Master of Science in Industrial Engineering August 2012 - May 2014
Clemson University, Clemson, SC, USA
Bachelor of Engineering in Mechanical Engineering August 2008 - May 2012
Anna University, Chennai, TN, India
Industrial Experience
Project Intern, Grundfos Pumps India Limited, Chennai June 2013 - July 2013
• Studied the activities involved in the production of Centrifugal Return pumps
• Performed Time and Motion studies and Manpower Analysis for logistics, assembly and testing areas
• Identified Value Added and Non Value Added activites
• Created Current Process and Future Process Maps for Assembly and Testing areas
• Carried out Line Balancing to implement Single Piece Flow
• Implemented new solutions based on ”TIM WOODS” and ergonomic principles increasing productivity of
assembly line by 2 pumps/shift, capacity of testing by 5 pumps/shift and reducing non value added time
in logistics by 30 mins
Project Intern, Bharat Heavy Electricals Limited, Hyderabad April 2011 - May 2011
• Collaborated as a trainee on production planning for a Condensate Extraction pump
• Studied manufacturing processes of Condensate Extraction Pump
• Prepared a production schedule for Condensate Extraction Pump based on Critical Path Method principle
using Microsoft Project software
Relevant Coursework
Graduate Coursework: Engineering Optimization, Supply Chain Design and Control, Transportation and
Logistics Engineering, Manufacturing Systems Planning and Design, Quality in Industry, Quality Assurance for
Automotive Manufacturing Systems, Systems Modeling using Arena, Modeling Systems under Risk
Undergraduate Coursework: Engineering Economics and Cost Analysis, Production Planning and Control,
Computer Integrated Manufacturing, Total Quality Management, Manufacturing Technology
Academic Projects
Automotive Automated Fastening Analysis for BMW March 2014 - May 2014
• Analyzed existing Automated Torquing process for panoramic roof assembly using control charts and
capability studies
• Examined the process stability using Capability Studies and Statistical Process Control
• Investigated the process for dependence and relationship among variables using Time Analysis, ANOVA,
Correlation Analysis and Scatter Plot diagrams
• Constructed Process FMEA and SIPOC charts for automated torquing process
• Generated ideas and provided recommendations to improve the process
Simulation of Rocksoft City Hospital using Arena October 2013 - December 2013
• Developed a simulation model of given problem using Arena
• Analyzed data obtained from the model using OptQuest and Process Analyzer
• Developed staffing schedule and improvized existing plan for surgeries to improve system performance
• Increased the Value Added time in new system by 2.80 % based on the simulated scenario
1
Inventory Analysis of a Textile Company August 2013 - September 2013
• Analyzed the existing inventory control strategies of the firm
• Calculated the existing total costs that included holding costs and ordering costs
• Performed ABC categorization of inventory
• Adopted appropriate inventory control strategies [(Q,r), (S,s)] based on ABC categorization which helped
in minimizing costs by 34%
Development of Insurance Information Systems as per User’s needs August 2013 - December 2013
• Spearheaded the team in developing a product to reduce the effort of users to find insurance information
• Identified need statements using User interviews and usability evaluation of the current system.
• Developed the product in accordance to Ulrich and Eppinger’s ”Product Design and
Development”guidelines
• Refined the new product iteratively using User testing.
Skills
Software: Microsoft Office Suite, AutoCAD, Minitab, Microsoft Visio, Arena Simulation, ANSYS, Pro-E,
Tecnomatix Plant Simulation, Microsoft Project, Microsoft Access
Technical: Value Stream Mapping, Inventory Management,Supplier Sourcing, Six Sigma, Simulation using
Arena, Statistical Process Control, Time and Motion Studies, Kaizen, 5S, ANOVA, Design of Experiments,
Activity based Costing, Cost Analysis, Regression Analyis, Six Sigma
Certifications
Six Sigma Green Belt July 2013 - Present
Center for Excellence in Quality -Clemson University
PG Diploma CAD May 2010 - Present
CADD Centre, Chennai, India
Honors & Activities
Member, Alpha Pi Mu Honor Society, Clemson University Chapter, Clemson, SC January 2014 - Present
Director of Events,Leo Club of SVCE, Chennai, India August 2011 - May 2012
Executive Member,Society of Mechanical Engineers,SVCE Chapter Chennai, India August 2010 - May 2011
2