack and re-rack servers and control them via KVM.

. Performs hands-on system monitoring, troubleshooting, administration

and maintenance.

. Generated product/cost comparisons to find the most advantageous and

cost effective solutions for our client to improve their current I.T.

environment.

. Knowledge of the U.S. Department of Homeland Security (DHS) Enterprise

Architecture standards.

. Knowledge of the DHS Systems Engineering Life Cycle methodology.

. Familiarity with the complexities of working with the DHS Data

Centers.

. Virtualization saved the client thousands of dollars from having to

buy all new hardware for testing.

. Work independently with minimal supervision.

. Verbally and physically interact with clients and users to maintain

good working relations.

. Successfully meets scheduled deliverables, milestones and ensure

proposed project deadlines.

. Very capable of being a team player.

. Known for working independently and efficiently.

Technologies: EMC SAN, VMware, Hyper-V, Project Server, Sharepoint 2010,

Windows Vista Professional, Windows 7 Professional, Windows Server 2003 and

2008, Exchange Server 2007 and 2010, Microsoft Office Professional, Active

Directory, SQL Server 2008, McAfee ePO, Remedy ARS, Mobile Handhelds

(Blackberry, Android and iPad), EVault, Zenprise, WSUS, SCCM.

[pic] BMC Software

Sr. VMware & ARS Remedy ARS Engineer (4-Month Assignment

- C2C)

May 2013 - August 2013

. Served as the Development Project Manager on behalf of BMC to DHS and

CSC.

. Assigned to work directly with the DHS Cloud Services Team on all DC1

projects.

. Staged an all new Remedy ARS Environment for the HSDN Network

Environment inside DHS's (Dept. of Homeland Security's) DC1

environment in Stennis, MS.

. Did the Provisioning for the new DSA.DHS Remedy ARS environment using

Remedy ARS version 8.1.

. Configured all host files, config files, ATRIUM SSO settings and more

to create cross communications between the Remedy ARS Application

Server, Mid-Tier and Database Servers.

. Installed vital Remedy ARS services such as Tomcat and other necessary

add-ons.

. Restored SQL databases (.bak files) for Remedy ARS Database Server

testing.

. STIG'd and hardened all Microsoft 2008 R2 VM Servers to meet all

government security standards.

. Acted as the Technical Lead and liason between BMC and the DHS Federal

Government VIPs.

. Upgraded/migrated the Remedy ARS application version 7.6 to 8.1 in a

Test Environment.

. Stood up bridge conference calls with BMC, DHS and CSC to discuss and

resolve all technical issues.

. Write vital "As-Built" documentation for the DHS Data Center

Administrators and the Security Groups.

. Performed System Validation Testing after the new environment passed

DHS Security Audits.

. Although hired by BMC I was also asked to remotely assist Dell's

Wintel Team in the Stennis Data Center too to handle their Systems

Administration issues as well,

. Utilized BMC's vCenter 5 environment to maintain and operate their

Federal Gov't client's servers.

. Worked and communicated very well with others.

. Very capable of working independently considering I worked remotely

95% of the time.

Technologies: Remedy ARS, ITSM Suite, NAS, SAN, WebEx, VMware, vCenter,

vSphere 4, vSphere 5, ESX Server, VMware Workstation 9, vMotion, Windows 7

Professional, Windows Server 2008 R2 and Server 2012, Exchange Server 2010,

Microsoft Office Professional, Active Directory and Microsoft Lynk.

[pic] Dept. of State (DOS)

SME for FMIS Configuration/Security Specialist

November 2010 - February 2011

. Used VMware nodes to test application functionality on various OS

platforms.

. Served as the designated FMIS Configuration/Security Specialist on the

Dept. of State's ILMS Project.

. Utilize Project Server to stay on track with projects, milestones and

deliverable schedules.

. Provide expertise and direct management of data in all phases of the

Software Development Life Cycle.

. Kept all stakeholders and Government Subcommittees informed of

progress against Service Level Agreements, Milestone Schedules and

proposed Deadlines.

. Designed concept and developmental enhancements that would impact the

Foreign Embassies and Business Units Asset Management for over 28

countries. (Vehicle Fleet Management)

. Sanitized the Oracle/Peoplesoft vehicle database through data

normalization and logic mappings.

. Asked to conduct Peer Reviews of other team member's work to ensure

accuracy to client specs.

. Created test scripts for use in the TESTP environment before making

official changes in Production.

. Utilized Sharepoint extensively for the uploading and retention of all

formal documents, scripts, etc..

. Participate in various internal or client initiatives and may also

serve as a Workflow Coordinator to arrange for work completion during

peak processing activities.

. Establish knowledge of relevant processes and related systems to

effectively perform responsibilities.

. Assist team members in the identifying, assessing and resolving

complex issues and problems.

. Resolve non-standard/standard issues/problems largely on my own

independent initiative.

. Perform data entry and research in various systems and tracking tools.

. Apply procedures to ensure accuracy of output and adopts continuous

improvement approach.

. Monitor and maintain requests via request tracking system and ensures

requests are completed in a timely manner.

. Establish Disaster Recovery/COOP measures.

. Offer cost effective solutions or revisions that would control budget

expenditures.

. Worked with external vendors, site personnel, shared services teams,

etc. to complete work.

. Works both independently and with the team.

Technologies: VMware, WSUS, Oracle 10g/11i, EMC SAN, Project Server,

Sharepoint 2010, Windows Vista Professional, Windows Server 2003 and 2008,

Exchange Server 2007, Microsoft Office Professional, Active Directory, SQL

Server 2005 and 2008 and Symantec Anti-Virus.

[pic] Transportation Security Administration (TSA)

Infrastructure Architect/Test Engineer

August 2006 - November 2010

. Asked to serve as the Technical Lead on numerous Engineering and

COTS/GOTS projects for TSA.

. Designated as the Altiris point-of-contact for OS deployments and

software distributions.

. Has tested over 400 COTS/GOTS applications via Sanity, Regression and

Exploratory Testing.

. Utilized Altiris to push PC/Workstation images via MAC Address

throughout the network via PXE.

. Pushed packaged applications in the TSA environment via Altiris.

. Tracked network PC asset management using Altiris Asset Management

Suite.

. Able to replicate physical testing through virtual testing via VMware.

(our SAN stored the images.)

. Used VMware workstation templates heavily to test various government

applications on a number of Windows XP and Window 7 images that would

impact 40,000+ users at government agencies and airports.

. Used vSphere 4.0 as the configuration tool for creating new templates

from the VMware Server

. Assisted in the implementation of getting all nodes up to FDCC and

POAM compliance ready.

. Manage all users, computers, servers and peripherals via Windows

Server 2003 Active Directory, Group Policy OUs, Symantec Anti-Virus

Agents and Altiris Agents.

. Tested a variety of applications designed from an array of program

languages such as: VB,,NET, .ASP, Java, Javascript, HTML, XML,

Python, Perl, Basic, COBOL, Visual Basic and more.

. Made a key member of the "End User Test Team" to create the official

Test Cases used for integration scenarios, client/server OS images,

and application testing.

. Only Test Engineer assigned to be in charge of the Transportation

Security Administration's vital TRX, TRM and ORM application for

testing and certification covering all U.S. airport locations.

. Produce all formal test result documentation for TSA Executives

detailing the success, risks and failures of all proposed application

and network design implementations.

. Effectively manage all Testers, Software Packagers and Network

Engineers assigned to my Test Team.

. Successfully met scheduled milestones and their proposed project

deadlines.

. Attend technical brainstorming meetings in-person or via conference

call.

. Built and configured Project Server 2010 to stay aware of all assigned

projects.

. Deemed responsible for preparing and staging the entire Test

Environment with TSA approved images 3.x and above for formal testing.

. Responsible for all wireless and VPN testing which includes

Blackberry, Microsoft PDAs, cellular wireless cards, tethering and wi-

fi.

. Assigned to handle all PDA security testing via Credant encryption

implementations and monitoring.

. Selected to oversee TSA's 20 top secret TOP Applications and work with

their Developers and DBAs.

. Each month push new Microsoft Patches to all workstations and servers

in the ITE Lab environment.

. Perform critical network Security Scans using specialized Windows/UNIX

based tools to uncover potential hacker attack vulnerabilities, port

intrusions and identify internal application TCP/UDP dependencies.

. Via teamwork successfully migrated over 50 Production and Data Center

applications.

. Work directly with other teams such as the Developers & Packagers to

enhance operations.

. Chosen as the direct point-of-contact for collaboration with Lockheed

Martin in working on the TRX Airport Screening projects.

. Has served as the Technical Lead on such server projects involving

Windows Server 2003, Altiris Server 6.8, Blackberry Server 4x,

Symantec Anti-Virus Server 11, Project Server 2005, Live Communicator

2005, SABRE, Credant Server 5x, Cisco Unified Communicator and

Sharepoint 2005.

. Migrated all active and passive Blackberry Enterprise Servers from

Version 4.1.3 to 4.1.4 MR3.

. Validate software versions and repackaged application updates using

Checksum verifications. (critical)

. Responsible for Disaster Recovery implementations.

. Determine hardware requirements and suggest OS standards for optimum

performance and security.

. Performs hands-on system monitoring, troubleshooting, administration

and maintenance.

. Built lasting relationships with vendors

Technologies: VMware, Altiris 6&7, Project Server, Blackberry, Credant

Encryption, Cisco Unified Communicator, UNIX, Windows XP Professional,

Windows Server 2000, 2003 and 2008, Exchange Server 2003 and 2007,

Microsoft Office Professional, Sharepoint, WSUS, SCCM, Active Directory,

SQL Server 2005 and 2008, EMC SAN, Remedy ARS and Symantec Anti-Virus.

[pic] Mall Lobby.com, Inc. (MLI)

I.T. Consultant / Sr. Project Manager

December 2005 - Present

. Deemed the Contracting Official for maintaining and renewing all

current City, Municipal, State & Federal Government, Fortune 500,

Commercial, Academic and Small Business contracts.

. Responsible for all Fiscal Year Budget and Funding allocations.

. Key point-of-contact to approve or deny Information Technology

hardware/software procurement requisitions and/or licensing.

. In charge of Administrative Affairs and all corresponding contract

paperwork.

. Utilize ITIL Project Management principles and business system

practices.

. Architect infrastructure designs that will improve our client's

overall operations.

. Make technical recommendations and provide vendor Price Quotes to

begin conceptual overviews.

. Generate Daily & Weekly Status Reports to stay on track with all

projected Milestones, Control Gates and Project Deadlines.

. Assigned the RFP, RFI and IFB lead for response writing for new

contract vehicle opportunities.

. Ensure new contracts are created through the use of the company's GSA

Schedule 70 I.T. contract.

. Responsible for securing new business and clients.

. Manage, coordinate and direct over 250 Tier 1 Subcontractors.

. Make certain through E-Verify all employees, contractors and H-1Bs are

legally eligible to work in the U.S. based on Dept. of Homeland

Security and USCIS standards.

. Successfully find new workplace improvements through the enforcement

of 360 degree feedback.

. Develop SOPs (Standards of Procedures) for clients.

. Oversee invoice, payroll, health insurance and employee benefit

functions.

. Run all necessary clearance, credit, employment, education and

criminal background checks.

. Screen and interview potential candidates/employees.

. Create technical documentation for clients as a Knowledge Base.

. Construct network computing diagrams, rack elevations and more in

Visio.

. Provide a host of technical services to clients from Project

Management, Technical Lead roles, Virtualization (VMware), Storage

Administration (NetApp, Dell, EMC), Systems Administration, Help Desk,

Network Engineering, Database Administration, Citrix Farm

Administration, Backup Administration, DR/COOP Site Development and so

much more.

. Cut costly overhead for clients and reduce budget spending so they

incur greater savings/profits.

. Maintain strong vendor relationships and negotiate the best deals and

on-site proof of concepts.

. Recognized as a Master Dealer for Sprint, Verizon, AT&T and T-Mobile.

. Strong work ethics and morals.

. Able to work independently..

. Excellent communication skills both written and verbally.

. Fully committed to a project until it's successfully completion.

. A true team player.

. Known for going the extra mile.

Technologies: Visio 2013, Project Server 2012, Windows 8.1 Pro, Windows

Server 2008 R2, Windows Server 2012 R2, Exchange Server 2010, Sharepoint,

Microsoft Office Professional 2013, Active Directory, SQL Server 2008,

Remedy ARS 8.1, Symantec Anti-Virus, WSUS, SCCM, Active Directory, DNS,

Virtual Storage Console, SolarWinds, Remedy ARS, VMware 5.5, vCenter 5.5,

ESXi Hosts, NetApp Storage, CDOT 8.2, SAS, iSCSI, RAID-DP, Fibre Channel,

LUNs, Aggregates, HA (High Availability), DRS, vMotion, Storage vMotion,

SAN, NAS, NFS, CIFS, Multistore, SnapManager, SnapMirror, SnapProtect,

SnapLock, SnapVault, SnapRestore, OnCommand System Manager 3.1, Data Fabric

Manager (DFM), VMFS-5 and DataStores.

[pic] Defense Finance and Accounting Services (DFAS)

Informatica Consultant

October 2005 - December 2005

. Designed disaster recovery and failover policies to ensure low-

side/high-side continuity of operations.

. Communicate with contract officials with regards to productivity,

status updates, and the direction.

. Assigned as the I.T. resource for all Informatica issues in PA plus

given the task of training others.

. Create Server 2003 clusters in Active Directory environments for

software/hardware redundancy.

. Administer DNS, TCP/IP, DHCP, WINS, VIP, and Firewall Security

settings for project operations.

. Implement enterprise-wide application deployments to all designated

Disaster Recovery/COOP environments.

. Assist in the Project Management and design of a new global payroll

system that integrates all branches of the U.S. Military into one

unified accounting system.

. Responsible for the build, hard drive array, RAID set-up, OS

installation, configuration, testing, maintenance, and performance

monitoring of all Windows Server 2003 nodes.

. Migrate new universes, DDLs, and codes as changes occur in the SQL,

DB2, and Oracle databases.

. Handle the troubleshooting of all escalated issues both application

and system related.

. Prepare in-depth failover technical documentation for input into the

client's LDRPS knowledge base.

. Revised and created technical documentation surrounding Active

Directory, Security and Clustering.

. Communicated well with others.

. Built strong interpersonal client relationships.

Technologies: Informatica, Cisco Firewall, Oracle 9i, SQL Server 2005,

DB2, Windows XP Professional, Windows Server 2000, Windows Server 2003,

Exchange Server 2003, Sharepoint, Microsoft Office Professional, Active

Directory, VPN, SQL Server 2005, Visio 2003, Remedy ARS and Symantec Anti-

Virus.

[pic] Defense Logistics Agency (DLA)

I.T. Technical Consultant

March 2005 - September 2005

. Project Lead to key military personnel in the development, testing,

and production phases.

. Oversaw the architecture, operation, and maintenance of the network

from start to finish.

. Appointed to fly out to various U.S. Naval & Air Force facilities to

lead off the architectural builds.

. Developed Windows Server 2003 clusters in SAN environments to

strengthen redundancy.

. Exercised server and PC hardening in order to have nodes pass the

military's STIG requirements.

. Provided inbound and outbound rules for the Cisco PIX Firewall to

tighten LAN/WAN network security.

. Communicated top secret data via SIPRNET and low-side data via NIPRNET

to personnel.

. Installed various military console interfaces for global



Contact this candidate