Matthew Fuller RHIA
Email: ******.*.**@*****.***
Mobile: +1-630-***-****
Summary of Experience and Qualifications
Matthew is a RHIA credentialed Healthcare Provider Information Technology practitioner with over three
years of experience in Health Information Technology implementations and integrations, all within the
revenue cycle space. Matthew has a particular interest in optimization work with revenue cycle
applications, analytical applications and revenue cycle operations. Matthew has project experience in all
phases of systems development life cycle Matthew was responsible for the success of Epic’s revenue
cycle EMR transition, in particualr the Hospital Billing and Professional Billing modules. Other project
experience and responsibilties include: installing Healthstream Registration Management, upgrading to a
BOE 4.0 Reporting platform, coordinating a successful execution of integrated testing consisting of 26
Epic applications, data modeling, data warehousing, quality assurance, JIRA, SharePoint, Microsoft
applications including Word, Excel, Access, Powerpoint, Outlook, and OneNote. Matthew is certified in
the following Epic applications: Resolute Hospital Billiing, Professional Billing, and Hospital Billing
Claims.
Deloitte Consulting LLP(June 2011 Current)
Project Experience
Testing Coordinator for Epic Implementation; 9 months.
University of North Carolina Healthcare System is a not for profit integrated health care system, owned by the
State of North Carolina. UNC’s implementation of the Epic system is Epics largest systems implementation to date
going live with three different hospitals over a very aggressive project timeline.
Role: Matt’s role as testing coordinator encompassed the planning, development, implementation and support of
an integrated testing model for the Epic system. The testing model was built to validate the workflows of full patient
life cycles utilizing all of the health systems Epic applications, interfaces and ancillary systems. 220 unique
workflows affected by across three entities were tested over 5 rounds of testing. Testing efforts included providing
SME exposure prior to system training and testing converted live production data in a support environment during
round 5. Matt was required to develop and execute a model that frequently evolved based on system build
requirements and issues. Matt managed the integrated testing room daily for 5 months which contained up to 25
analysts at any given time.
Technical Environment: Vendors: Epic and Atlassian JIRA
Project Associate for SAP BOE Migration and BI Transformation; 4 months.
University of Washington Medical Center: The BOE Migration project will include the technical implementation of
BusinessObjects, and transfer of Epic reporting capabilities to the new platform. Joining the project during its
planning phase, Matt was assigned to do an extensive analysis on Epic and Cognos Hospital Billing reports in
scope. Following this analysis, Matt was identified as an ideal candidate to be the HB reports development lead
and testing coordinator.
Page 2 of 4
Role: Matt was brought onto the team to perform a low level analysis on 101 HB reports in scope to identify where
Epic model reporting content could be leveraged by the client during Release one. Following the analysis, Matt
transitioned to the reports development lead role where he obtained report requirements from business operations
and developed report specifications for Clarity report writers to use during the build phase. Matt continued in this
role, strategizing for the second release of reports and helped to develop a testing model to be leveraged by the
client for all future Business Intelligence projects. Leveraging the testing model, Matt evolved into the role of testing
coordinator for the second release of reports. Matt helped the client manage the Clarity report developers through
several successful report releases and reported status up to project leadership.
Technical Environment: Vendors: Epic’s Resolute Hospital Billing, IBM Cognos, and SAP BOE 4.0
Project Associate for Revenue Cycle AR Stablization Effort; 2.5 months.
Cadence Health: Two hospital system based in Winfield, IL Jan 2013 March 2013
Following the Epic go live at the second hospital in the health system, Matt was assigned to assist with the
stabilization of the AR, specifically focusing on key metrics including: Candidate for Bill (CFB), Accounts
Receivable (AR) Days, and total AR.
Role: Matt was part of a two person team, reporting to the Sr. Director System Revenue Cycle Operations and
Director Patient Financial Services. Project scope included a system’s analysis to determine financial bottlenecks;
prioritization of issues; small scale workflow re design sessions; build and testing of system changes; and
engaging a client side SWAT team to assist with needed documentation, policy and procedure updates, and staff
training. In the two month time frame, Matt was able to reduce the client’s total CFB by 34%, Discharge Not Billed
(DNB) errors by 49%, and total AR days by 8.4% (down to a low of 39.3). All of these statistics represented the
client’s lowest metrics since their first hospital go live.
Technical Environment: Vendors: Epic’s Resolute Hospital Billing, Claims, and SBO applications
Hospital Billing Application Coordinator for Epic Integration; 11 months.
Delnor Community Hospital: Secondary hospital in a newly formed healthcare network; Cadence Health
based in Geneva, IL January 2011 – December 2012
Following the Epic go live at Central DuPage Hospital, Delnor Community Hospital merged with Central
DuPage Hospital and formed Cadence Health. Cadence Health retained Deloitte to assist with the
implementation of Enterprise Epic at Delnor hospital.
Role: Matt performed as Hospital Billing Application Coordinator. In this role, Matt was responsible for all
phases of system implementation including, discovery, build, testing, activation, and post live support.
Specific tasks include building and testing application configurations including charge testing with
clinical applications, workqueues and rules, payors and plans, user security, research studies, billing
reports, imports and exports. Matt facilitated vendor meetings to complete planning, specifications, build
and testing of imports and exports. He was responsible for leading the charge conversion activities
including full balancing between legacy AR, Epic AR, and Lawson GL. Matt developed hospital billing
activation/cutover plans and was responsible for facilitating completion of the related activities. The client
achieved a one percent variance in AR from baseline three weeks post go live.
Technical Environment: Vendors: HealthStream, Epic’s Resolute Hospital Billing, Claims, and SBO
Page 3 of 4
applications
Hospital Billing Application Coordinator for Epic Implementation; 4 months.
Central DuPage Hospital: Acute Care facility based in Winfield, IL Sep 2011 – January 2012
Implementing Epic since June 2010, Matt was assigned to join the core revenue cycle team to assist with pre and
post go live support activities.
Role: Contributed to build, testing and go live activation support and maintenance activities of the Resolute
Hospital Billing Application. Joining the project life cycle during the testing phase, Matt provided significant
integrated testing support and worked diligently with operational departments and communicated results of charge
testing with departmental and project team managers. Matt also contributed to go live efforts including command
center lead for the Hospital Billing Application and was a communication liaison for issue’s logged during the two
week post go live efforts.
Technical Environment: Vendors: HealthStream, Epic’s Resolute Hospital Billing, Professional Billing,
Claims, and SBO applications
Training Team/Enrollment Representative; 2 months.
Regional Health System that comprises several affiliated organizations that have been providing a
continuum of high quality health care services for over 150 years.
Role: Responsible for the direct support to hospital staff employees for enrollments into Epic’s CIS
training, over 5,000 employees. Responsible for training staff members to support the enrollment
process for pre and post go live training. Activities included: Manipulating Care Connect systems data
to reflect overall enrollment input, providing face to face service for emergency enrollment and
principal trainer requests, assisting with recommendations for workflow development, communicating
with physicians, nursing staff, departmental manager, and front/back end hospital users to ensure
accurate registration for Epic go live training.
Technical Environment: Vendors: HealthStream and Care Connect full access; Epic limited
access.
Previous Experience
Associate Intern for HIM Director; 3 months.
Rehabilitation Institute of Chicago; Number 1 rehabilitation institute in America since 1991, RIC
operates a network of alliance hospitals and outpatient and day rehabilitation clinics throughout Illinois
and Indiana.
Role: Shadowed the HIM director’s daily routines, meetings, travel and interactions with staff
members in all departments. Attended Internal HIPAA, Audit, Security, IT, meetings gaining insight and
providing opinions. Activities included: Outpatient go live training for external record imaging, updating
JCAHO standards per RIC documentation, IP Coding, work with HIM staff members to streamline
processes and improve efficiency.
Technical Environment: CernerWorks CIS as a back end user with HIM Director access
Page 4 of 4
HIM department Intern; 4 months.
Advocate Illinois Masonic Medical Center; one of Chicago's leading hospitals with an emergency and
trauma center that has served the north side community for over 100 years.
Role: Worked with different functions of the HIM department on a one day per week basis. Activities
Included: QA/QM, coding, revenue cycle overview, IS department overview, deficiency analysis,
records management.
Technical Environment: 3M Encoder
System Experience
Software / Products: SmartDraw (Proficient), CernerWorks (Project Experience), Epic
Resolute Hospital and Professional Billing, Hospital Billing Claims, Single Business Office
(SBO) applications (Expert Project Experience), 3M Encoder (Project Experience) Atlassian
JIRA (Project Experience)
Development Tools / Languages: SQL (Proficient), JQL (Proficient)
General Tools: Microsoft Applications including Word (Expert), PowerPoint (Expert), Visio
(Expert), OneNote (Expert), Excel (Proficient), Access (Proficient)
Education
B.S. Health Information Management
University of Illinois at Chicago
Professional Affiliations / Certifications
Certified RHIA
•
AHIMA Affiliation
•
Epic Certified Resolute Hospital Billing, Resolute Hospital Billing Claims, Resolute
•
Professional Billing