S e t h T. G ro o v e r
Address **** ***** **** *** *******, TX 78250 ****.*******@*******.***
Cell: 210-***-****
P ROFESSI ONAL PROFILE
U.S. Air Force trained Information Technology Manager and Installation Professional offering a solid
10 year career history of maintenance, managing implementation, and migration of
telecommunications systems projects. Highly effective communicator and cross-functional
technician, organized, detail oriented, self-motivated, and able to secure project buy-in and support
from personnel at all organizational levels. Diversified experience includes classified and
unclassified telecommunication, project implementation, and structured cabling system,
inside/outside plant construction, training, and quality assurance. Currently holds a TS/SCI Security
Clearance with Polygraph.
Core Competencies/Professional Strengths:
Local/Wide Area Networks Fiber Optic Infrastructure Integration/Design
Personnel Oversight/Supervision Electronic Systems Telephone Systems
PROFESSIONAL EXPERIENCE
UNITED STATES AIR FORCE, 2004 – 2014
Installation Specialist, Engineering & Installation, 9/2008 -Present
Advised and completed telecommunications maintenance and installation actions in direct support of global signal
intelligence missions for United States Air Force, Federal Intelligence Agencies, and Department of Defense.
Completed $12 million communication installation project at NSA Texas. Installed three million feet of
fiber optic/copper cable to a 600,000 square foot multi-level complex with 3,000 work stations and over 800
communication equipment racks in three data centers and twenty-six transport rooms.
Completed network expansion of over 1,000 fiber optic and CAT-6 circuits for increased personnel billets at
Naval Signal Communications Station, Hawaii, allowing 100 plus new workstations for an overall 15%
increase in workflow.
Organized and maintained $500,000.00 worth of tools and test equipment to ensure resources are available
for worldwide projects.
Trained over 20 new personnel on the latest technology and methods on rack installation, fiber/copper cable
management, termination, splicing, testing, and troubleshooting as well as flex tray installation practices and
grounding principles. Reduced down time from errors during testing and quality insurance inspections by
20%.
Team Lead, Cable Maintenance and Antenna Systems, 4/2013–11/2013
Lead a four man team in a telecommunication shop that oversees maintenance, installation, and quality assurance of
all communication infrastructures on Al Udeid, AB in direct support of Operation Enduring Freedom.
Provided extensive technical knowledge in over thirty communication projects, and 130 work orders
ensuring on time completion and minimum network down time for high value customers.
Developed, implemented, and maintained Personal Wireless Communication System (PWCS) program for
over $150,000 worth of cell phones and land mobile radios to 86 customers ensuring quick access to
communication for decision making personnel.
Conducted inspections on six major communications installation projects totaling over $4 million in
equipment and labor costs ensuring correct standards and practices were being used from foreign
construction companies.
SETH T. GROOVER PAGE TWO
Technician, 8/2006 - 8/2008
Provided IT solutions, maintenance, fault isolation, and cable location for United States Air Force European
Command on Aviano AB, Italy.
Conducted over 200 cable locates/marking for excavation permits for contractors and DoD agencies
ensuring minimum service downtime from damaged/cut cables.
Prepared IT solutions for new LAN requirements for base customers/agencies providing efficient and timely
network access for day to day business activities totaling over $300,000 worth of project material
Installed a 144 strand fiber optic cable to expand WAN capabilities and future use for $5,000,000
communication projects.
Technician, 6/2005 – 8/2006
Installed, maintained, reconstituted, removed, and modified coaxial, waveguide, copper core, fiber optic cable, and
antenna systems. Installed underground cables, used duct rod, cleaned cable ducts, prepared pulling apparatus, and
pulled in and temporary bonded cable.
Located and repaired vital 72 strand fiber optic cable that was cut during contractor construction project.
Restored all radar functions in less than 6 hours.
Installed 1800 pair copper cable to new munitions storage facilities increasing alarm circuits, telephone
lines, and network capabilities by 75%.
Surveyed and advised on six new communication projects for renovated housing network, new child
development center, and new entry control point totaling $7,000,000 in project materials and over 5 miles of
cable installed.
EDUCATION
6 Credits away from Electronic Systems Associates Degree
Cable Maintenance and Antenna Systems Technical Training (USAF), 2005
Light Brigade Fiber Optic 1-2-3 Certification, 2006
Professional Development Highlights:
Airmen Leadership School (USAF), 2010