HASEEB MANSOOR
Address: **** ** ****** (Edmonton,AB)
Email: ******.*******@*****.***
Mobile # 780-***-****
Objective
Seeking a challenging and interesting position in a company as project / maintenance engineer where i can make a positive contribution to people's lives and the work environment
Education
Bachelor of Mechanical Engineering
( 2003-2006 )
University of Engineering and Technology Taxila, Pakistan 80% (Honours)
Certification Courses
PMGT 900 /901 : Fundamentals of Project Management ( 2014 )
North Alberta Institute of technology ( NAIT ),Edmonton AB
A17356 :Food Safety Management systems Auditor/ Lead auditor ( ISO 22000:2005 )
(2013)
International Register of Certified Auditors ( IRCA )
Engineering Software
skills
* Engineering Softwares: MS PROJECT, PRIMAVERA P6, Ansys 5.7, Duct design 5.0, Microvision2.
* Modeling/design tools: Pro engineering, Auto cad,Solid works, cadmax 9.5. Autodesk
* MS Office : Excel, Word, Power Point, SAP
Career Summary
DESIGNER – PROJECTS - JET Power and Controls ( Edmonton,AB -Canada ) (Feb 2014- Currently employed)
PERFORMANCE BONUS : "Got performance BONUS from my management by initiating cost saving projects within first month of employment"
* Responsible for 3D designing and program development for CNC machines.
* Supporting the design for mechanical and electrical aspects of projects in SOLID WORKS and AUTOCAD.
* Design and structural analysis for machine components and support structures.
* Draft survey plans and calculations accurately using information gathered from the field and office in a timely manner.
* Meeting with project managers, engineers, and clients to understand the needs and requirements for a new product or mechanical system
* Produce all drafting plans within or under projected timelines
* Work closely with all drafters and keep the drafting Supervisor and/or Project Manager apprised of progress and any issues that may arise
* Assist the drafting Manager with developing useful AutoCAD tools, standards and procedures
* Progressive design of single lines, schematics, electrical power apparatus associated with switch gear and motor control utilizing electrical calculations and AutoCAD
* Assist with the installation, commissioning, maintenance and repair of electrical and mechanical apparatus
* Maintain a wide variety of equipment in good working order by performing both repair and preventative maintenance
* Complete all maintenance record keeping and ensure all related maintenance information is available
* Perform equipment/system improvements as well as research and test new equipment
* Testing and modifying models under different conditions, such as temperature or humidity.
* Training and development of staff
ASSISTANT MANAGER ENGINEERING– PROJECTS : Engro Foods Limited ( PAKISTAN ) - (August 2009 – Dec 2013)
ACCOMPLISHMENTS :
* Erection and commissioning of Heavy Fuel Oil 20 MW cogeneration power plant
* Erection and commissioning of Biomass steam generation plant
* Design, fabrication and installation of utility piping and racks network for newly commissioned powder manufacturing plant
* Commissioning and start-up of 25bar, 10 ton BOSCH boilers
* Erection and commissioning of 7 x 50000 m3 / hr air handling units for dairy processing, finished goods warehouse, boiler hall and ammonia compressor room
* Erection and commissioning of compressors (air/ammonia), diesel and gas gensets, HV/MV/LV transformers, reverse osmosis plants, water softening plants, operational machinery .
* Expansion of liquid ingredient area for ice cream plant
* Construction, fabrication and erection of material warehouse yards
* Commissioning of surveillance solution for Engro Foods Limited Sahiwal plant
* Installation of 8 x one cusec turbines for entire factory
* Erection and commissioning of ECOLEAN machine for production department
* Erection and commissioning of 24000 packs /hr A3 speed machine of Tetra Pak
* Erection and commissioning of UHT One step Tetra Pak machine
* Erection and commissioning of Big drum machine for ice cream plant
* Achieved BRC certification . Lead coordinator for Engineering department (Dairy & ICP)
* Achieved ISO (9001,14000,18001, 2200 ) certification,taking lead for Engineering Department ( Dairy & Ice cream )
* Development of the project charter, project design basis memorandum and execution plan ( Level 4 ), budgets and schedules
* Look after all mechanical, design, electrical, instrumentation and civil aspects for each project and assign tasks to team of 15 people.
* Assist preparation of Work Breakdown Structure (WBS) and documented cost time and resource (CTR) sheets for phased cost estimates in line with the company guidance notes for agreement and sign-off by the CTR budget holder
* Review project costs, calculate future costs based on labour productivity, material price increases, subcontract, wage rates and risk analysis. Develop and provide project variances, trending, and analysis of expenditures, and completion reports
* Developed, updated and implemented preventive maintenance and calibration plans ( Mechanical, Electrical & Instrumentation ) & Utilities equipment ( Compressors, Condensers, Evaporators, Chillers, Planned and executed annual Maintenance of Boiler and monthly/annual shutdowns
* Working on Inventory management and updating Min-Max levels of spare parts in coordination with Material Warehouse
* Knowledge and proficiency with ASME, ANSI, API, CSA and other accepted industry codes and standards.
* Supervised at project levels like ( Placement of cream tanks, Sugar Dosing tanks and Raw milk tanks in Production Area, addition of new drain line for Utility, Addition of new Swing bend panel for Tetra Pak hall Machines
* Time and motion study to eliminate avoidable delays in maintenance to meet Mean Time To repair ( MTTR ) and Mean Time Between Failure (MTBF) targets.
* Initiated “Technical Excellence Drive “ at site covering combination of theory and on job trainings for technical staff like Boilers, Pumps, Refrigeration Systems, PDCA,Energy Management etc and covered 1200 man hrs .
SUPPLY CHAIN EXECUTIVE : Coca Cola Beverages Limited ( PAKISTAN )- (Jan 2007 – July 2009)
* Erection and Commissioning of SHV LPG facility at Coca Cola (Multan– Site)
* Installation of bottling line for 250 ml beverage SKU
* Installation and commissioning of RO water treatment plant
* Developed Project Office, financial management & timely closure was a plus on my behalf.
* Responsible for planning, execution and closure of projects and in-house trainings for various departments.
* Developed & implemented preventive maintenance charts resulting in reduction in Fuel consumption cost to 18 % & vehicles repair cost to 33 % for fleet department covering 200 + vehicles .
* Supervised 90 + employees ( Permanent + Contractual) covering fleet area of division .
* Designed Fleet Office & Mechanical Workshop & looked after its construction till Closure .
* Developed Fleet Management system training module for master users and conducted 500 Man hrs training .
* Improved fleet vehicle capacity utilization to 65 % in 6 months
* Reduction in glass breakage to 20 % in close coordination with production team
* Development of SOP's (Standard operating procedures), Work Instructions & control point check lists .
* Implemented 5S to workshop, Warehouse & Project area at site.
Trainings
* Process Hazard Analysis techniques by Engro Fertilizers Pvt Limited .
* “Project management prince 2 “ conducted by Pakistan Tobacco Company (PTC)
Extracurricular
activities
* Annual Table tennis champion for last 2 years in Engro Foods Limited
* Best match referee 2012 in annual sports competition
* Academically I participated in SCIENCE and ARTS exhibitions (2002-2003)
References
Will be furnished upon request