FLUOR RESUME – JERRY ISTRE

E- Mail: **********@*****.*** Phone # 305-***-****-337-***-****)

Citizen: United States

Position: General Superintendent 1 (21) Area Manager

Languages: English

Education: High school

College Courses- Business Administration US Army

Military: US Army

Certifications: Certified HDPE Pipe Welder

Hazardous Waste Trained 40 Hr 10 Hr Supervisory

Hazwoper Trained

Summary of Experience

Construction Management, Construction Safety, Construction, Change Orders,

Sub-Contraction, RFI'S

Over (35) years experience in civil and governmental landfill construction, mining

-

Specific Industry. Oil & Gas projects. Experience in sanitary and medical waste

landfills. Mining, gold and silver leach pads, (roads, building, process)

Petrochemicals, acid and chemical containment, sewage plants, lagoon

containment, and tank farm containment. Held management skills in

earthmoving, D&D projects, concrete structural steel, mechanical, (tanks, valves

and piping and cooling towers) pile driving. HDPE lining systems, pipe lines and

site management, including sales, bidding, layout, and planning of work,

scheduling, procurement of materials, quality control inspection and performance

engineering. Directly responsible for leadership and development of salaried

employee staffs ranging from 3 to 1000 employees.

Contract types include: - lump sum-turn key. Lump sum guaranteed max and cost

-

reimbursable.

Execution approach includes: - Construction Management – Merit and Direct

-

Hire in both Union and Non-union labor postures.

1

FLUOR RESUME – JERRY ISTRE

International Experience includes: - six assignments in the Arctic, for the

-

Canadian Government. One assignment in New Zealand and one assignment in

Jamaica and one in Mongolia.

Work History

Fluor Mongolia (FPMM) 7Billion Dollar Project

Oyu Tolgoi Project Mongolia Camp Site from March 2010 to November 2013

Primary - Responsibility to Manage Civil, heavy earthmoving & excavation disciplines.

Manage - Subcontractors

Manage - Screening and crusher Operations For Sand and Gravel

Manage - Self- perform on other projects (roads & airport.)

Train Team of 300 operators and drivers (trucks, excavators, dozers, etc.).

Infrastructure - To manage site roads, to build pads for office trailers, to build sewage

lagoons, to build up areas for camp site to house 13,000 people.

Onsite (ISBL) - Reclaim tunnels, the pebble crusher, the concentrator area, the primary

crusher, the overland conveyor, the tailings dam, moving the overburden for the open pit

and building haul roads. Drill and blast.

Offsite (OSBL) - Build domestic airport with airstrip 2 km long with taxi ways. Also built

an international airport of concrete and steel and taxi ways and buildings.

Make 70 kilometer road to china, through mountains, which entailed stripping of

-

topsoil and vegetation. Cap with rock and stone. Sourcing barrow pits, layered

stone and blacktop. Road for getting supplies and mine equipment.

Make 125 kilometers road to the north which entailed stripping of top soil and

-

vegetation. Cap with rock and stone and blacktop. Install bridges made from

concrete and install culverts. Make swells for water drainage. Maintain a

satellite camp 100 kilometers distance from the main camp. It was used for fuel

delivery & food

Fluor Global Jan. 2008 to March 2010

Project name: RDA# 5 Uplift Client (Alcoa)

Dates: Jan, 2008 to March 2010

Location: Jamaica

Type of project: lump sum, cost plus reimbursable

Size project: 70mil

2

FLUOR RESUME – JERRY ISTRE

Execution Approach: Program management

Industry: mining

Primary responsible for managing disciplines in the area of civil, Earthworks

-

excavation, concrete and rebar, structural steel, mechanical and HDPE lining

systems. To train local companies to become contractors, in lump sum projects.

To guide them in the disciplines they were awarded bid packages in. Monitor their

progress, and give advice when needed.

Self performed the lining systems for the uplift and small ponds, with a local

-

contractor, this entailed training the crews, purchasing the equipment, and

installing the liner to specifications. In self performing the liner system with a local

crew saved Fluor 1 million dollars compared to using outside contractors. The

lining systems were completed 2 months before schedule end date.

The Istre Company (1988-2007)

Project Manager

Project name: (OSDF) Client (Fluor- Fernald)

Dates: from 1997 to 2008

Location: Ross, Ohio

Type of project: Lump sum/ cost plus reimbursable

Size of project/ TIC: $160M (lump sum-turn key/ incentive contract)

Industry: Government – Department of Energy

Executive Approach: Open shop/ Union/ Cm/ Program Management

Primary responsible for managing the field operations The Istre Company.

-

Coordinate activities with the customer, Bidding, Scheduling, Procurement of

-

Equipment, Safety, Hiring Field Crews for Radiological remediation, building of

landfill, installation of GML lining systems, for Radiology Waste Landfill. The

Landfill was 5280ft, long was 800ft, wide with ten (10) layers of Geosynthetic

materials for cells and caps. The Installation was governed by the rules and

regulations of the USEPA, and the Department of Energy. Other duties included

Quality Control, and overseeing Earth Works, building the landfill until final sub

grade was approved for deploying Geosynthetic. Worked closely with Engineers

to ensure 100% passing rate of all compaction and permeability test. In addition

the Istre Company would subcontract to Earth Work contractors for consulting in

earthworks, GML Installation of Landfill, Goldmines and Sewage Lagoons. To

Install HDPE pipe, for underground leached water and methane gas extraction

systems for landfills.

President Owner

3

FLUOR RESUME – JERRY ISTRE

Project name: GYR Pipe& Lining(Retrofits) Oil & Gas Client (Canadian

Government)

Dates: from 1988 to 1997

Location: Artic

Type of Project: Lump Sum / Cost plus Size of project/ TIC (3.5Mil ea)

Reimbursable / Lump Sum- Turn Key/ Industry (PETROCHEM Incentive Contract)

Execution Approach: (Open Shop/ Union/ CM/ Program Management)

Primary responsible for managing Gyr Pipe and Lining, Coordinate activities with

-

customer, Bidding, Scheduling, Procurement of Equipment, Mobilization and

Demobilization to Islands in the NWT. Hiring of field crews for Tank Farm

Retrofits. Additional responsibilities were safety, and to manage demolition of old

tank farms, moving tanks off site, earth works, excavation, installation of GML,

building tank pads, building of new tanks, pipelines and ship docking stations.

Additional work was to install HDPE pipelines from lakes to villages for portable

water. Worked closely with Engineers to ensure 100% completion on projects.

Worked in inclement weather in temperatures from 32 to minus 60 degrees.

Superintendent

Project name: (Landfills- Goldmines) Company (Gagle Company)

Dates: from 1980 to 1988

Location: US-Canada

Type of project: Lump Sum / Cost plus Size of project/ TIC ($5-20Mil ea)

Reimbursable / Lump Sum- Turn Key/ Industry (Mining& Civil Incentive Contract)

Executive Approach: (Open Shop/ Union/ CM/ Program Management)

Primary responsible for managing the field operations. Bidding, scheduling,

-

procuring equipment, hiring crews, and the day to day operations, for building

landfills, and goldmines. Consulting with engineers, and owners to accomplish

set goals, and time schedules. The building of such projects would be turnkey,

including process piping to refinery, mechanical and linings systems for leach

pads.

4