Susan Gould
Edmonton, Alberta, T6J4M5
*********@*****.***
OBJECTIVE
Due to the recession, I was unable to find work in the United States, so
for the past 3 years I have been working for Oil & Sand engineering firms
in Alberta, Canada. I am interested in a Civil Design position and I will
need just travel time to move from Canada to your location.
HIGHLIGHTS OF QUALIFICATIONS
. 15 years' experience designing/drafting using computer aided design
software - Microstation V8i, AutoCad 2010, CAICE, Inroads and Civil 3D
. 25 years combined experience in the construction industry, working
under county, state and federal regulations in United States
. Expertise surveying, bridge and roadway construction, environmental
rehabilitation sewer and oil sands construction design
. Excellent in technical analysis and generating reports, detail-oriented
and quick learner
. Strong organizational, analytical and time management skills
. Good oral and written communication skills
. Constantly working on acquiring analytical and problem solving skills
. Ability to work independently but enjoys a team player environment
RELEVANT SKILLS AND EXPERIENCE
Civil/Structural Design/Drafting
. Create 3D/2D drawings from Inroads to Microstation and Civil 3D/2D to
AutoCAD
. Prepared documents for design creation or modification
. Modified existing designs, prepared and drafted drawings for designs
and specifications requested by civil/structural department
. Created or modified shop drawings to show standard specification
details
. Design and prepare construction drawings for highways, streets, urban
subdivisions and water, sewer and storm water systems
. Review shop drawings to ensure that they conform to design concepts
Bridge and Roadway Inspection
. Perform surveying tasks during various phases of design and
construction
. Inspect and supervise work at construction sites to ensure that safety
and design specifications are followed and costs are contained
. Inspect roads, bridges and other structures to assess the need for
maintenance and repair work
. Conduct field and laboratory tests on soils, asphalt and concrete,
assessing them according to specifications set by American Society for
Testing Materials (ASTM) tests
. Interpret quality control tests and prepare technical reports
. Manage projects (daily dairies, inspection and material testing, pay
item reports, traffic and erosion control)
Leadership
. Led a team of 4 civil technicians in the daily task of test and
inspection of bridge and roadway construction
. Oversaw 2 drafters to preform scheduled work, and assisted in training
of new software and design
. Coordinated with Training Department in order to train the newly
hired field inspectors in earthwork calculations in field
CORE STRENGTHS
Throughout my career I have been involved with many different civil
projects. My experience in surveying and construction gave me a solid base
on which to build upon. Testing and inspection were great guidelines to
insure that projects were constructed in a safe and proper manner. As
earthwork coordinator, I was involved in barrow pit quantities but also
involved in as-built construction earthwork quantities that lead to my
designer skills.
As a designer, I try to incorporate safety during the construction phase,
involve other departments such as mechanical, electrical and construction
personnel so that my civil plans reflect existing and proposed design
plans.
EDUCATION
Associate Degree in Civil Technology 1991
Fayetteville Community College Fayetteville,
North Carolina
Microstation 1997
Department of Transportation of Georgia Jesup, Georgia
CEAL/CAICE 1998
Department of Transportation of Georgia Jesup, Georgia
Microsoft Excel 1997
Department of Transportation of Georgia Jesup, Georgia
AutoCad 2003
Russell Garner and Associate Gulfport,
Mississippi
GIS 2008
City of Los Angeles - Waster Water Conveyance Los Angeles,
California
SMART 2008
City of Los Angeles - Waster Water Conveyance Los Angeles,
California
Inroads 2012
NAIT Edmonton, Alberta
Civil 3D 2013
NAIT Edmonton, Alberta
EMPLOYMENT HISTORY
Civil Designer 2013 - Present
Stantec Edmonton,
Alberta
Worked as a civil designer for Enbridge, using
AutoCad, Inroads and Civil 3D to design 3 - Electrical
building sites, 3 crane pads and underground pipe from
surrounding oil storage tanks. Worked closely with
mechanical, survey and structural to completed 12 Issued
for Construction packages for Enbridge Oil and Gas.
Civil Designer 2011 - 2012
WorleyParsons Edmonton,
Alberta
City of Medicine Hat, as civil designer for City of
Medicine Hat - Used AutoCad and Inroads to design
layout for solar plant layout, roadway and drainage.
Syncrude, Edmonton, Alberta, Canada - Plant 23 - Tailings
Relocation - North Mine South Pit West - Fluid Transfer
System Excavation and Ramp at 704 and 705 Haul Roads. Design
fluid transfer culverts, quantities for cut and fill
earthwork. Inroads design fluid transfer system.
Suncor, Edmonton, Alberta, Canada -Plant 300 Pump House.
Design perimeter road and pad to accommodate 3 electrical
houses, one pump house and a high voltage substation.
Shell Canada, Fort Saskatchewan, Alberta, Canada
Shell Canada - Scotford Upgrader - Duties and
responsibilities involve reviewed old drawings and
designing site preparation for excavation, earthwork,
drainage and underground utilities for the Electrical
and Instrumentation Building.
Shell Canada - North Hub Laydown Yard Duties and
responsibilities involve creating new drawing and designing
site preparation for excavation, earthwork, and drainage.
Senior Civil Designer 2005 - 2010
Lee & Ro City of Industry,
California
City of Ontario Recycled Water Conversion Program. As a
USC Certified Cross-Connection, I have coordinated with
subcontractors and residents to test the water quality and
to verify that there is no cross connection between potable
water and recycled water. Once the testing is complete I
organize the information and water a certified report to
the City of Ontario.
Sewer Investigation for Upper Beachwood Easement Project
Division (WCED), Bureau of Engineering, Department of
Public Works, City of Los Angeles. As project Engineer,
Susan is coordinating with subcontractors and residents to
inspect sewer reaches and locate bends where maintenance
holes will later be installed to better maintain the sewer
reaches.
Secondary Sewer Renewal Program (SSRP), Wastewater
Collection Engineering Division (WCED), Bureau of
Engineering, Department of Public Works, City of Los
Angeles. Project Engineer/SSRP Design Team Member. Since
June 4, 2007, I was b stationed in WCED offices in the
Department of Public Works Building in downtown Los Angeles
and has been performing SSRP project designs using the City
of Los Angeles' SMARTS design tool. She has been assigned
with three SSRP projects thus far: 6.06 miles P18A - Eagle
Rock Blvd., & York Blvd.; 5.88 miles E02 - Ventura Blvd., &
Lankershim Blvd and DAR 01 Hollywood project, 0.30 miles.
She has also received training in Clay Pipe, various types
of lining, remove and replace clay/concrete pipe and
several different types of pipe bursting.
Bitter Point Pumping Station, Newport Beach, Orange county
Sanitation District. Civil Designer for a large pump
station worksite located in a lot contiguous to the Pacific
Coast Highway. I was responsible for designing access,
traffic control, grading and drainage.
24-inch Lineville and 12-inch Elderberry Recycled Water
Pipelines, Inland Empire Utilities Agency, Ontario. Civil
Designer for preparation of plans and profiles for
pipelines and for design of traffic controls and detour
plans.
NOS Rehabilitation, Van Ness to Trinity and NOS-MAZE
Rehabilitation Phase V, Bureau of Engineering, City of Los
Angeles. As Civil Designer, prepared traffic control and
detour plans.
Chloramine Disinfection Conversion Project, Los Angeles
County Waterworks District. Civil Designer for yard piping
for 18 separate disinfection worksites, each consisting of
potable water reservoir(s), booster pump station, and
storage facilities for chlorine and ammonia. Also,
responsible for the design of traffic flow paths for 18-
wheeler entrance and exit.
Civil Designer 2003 - 2005
Russell Garner and Associate Gulfport,
Mississippi
Mississippi Department of Transportation (MDOT) Consultant.
As a designer I was responsible for updating an old
version Microstation files to Version 7 for SR 67 in
Harrison County. Prepared MS Excel cost estimating
spreadsheet template for the permanent sign program.
City of Gulfport, MS. Using AutoCAD 2002 and AutoCAD LDD,
designed the City of Gulfport Drainage project and was also
responsible for quantity takeoffs and cost estimating.
Bridge & Roadway Inspector/ Earthwork Coordinator/
Civil Designer Level 1 1991 -
2002
Department of Transportation of Georgia Savannah,
Jesup & Atlanta, Georgia
Georgia Department of Transportation (GDOT), Atlanta
SR 46 Route Bridge and Road Relocation, Georgia. Lead
Designer for a $14 million Bridge and Roadway Relocation
over Oconee River Bridge and Oconee Overflow River Bridge.
CAICE, MS SE and Hy-8 software were used. Beginning with
topography maps, triangulated coordination points to create
cross sections, determined alignments, and prepared
plan/profiles and erosion controls. Received a
Commissioner's Award among 14 projects competed in 2001.
Georgia Department of Transportation (GDOT), Jesup as
Earthwork Coordinator, calculated in-place-embankment and
unclassified excavation for 27 projects with a construction
value of $65 million. Used CEAL and CAICE software
extensively. Trained field construction crews on earthwork
quantity take-offs and estimating.
Georgia Department of Transportation (GDOT), Savannah As a
field project engineer, managed and inspected bridge and
roadway construction in Savannah
- Tallmadge Bridge, bridge and roadway inspector, assist
project manager
over one Approach Bridge and two ramps.
- Harry S. Truman Parkway, assist project manager over
three bridge three miles of new roadway construction,
canal, five culverts, earthwork, traffic control, 9
subcontractors and responsible for 4 employees. Error
found in survey of culvert, causing a change order and
infield assessment to find error and correct problem.
Once error was found it became a change order and
responsibility included documentation of entire project
in order to correctly access that the work was
sufficient to fix error and the contractor was paid
correctly.
Bullock County, Project manager over 5 detour bridge
projects, located in various areas throughout Bullock
County. Sample and testing, bridge and roadway
construction, erosion control, traffic control, daily
diary, three subcontractors. No employees on this project
to assist, had to access on a daily basis where the work
was most critical and cover all work where possible.
Deanie Frazier Overpass over railroad, bridge and roadway
inspector, 4 employees and 4 subcontractors.
I-95 Widening Phase I, II, III, ongoing 24-hour a day
construction, 17 miles of bridge and roadway widening.
Responsible for training college student, federal audit of
asphalt quantities, bridge and roadway inspection and
drainage pipe.
SUSAN GOULD'S REFERENCES:
David Rubinstein, Civil Professional Engineer, Fluor 281-***-****
Raj Duraiswamy, Civil Professional Engineer, Stantec 780-***-****
William Yin, Civil Professional Engineer, Stantec 780-***-****