Post Job Free
Sign in

Project Manager Engineer

Location:
Edmonton, AB, Canada
Posted:
August 26, 2014

Contact this candidate

Resume:

Susan Gould

*** ********** ****, *** ***

Edmonton, Alberta, T6J4M5

587-***-****

*********@*****.***

OBJECTIVE

Due to the recession, I was unable to find work in the United States, so

for the past 3 years I have been working for Oil & Sand engineering firms

in Alberta, Canada. I am interested in a Civil Design position and I will

need just travel time to move from Canada to your location.

HIGHLIGHTS OF QUALIFICATIONS

. 15 years' experience designing/drafting using computer aided design

software - Microstation V8i, AutoCad 2010, CAICE, Inroads and Civil 3D

. 25 years combined experience in the construction industry, working

under county, state and federal regulations in United States

. Expertise surveying, bridge and roadway construction, environmental

rehabilitation sewer and oil sands construction design

. Excellent in technical analysis and generating reports, detail-oriented

and quick learner

. Strong organizational, analytical and time management skills

. Good oral and written communication skills

. Constantly working on acquiring analytical and problem solving skills

. Ability to work independently but enjoys a team player environment

RELEVANT SKILLS AND EXPERIENCE

Civil/Structural Design/Drafting

. Create 3D/2D drawings from Inroads to Microstation and Civil 3D/2D to

AutoCAD

. Prepared documents for design creation or modification

. Modified existing designs, prepared and drafted drawings for designs

and specifications requested by civil/structural department

. Created or modified shop drawings to show standard specification

details

. Design and prepare construction drawings for highways, streets, urban

subdivisions and water, sewer and storm water systems

. Review shop drawings to ensure that they conform to design concepts

Bridge and Roadway Inspection

. Perform surveying tasks during various phases of design and

construction

. Inspect and supervise work at construction sites to ensure that safety

and design specifications are followed and costs are contained

. Inspect roads, bridges and other structures to assess the need for

maintenance and repair work

. Conduct field and laboratory tests on soils, asphalt and concrete,

assessing them according to specifications set by American Society for

Testing Materials (ASTM) tests

. Interpret quality control tests and prepare technical reports

. Manage projects (daily dairies, inspection and material testing, pay

item reports, traffic and erosion control)

Leadership

. Led a team of 4 civil technicians in the daily task of test and

inspection of bridge and roadway construction

. Oversaw 2 drafters to preform scheduled work, and assisted in training

of new software and design

. Coordinated with Training Department in order to train the newly

hired field inspectors in earthwork calculations in field

CORE STRENGTHS

Throughout my career I have been involved with many different civil

projects. My experience in surveying and construction gave me a solid base

on which to build upon. Testing and inspection were great guidelines to

insure that projects were constructed in a safe and proper manner. As

earthwork coordinator, I was involved in barrow pit quantities but also

involved in as-built construction earthwork quantities that lead to my

designer skills.

As a designer, I try to incorporate safety during the construction phase,

involve other departments such as mechanical, electrical and construction

personnel so that my civil plans reflect existing and proposed design

plans.

EDUCATION

Associate Degree in Civil Technology 1991

Fayetteville Community College Fayetteville,

North Carolina

Microstation 1997

Department of Transportation of Georgia Jesup, Georgia

CEAL/CAICE 1998

Department of Transportation of Georgia Jesup, Georgia

Microsoft Excel 1997

Department of Transportation of Georgia Jesup, Georgia

AutoCad 2003

Russell Garner and Associate Gulfport,

Mississippi

GIS 2008

City of Los Angeles - Waster Water Conveyance Los Angeles,

California

SMART 2008

City of Los Angeles - Waster Water Conveyance Los Angeles,

California

Inroads 2012

NAIT Edmonton, Alberta

Civil 3D 2013

NAIT Edmonton, Alberta

EMPLOYMENT HISTORY

Civil Designer 2013 - Present

Stantec Edmonton,

Alberta

Worked as a civil designer for Enbridge, using

AutoCad, Inroads and Civil 3D to design 3 - Electrical

building sites, 3 crane pads and underground pipe from

surrounding oil storage tanks. Worked closely with

mechanical, survey and structural to completed 12 Issued

for Construction packages for Enbridge Oil and Gas.

Civil Designer 2011 - 2012

WorleyParsons Edmonton,

Alberta

City of Medicine Hat, as civil designer for City of

Medicine Hat - Used AutoCad and Inroads to design

layout for solar plant layout, roadway and drainage.

Syncrude, Edmonton, Alberta, Canada - Plant 23 - Tailings

Relocation - North Mine South Pit West - Fluid Transfer

System Excavation and Ramp at 704 and 705 Haul Roads. Design

fluid transfer culverts, quantities for cut and fill

earthwork. Inroads design fluid transfer system.

Suncor, Edmonton, Alberta, Canada -Plant 300 Pump House.

Design perimeter road and pad to accommodate 3 electrical

houses, one pump house and a high voltage substation.

Shell Canada, Fort Saskatchewan, Alberta, Canada

Shell Canada - Scotford Upgrader - Duties and

responsibilities involve reviewed old drawings and

designing site preparation for excavation, earthwork,

drainage and underground utilities for the Electrical

and Instrumentation Building.

Shell Canada - North Hub Laydown Yard Duties and

responsibilities involve creating new drawing and designing

site preparation for excavation, earthwork, and drainage.

Senior Civil Designer 2005 - 2010

Lee & Ro City of Industry,

California

City of Ontario Recycled Water Conversion Program. As a

USC Certified Cross-Connection, I have coordinated with

subcontractors and residents to test the water quality and

to verify that there is no cross connection between potable

water and recycled water. Once the testing is complete I

organize the information and water a certified report to

the City of Ontario.

Sewer Investigation for Upper Beachwood Easement Project

Division (WCED), Bureau of Engineering, Department of

Public Works, City of Los Angeles. As project Engineer,

Susan is coordinating with subcontractors and residents to

inspect sewer reaches and locate bends where maintenance

holes will later be installed to better maintain the sewer

reaches.

Secondary Sewer Renewal Program (SSRP), Wastewater

Collection Engineering Division (WCED), Bureau of

Engineering, Department of Public Works, City of Los

Angeles. Project Engineer/SSRP Design Team Member. Since

June 4, 2007, I was b stationed in WCED offices in the

Department of Public Works Building in downtown Los Angeles

and has been performing SSRP project designs using the City

of Los Angeles' SMARTS design tool. She has been assigned

with three SSRP projects thus far: 6.06 miles P18A - Eagle

Rock Blvd., & York Blvd.; 5.88 miles E02 - Ventura Blvd., &

Lankershim Blvd and DAR 01 Hollywood project, 0.30 miles.

She has also received training in Clay Pipe, various types

of lining, remove and replace clay/concrete pipe and

several different types of pipe bursting.

Bitter Point Pumping Station, Newport Beach, Orange county

Sanitation District. Civil Designer for a large pump

station worksite located in a lot contiguous to the Pacific

Coast Highway. I was responsible for designing access,

traffic control, grading and drainage.

24-inch Lineville and 12-inch Elderberry Recycled Water

Pipelines, Inland Empire Utilities Agency, Ontario. Civil

Designer for preparation of plans and profiles for

pipelines and for design of traffic controls and detour

plans.

NOS Rehabilitation, Van Ness to Trinity and NOS-MAZE

Rehabilitation Phase V, Bureau of Engineering, City of Los

Angeles. As Civil Designer, prepared traffic control and

detour plans.

Chloramine Disinfection Conversion Project, Los Angeles

County Waterworks District. Civil Designer for yard piping

for 18 separate disinfection worksites, each consisting of

potable water reservoir(s), booster pump station, and

storage facilities for chlorine and ammonia. Also,

responsible for the design of traffic flow paths for 18-

wheeler entrance and exit.

Civil Designer 2003 - 2005

Russell Garner and Associate Gulfport,

Mississippi

Mississippi Department of Transportation (MDOT) Consultant.

As a designer I was responsible for updating an old

version Microstation files to Version 7 for SR 67 in

Harrison County. Prepared MS Excel cost estimating

spreadsheet template for the permanent sign program.

City of Gulfport, MS. Using AutoCAD 2002 and AutoCAD LDD,

designed the City of Gulfport Drainage project and was also

responsible for quantity takeoffs and cost estimating.

Bridge & Roadway Inspector/ Earthwork Coordinator/

Civil Designer Level 1 1991 -

2002

Department of Transportation of Georgia Savannah,

Jesup & Atlanta, Georgia

Georgia Department of Transportation (GDOT), Atlanta

SR 46 Route Bridge and Road Relocation, Georgia. Lead

Designer for a $14 million Bridge and Roadway Relocation

over Oconee River Bridge and Oconee Overflow River Bridge.

CAICE, MS SE and Hy-8 software were used. Beginning with

topography maps, triangulated coordination points to create

cross sections, determined alignments, and prepared

plan/profiles and erosion controls. Received a

Commissioner's Award among 14 projects competed in 2001.

Georgia Department of Transportation (GDOT), Jesup as

Earthwork Coordinator, calculated in-place-embankment and

unclassified excavation for 27 projects with a construction

value of $65 million. Used CEAL and CAICE software

extensively. Trained field construction crews on earthwork

quantity take-offs and estimating.

Georgia Department of Transportation (GDOT), Savannah As a

field project engineer, managed and inspected bridge and

roadway construction in Savannah

- Tallmadge Bridge, bridge and roadway inspector, assist

project manager

over one Approach Bridge and two ramps.

- Harry S. Truman Parkway, assist project manager over

three bridge three miles of new roadway construction,

canal, five culverts, earthwork, traffic control, 9

subcontractors and responsible for 4 employees. Error

found in survey of culvert, causing a change order and

infield assessment to find error and correct problem.

Once error was found it became a change order and

responsibility included documentation of entire project

in order to correctly access that the work was

sufficient to fix error and the contractor was paid

correctly.

Bullock County, Project manager over 5 detour bridge

projects, located in various areas throughout Bullock

County. Sample and testing, bridge and roadway

construction, erosion control, traffic control, daily

diary, three subcontractors. No employees on this project

to assist, had to access on a daily basis where the work

was most critical and cover all work where possible.

Deanie Frazier Overpass over railroad, bridge and roadway

inspector, 4 employees and 4 subcontractors.

I-95 Widening Phase I, II, III, ongoing 24-hour a day

construction, 17 miles of bridge and roadway widening.

Responsible for training college student, federal audit of

asphalt quantities, bridge and roadway inspection and

drainage pipe.

SUSAN GOULD'S REFERENCES:

David Rubinstein, Civil Professional Engineer, Fluor 281-***-****

Raj Duraiswamy, Civil Professional Engineer, Stantec 780-***-****

William Yin, Civil Professional Engineer, Stantec 780-***-****



Contact this candidate