Post Job Free
Sign in

Electrical engineer

Location:
Bangalore, KA, India
Posted:
August 17, 2014

Contact this candidate

Resume:

KAMAKSHYA PRASAD SAHOO

Address -*nd room,*st floor Manish niwas, electronic city,Banglore

Mobile: +918*********

*****-*********.*******@*****.***

[pic]

Seeking Middle Level assignments in the areas of Project Management,

Electrical Engineering, and Operations & Maintenance with a growth oriented

organization.

PROFESSIONAL QUALIFICATIONS

Bachelor of Engineering (Electrical) from CSVTU (BIT,DURG) with 61.65% in

the year 2011.

C.G.Board from Beacon English medium higher secondary school with 66,67%

in the year 2004

C.G.Board from Beacon English medium higher secondary school with 61.2% in

the year 2006

Certification course in ELECTRICAL DESIGN ENGINEERING from Smart Brains

Institute of Engineering Design and Research, India.

Academic Project

Project Title- Energy auditing on small scale industry.

Description: The concept of conservation is dynamic, ever changing. In

the past it was less costly to wasteful than to use it efficiently, but

as the price of fuel has risen, the cost of waste has become prohibitive.

Responsibility:

< Electrical Circuit Drawings, Bill of Material, Box type and size,

Front Sticker,Supplier Technical Specification

< Control Panel Testing Procedure, Wiring instructions for the

Production Department

< Preparation of quality documentation like process flow, FMEA, PPAP

documents.

< Preparation of documentation as per quality procedure.

< Logic diagrams, Interconnection drawings for the project department.

SYNOPSIS

< A project manager with expertise in planning, An incisive professional

with over 2.5 years of rich experience in Project Management, Electrical

Engineering, Operation & Maintenance, Erection, Testing and

Commissioning.

< Deft in preparing requisition, specification, data sheet, electrical

system studies, all the SLD's (Single Line Diagrams), block flow

diagrams, layout drawings and all AFC drawings.

< Adept in managing erection & commissioning activities involving resource

planning, in-process inspection, team building and co-ordination with

Internal / External Departments.

< Holds distinction of implementing various techniques for improving the

operations along with energy conservation for cost savings.

< Has updated knowledge of all the Substation Locations, Trench Routings,

Cable Routings, Cable Schedule, Cable Drum Schedule, Cable Termination

Schedule, Duct Bank Schedule, Particular Voltage Specified Cable Splicing

and Termination Kits, Particular Tools, High Voltage Testing Equipments,

Instruments.

CORE COMPETENCIES

-Technical Support Operations Inspection -

Electrical Engineering

-Testing &QA Erection & Commissioning -

Shift Management

- Effective Communicator

- Stores / Stock Management

Function Skills

< Co-ordinating with the Project Manager, Site Engineers for the getting

the Progress of Work, Smooth Execution of Project, Submission of Civil

Bills.

< Carrying out advance planning for resources, manpower deployment and

rendering technical support; ensuring the execution of projects within

time, quality, cost & budgetary parameters

< Ensuring that the equipment supplied are in compliance with approved &

pre-set technical Introducing professional project management practices

and streamlining the critical planning processes throughout the project

life cycle..

< Preparing commissioning schedules in coordination with equipment

supplier, erection agency, testing and commissioning team to match with

the project completion plan.

< Working on succession planning of the workforce, shift management

activities, appraising the member's performance & providing feedback.

ORGANISATIONAL DETAILS

Since Jan'13 Benchmark Trading and Engineering Service as Engineer,

< Preparation of Single Line Diagrams, Load List.

< Transformer Sizing Calculations.

< Generator Sizing Calculations.

< UPS Sizing Calculations.

< Battery and Battery Charger Sizing Calculations.

< Cable Sizing.

< Lighting Calculations Using CGLUX (Indoor & Outdoor).

< Exposure to System studies e.g. - Load Flow, Short Circuit, Motor

Starting on ETAP.

< Earthing Calculations.

< Power Factor Correction Equipment Sizing.

< Knowledge of Hazardous Area Classification.

< Understanding of Various Phases of Projects.

Detailed Task Performed:

< Preparing Of Shop drawing for the project execution, its approval from

the consultant and site coordination with rest of the facility system

< Attending the weekly meetings organized by Client, Construction Manager

and Planning Department.

< Accountable for ensuring that there is no accident in the responsibility

areas and raising IIR (Internal Inspection Request) after each activity

to QC department.

< Erecting and aligning:

< 4 Power Transformers Voltage Rating, 33KV/11KV, 11KV/415V, 2 no of NGR

(Neutral Grounding Resisters) and Bus ducts.

< Different isolated Witch Gear Panels Rating (11KV, 415v), according to

layout drawing and then alignment with Splitter Bus Bar.

< 7 MCC (Motorized Control Centre) panels, 3 lightning panels, 2 HVAC power

panels, 2 instrumentation power panel, annonciator panel, 2 AC UPS with

terminal boxes, DC UPS with distribution power panel and Marshaling

Cabinet as per layout drawing.

< 3 Battery Racks and Battery banks, labelling and acid filling.

< Lightening arresters for the building and connecting it to main grid of

substation.

< Different sizes and types of cable trays (ladder & perforated) with

suitable supports as per NEC 0.2 Standard.

< 4 Nos of MV Panel installation, testing and commissioning of 2500 Amp,

1600 Amp : 3 Nos

< 2 Nos of Stand by Diesel Generator Installation ( 2000 KVA & 1600 KVA)

along with Sound automatic provision

< XLPE Cable Laying of different size and its Voltage drop calculation as

per the site requirement

< Installation, testing & Commissioning of External Lights, street lights

and Indoor Lights as per the project needs

< Pulling different sizes and rating of substation inter loop cables,

through cable trays to respective.

< Gaining knowledge of the basic safety things, including (Roles,

Procedure, Methods, Precautions, Particular work permits for particular

restricted areas, using of proper tools and maintaining clean

atmosphere).

< Imparting safety training to the team members and organizing the tool bar

meeting with safety manager to educate the worker about safety and its

importance.

< Preparing Cross Ferro lings and labelling respective cables for

respective panel.

< Maintaining clean and neat atmosphere inside and outside of Substation.

< Performing day to day activities for Substation and High Voltage XLPE

Cable Pulling.

jan'12- jan13 Radiant cable as Engineer;

Industry: Manufacturing/ Projects

Products: Low, Medium and high voltage Electrical

product

The Role:

< Executing operation, maintenance and troubleshooting of 33KV/440V

substation, that includes (3NOS 2MVA Power Transformer with OLTC, ACB's,

VCB's HT, LT Control Panels, Busbars, Different Relays, Lightning, UPS

and RAW Power Distribution Boards).

< Installation, testing & commissioning of 33 KV & 11 KV High Voltage Line

.

< Handling operation and maintenance of Diesel Generators (1500KVA- 4 NOS

having, ATS (Auto Transfer Switch) from Cummins, which transfers Grid

(Utility Power) to DG (Emergency Power).

< Maintaining:

< UPS (4-NOS 300KVA, 2-NOS 200KVA, 2-NOS 80KVA & 35KVA).

< Supervising operation and maintenance of:

< Fire system with different high rating pumps (Jocky Pump, Hyderent Pump,

Sprikler Pump, Diesel Pump and Boster Pump).

< Organising Energy Preview Seminar every month for client to show monthly

budget expenditure, energy consumption and resolve any technical problem,

etc.

Shift Responsibilities:

< Effectively and timely resolving the complaints; maintaining the power

factor report in excel format and sending these reports to client.

< Maintaining the records like electrical readings, Diesel Consumption, UPS

Readings, HT/LT readings, stock, AMC records etc.

Professional Training

< Attended 30 days training in:

< Training in Chhattisgarh State Electricity Board (CSEB), Korba.

< Training in Chhattisgarh State Power Distribution & Corporation

Limited( CSPDCL), Rajnandgaon

Computer Skills

< Operating System : Dos, Windows

< Language : sql, etap, Auto Cad,cglux

< Office Suits : MS Office & MS Excel

PERSONAL DETAILS

Date of Birth : 21st July 1988

Languages : English, Hindi & Oriya

Martial status : Never married

Strength : Hard work,determinative and

confident

Nationality : Indian



Contact this candidate