CURRICULUM VITAE
*. CIVIL STATUS
Name and Surname : NDONG MAWO CHRISTIAN
Date and place of birth : 26 April 1974 at IBONG
Age : 40 years
Nationality : Cameroonian
Marital status : married with two (02) children
Address : PO Box 31299 Yaoundé
Tél. 94950946; 75409651
e-mail: *********@*****.**; ******@*****.***
2. LANGUAGES
LANGUAGE LEVEL
FRENCH Native, mother tongue
ENGLISH Native, mother tongue
SPANISH School level
3. STUDIES
School : UNIVERSITY OF YAOUNDÉ 1
Beginning : 1993
End : 2003
Grades obtained : 2003: Master degree in soil science
2000: Honors in surface geology
1997: Bachelor degree in earth science (Geology)
- 2007: seminar on quality control organized by PERFED II at Yaoundé
- 2006: taking part in a technical workshop at Congo Brazzaville with presentation of the theme
“soil knowledge and its applications”
- 2005: training in the ARP 06 system for soil resistivity survey by GEOCARTA
4. SKILLS AND ABILITIES
- Laboratory test analysis for soils and rocks materials
- Laboratory test analysis for coal tar
- Mix design of hydraulic and bituminous concretes
- Road projector
- Foundation and settlement calculation
Softwares
- Data management (Excel, Access, MS project)
- Text treatment (MS Word, Page Maker, Publisher, Lotus 123)
- Internet and intranet
- Drawing by computer (Adobe illustrator, Corell Draw, Autocad 2010)
- GPS data survey (Magellan, Garmin)
- Mapping by computer (Map Info Professional, Vertical Maper, Pistes, Covadis)
5. WORKING EXPERIENCE
2014: Construction of two electrical stations in SONARA – Limbe (P 105 & P 2)
Sand and gravel studies
Concrete mix design
Concrete crushing (cylinders at 7 and 28 days)
density measurement (soil compaction)
Position: Geotechnical Engineer and Quality control inspector
Company: CAPRO INDUSTRIES, sub contractor of BOUYGUES ENERGIES AND SERVICES
2013: Geotechnical control of paved road maintenance works in the regions of Littoral and South
West Cameroon.
Sand and Gravel control
Concrete mix design
Travail banking
Bitumen and cut-back (0/1; 400/600) control
Monthly reports
Position: Geotechnical Engineer
Company: INFRA-SOL, sub contractor of EGIS Cameroon
2012: Geotechnical control of eleven (11) culverts building along the Mutengene - Limbe road (South
West Cameroon)
Travail banking
Concrete control during work
Concrete crushing (compression and traction)
Road projection
Sand and Gravel control
Mix design of hydraulic and bituminous concretes
Foundation calculation (settlements)
Monthly reports
Position: Geotechnical Engineer
Company: INFRA-SOL, sub contractor of EGIS Cameroon
2011: Geotechnical control of paved road maintenance works in the regions of Littoral and South
West Cameroon.
Sand and Gravel control
Bitumen and cut-back (0/1; 400/600) control
Monthly reports
Position: Laboratory Supervisor
2010: Geotechnical control of paved road maintenance works in the city of Douala (Cameroon)
Sand and Gravel control
Bitumen and cut-back (0/1; 400/600) control
Monthly reports
Position: Laboratory Supervisor
Company: INFRA-SOL, sub contractor of EGIS Cameroon
2009
May – June: Geotechnical studies of foundations for fifteen (15) culverts along the road LOLODORF
– KRIBI – EBOLOWA (Cameroon)
Standard penetration test (SPT)
Search of borrow pits
Sample analysis
Field and studies report
Position: Laboratory Supervisor
Company: INFRA-SOL
February – May: Geotechnical studies of materials from borrow pits along MUYENGUE –
MUYANGUE (21.5 Km), TANGUI – MOMBO (10.3 Km) and EKOMBE – MATOUKE (24.5 Km)
for a total of 56.3 Km (Cameroon)
Soil analysis
Concrete Mix design
Study report
Position: Laboratory Supervisor
Company: INFRA-SOL
December 2008 – January 2009: Foundation studies in order to build 73 culverts in the northern part
of Cameroon
Standard penetration test (SPT)
Search of borrow pits
Sample analysis
Position: Assistant Laboratory Supervisor
Company: INFRA-SOL
2008: foundation studies for Construction of pylons towards Cameroon by MTN Cameroon
Standard penetration test (SPT)
Sample analysis
Position: Assistant Laboratory Supervisor
Company: INFRA-SOL, sub contractor of EGIS Cameroon
2007: Construction of the YAOUNDÉ – KRIBI road (Cameroon)
Gravels identification (6/10 and 10/14)
Bitumen and bituminous concretes analysis
Laboratory Test follow up
Position: Laboratory technician
Company: INFRA-SOL, sub contractor of Arab Contractors Cameroon
2006:
December: Foundation studies in order to rehabilitate the sewage plant of Grand Messa
Standard penetration test (SPT)
Sample analysis
Position: Laboratory technician
Company: INFRA-SOL
January – September: Geotechnical control of extension works for AES SONEL
Travail banking
Concrete control during work
Concrete crushing (cylinders, 7 and 28 days)
Position: Laboratory technician
Company: INFRA-SOL, sub contractor of SADDEG
2005: Geotechnical control of bridge construction in MBANKOLO – Yaoundé
Travail banking
Wood control (quality and quantity)
Concrete control during work
Concrete crushing (cylinders, 7 and 28 days)
Position: Laboratory technician
Company: INFRA-SOL, sub contractor of SADDEG
2004: EMOMBO – NKOMO (Yaoundé) road construction
Travail banking
Gravel quality control
Concrete control during work
Concrete crushing (cylinders, 7 and 28 days)
Position: Laboratory technician
Company: INFRA-SOL, sub contractor of BRECG
6. OTHERS
Sports : ping-pong, footing, football
Hobbies : Music, tourism
I undersign and certify that all the requirements mentioned above are truth as my experience
and qualification is concerned.
Limbe, 4th August 2014