Synopsis
> B.Tech in Polymer Technology (MK University).
> SAP Functional Consultant with 11+ years of total experience, including
9+ years of SAP experience specializing in APO Demand Planning, SNP,
PP&DS, Production Planning (PP - PI) Material Management (MM) and Quality
Management (QM) with strong knowledge in Warehouse Management (WM).
> Experience in Three end-to-end implementation & Roll outs, and Multiple
Support Projects.
> Experienced in all phases of the implementation projects, from Project
Preparation, Blueprinting, Business Process definition, Configuration,
Testing, End-user and Project-team training, Go-live and Production
support.
Skill Set in SAP APO, PP, QM & WM
APO Demand Planning:
> Configured Planning Object Structure,
Periodicities Storage Bucket Profile, Planning
Areas, Time Buckets Profile, Planning books,
Data Views, Forecast Profile, CVC's,
maintaining Time Phased Horizons.
> Configured and designed the disaggregation and
aggregation logic based on proportional
factors at the Planning Area level and at the
Planning Level by maintaining calculation of
Proportional Factors
> Created Advanced Macros in Planning Book and
the Data View level at different stages to
facilitate the existing Forecast Calculation
> Created Alert macros for facilitating Demand
Planner to use management by exception
> Provided business procedure/definition steps
to the Demand Planners including running
Planning in background and releasing the time
based forecast data from DP to SNP, PPDS and
ECC.
> Conducted Work Shop on Data Realignment.
> Worked on several SAP OSS notes to resolve and
develop specifications to enable and support
necessary customer requirements gaps
> Provided training to Demand Planners on Demand
planning interactive table, different views of
Univariate Forecast in interactive planning
using drill down at characteristic level such
as APO location and APO product and also on
KPI comparison by APO Location and APO Product
> Provided training on analyzing functions of DP
interactive planning table such Pivot sorting,
distribute function
> Worked with DP BOM Concept
> Worked with Annual Operative Planning and
Strap Planning
> Worked with Process Chain creation for various
nightly Jobs.
APO PP & DS:
> Configure change transfer for master data, maintaining distribution
definition to publish results from APO.
> Setup to Transfer of required master and transactional data
> Generation of Product Data structures (PDS) as master data via CIF.
> Master data setup for detail scheduling processes like single
activity, multi activity resources. Capacity profiles, Production
calendar
> Design Conversion rule for ATP check for planned orders to process
orders conversion in APO.
> Conversion of SNP plan to PPDS plan.
> Maintain work areas, time profiles, Propagation ranges, strategy
profile, detail scheduling planning board profiles, heuristics
profile, overall profile,
> Setting up Global parameters and defaults as per business requirement.
> Familiar with low level code determination, planning file entries and
pegging areas.
> Design of custom Product heuristics & Scheduling Heuristics for
specialty material's production planning and detail scheduling.
> Having knowledge to impart training on DS Board for reschedule and
capacity leveling of finite resources.
> Detailed knowledge on complex features of interactive scheduling on DS
Board.
> Set up of scheduling sequence heuristics with custom characteristics
like primary material, CAD Drawing & Wafer size,
PRODUCTION PLANNING:
> IMG activities related to PP Module.
> Configuring PP Master Records, viz., Material Master, BOM, Routing, Rate
routing and Work Centers and Production Resource Tools.
> Sales & Operations Planning (PP-SOP): Creation of Product Groups, Sales
Plans, Production Plans, Disaggregating the plans.
> Master Planning (PP-MP): Demand Management - Defining Planning
Strategies, creation of planned independent requirement (PIR) and
Customer Requirements.
> Master Production Scheduling (PP-MP-MPS) and MRP (PP-MRP) - Various
planning methods, total planning at plant level, single item single
level, foreground/background mode, planned orders, and conversion of
planned orders.
> Production Orders (PP-SFC): Creation, integration for planning, order
release and printing. Carrying out material staging, order control,
confirmations and goods issue/receipts and Order Settlement.
> Create Master Recipe, Resource, Production version, Process order
creation, Process order confirmation.
> Customizing: Setting up planning calendar, quota arrangements, lot-sizing
procedure, MRP areas, order types and order type dependent parameters,
production scheduling profiles, Defining Operation Control Keys, Trigger
points and settings for availability checks
MRP:
> Various planning methods, total planning at plant level, single item
single level, foreground/background mode, planned orders, and conversion
of planned orders.
> Configuring MRP for Consumption based planning (MM-CBP): Reorder Point,
Forecast based planning. Configuring Lot Sizing Procedures to be used in
MRP.
WAREHOUSE MANAGEMENT
> Configuring Storage Types, Sections and Bins. Defining Put away and Stock
Removal Strategies.
> Setting up of Material Masters for Warehouse Management.
> Configuring Transfer Requirement Types and WM Movement Types. Setup of
Auto TO creation.
> Configuration setup for Confirmations, Physical Inventory and Print
Control. WM integration with other modules, especially with MM-IM, PP and
SD modules.
> GR and TR creation with and without Inbound Deliveries. GI and TR
creation for outbound deliveries, picking for production supply.
QUALITY MANAGEMENT:
> Setting up Material master for Quality management view.
> Create Inspection lots, Result recording and Usage Decisions
> Setting up Sampling Procedures, Dynamic Modification rule, Master
Inspection characteristics, Inspection Method and Insp Plans/Task Lists
(Q).
> Configuring Inspection Types, catalogs, Insp Characteristics, and
Inspection Method.
> Configuring Control Keys.
> Quality Notifications.
MATERIAL MANAGEMENT:
> Setting up Master data such as Material master, Vendor master, Source
List.
> Create Purchase order, scheduling agreement, Subcontracting Purchase
order, Stock transfer order and delivery.
> Developed a new program to replicate the material master data from one
plant to other plants.
CROSS MODULAR
> Experience with LSMW, CATT for migration of legacy data into SAP.
> Worked with Sales Order BOMs.
> Strong Cross-modular integration between QM, PP and WM modules and also
with MM module.
SAP Experience
NTT Data
Client: Honeywell - Specialty Materials
10/2010 - till date
Honeywell is a global company; they are into many businesses including
Aerospace, Automation and Control system, Specialty Materials,
Transportation systems. We are supporting mainly for Specialty materials,
here they are manufacturing additives, Advanced fibers and composites,
Fertilizer, electronic material, Resins/plastics, specialty gases etc,.
Project: APO DP Implementations
> Implemented and Rolled out APO DP Process for Specialty Additives
Business
> Rolled out DP for Health Care and Packaging Business
> Implemented Price pull from ECC Condition Records to APO DP for
Revenue Calculation Purpose
> Completed Realignments Project for NEW GL Changes
> Implemented Period Shift Concept to provide proper Lead time for
Shipping Date and Billing Date from original DP Plan which is based on
Customer Requested date
> Rolled out DP Process for Gas Membrane Business Line
> Worked on Implementing DP BOM to capture Precious Metal forecasting
and Revenue
> Implemented Best Fit Statistical Forecasting Method for all Honeywell
Business Lines.
Project: PP & DS Roll out and Support:
> Rolled out PP & DS for Spokane Plant which is producing all critical &
highly pure metals materials with Copper, tin, titanium & Gold and
Silver
> Setting up custom alerts & analyzing Alerts and resolve the issues to
maintain KPIs.
> Lot sizing procedures & PPDS horizon, Pegging and alerts settings.
> Generation of all Master Data like PDS, Product etc through CIF
> Configure change transfer for master data, maintaining distribution
definition to publish results from APO.
> Maintain Planning areas, Planning Books, time profiles, Propagation
ranges, strategy profile, detail scheduling planning board profiles,
heuristics profile, overall profile,
> Design of custom Product heuristics & Scheduling Heuristics for
specialty material's production planning and detail scheduling.
Project: PP, QM and APO Support:
> Creation of LTP Version, LTP Load, Capacity Leveling and reporting
> Configure Variant Configuration for Slitter Process
> Configuration done for Material Level Batch Management for Final GR as
well In house Production
> Worked on Process Message and Process Sheet which integrated with PIMS
third Party tool.
> Worked on various zprogram developments, enhancements and Performance
tuning.
> Worked with Various Business Function Activation and Implementation.
> Worked with Shop Papers, Scripts and Bar Codes
> Worked with CIF and SNP as Support Project
> Monitoring Daily CIF Jobs, CCR, CQ reports and Reconciliation
Project: QM CAPA Implementation & LIMS Interface
> Configured and Implemented different Notification types for QM
Complaints
> Implemented Notification for SCAR (Supplier Corrective Action Report)
for Purchase Orders.
> Implemented Notification for CCAR (Customer Corrective Action Report)
for Sale orders
> Implemented Notification for ICAR (Internal Corrective Action Report)
for In house Quality issues
> Implemented Interface with SFDC to generate Notification through SFDC
Case automatically and the Corrective Actions will be updated back
into SFDC
> Configured and Rolled out QM Module for multiple sites
> Worked on Interface development to Send Inspection Data to LIMS and
update MIC and UD Back from LIMS in SAP
Project: MRP Excellence
> Changed Master Data to excel the MRP Planning
> Changed and reloaded Master Recipe, BOM and Material Master Data
> Developed new Reports for SIOP Review meetings.
Patni Computer Systems
05/2008- 10/2010
Project: Motorola
Motorola is a global Communications and mobile manufacturer for more than
80 years. They are mainly into the mobile, Bar code Scanner, Cellular
Networks business. I am working here as a PP and QM Consultant providing
project support.
Role: SAP PP & QM Consultant
Environment: SAP ECC 4.6 B
Project Responsibilities
> Dealt with issues relating to planned orders, Production orders, Material
Requirement Planning, Back flush and confirmation.
> Worked on BMC Remedy tool to track the Incidents, Change Request and
Problem tickets.
> Dealt with weekly status report and Monthly MPR report and presenting PPT
to the client.
> Successfully done a new hub short vendor report development which is
having interface between Supplier website, UNIX file, SPAN server, ZOM
output by coordinating with ABAP.
> Setting up and maintenance of Materials Masters, Bill of materials,
Routing, Work center.
> Helped users with setting up MRP for Consumption Based Planning, such as
maintenance of MRP type, lot sizing rules, planning strategy groups and
reorder points. Configuring of Special Procurement keys.
> Monitoring of PP Batch Jobs.
> Worked on issues relating to Interfaces, resolving problems with IDOCs.
> Worked on several reports for enhancements and changes. Enhancements and
changes to several standard SAP functionalities, such as addition of tabs
to the selection criteria and output of the report. Developing new
reports as per the business requirements.
> Worked on resolution of high and medium impact tickets and incidents
making sure service level agreements were always met.
> Worked on Enhancement Change Requests for P2P and P2M tracks involving
configuration changes, program changes as well as smart forms and sap-
script changes. Also worked on routine maintenance tasks, break fixes as
well as emergency Change Requests.
> Preparation and updating of Functional Specifications.
> Coordinated the work with the onsite and the offshore teams. Interacted,
coordinated and worked with the business, the PSTs and various Functional
and Technical tracks for resolution of issues, tickets and incidents and
as well as completion of Change Requests.
> Knowledge on PP- PI Process order creation, confirmation and settlement.
Perlos Telecommunications (I) Pvt Ltd - Engineer Molding
Client: Perlos Telecommunications Nokia Park, Chennai
07/2007-04/2008
Perlos Telecommunications, A Joint Venture Company with Lite On, Taiwan.
One of the biggest MNC in the Mobile parts and electronic components
manufacturing field, Europe based company. They are supplying the Mobile
and electronic parts to the Nokia, Sony Ericson, LG, Samsung, Motorola,
etc, With Global footprint all over the world more than 10 plants are
there. Current SAP Version 4.6 B
Role: SAP PP Consultant
Environment: SAP 4.7
Project Responsibilities
> Customized the Material master for specified material types with views
required.
> Configured and created Material master, Bill of Material, Work center,
Routing, Production Versions, Labor capacities and Work center Hierarchy.
> Exposure to Variant Configuration in PP Module.
> Gap analysis was done & workarounds were devised wherever feasible.
> Master data building was the Key activity. Material Master, BOM,
Routings, Work centers - the basic data that were relevant to PP, was
generated.
> Gap analysis was done & workarounds were devised wherever feasible.
> Training the users on the system and its Processes.
> Selection of different MRP strategies like MRP, Consumption based
planning, No Planning etc...
> Planning runs like net change planning, net change in the planning
horizon.
> Creation and Maintenance of Material master data like Material Master,
BOM, Routings, and Production Versions.
Watertec Systems India Pvt Ltd - Engineer PPC
03/2005-06/2007
Watertec are the Pioneers in the manufacturing of International Quality
Bathroom Fittings and Accessories in Engineering Polymer for the past 2
decades. Watertec is a grand success in India, Malaysia with a market share
of more than 40% and more than 60% in Maldives and is a very popular
product in the South Asian Countries. Watertec India has more than 2000
dealer network across India. It has taken the fullest advantage of the
brand equity of UMS Group India and Watertec Malaysia.
Role: SAP Implementation Core Team Member
Environment: SAP ECC 6.0
Implementation Responsibilities
> Involved in mapping various business processes from the current AS-IS
system to the required TO-BE system.
> Responsible for configuring the Master data: Material Master, Bill of
material, Routing and Work center. Configured PP module for different
planning strategies.
> Mapped Current Business Processes (Legacy system) related to planning,
MRP, Goods Issue, and Goods Receipt into SAP with customization
/configuration for Production planning and its integration with MM and
QM.
> Configured consumption based planning for automatically creating planned
orders and Inventory based Purchase orders.
> Post implementation production support to the user specific problems and
issues depending on the new business procedures and enhancements with on-
going roll outs.
Solutions Implemented:
> Material Reconciliation through capture the Runner a part of production
by introducing the Co Product as such as By product to capture the Lumps
which is wastage of the process.
> Production Version introduction to capture the exact material and type of
coloring agent used.
> Consumption of co product as a BOM Material by introducing recursive ness
function process, part of
CIP /cost saving.
Functional Experience
Agni Plastics Pvt Ltd, Namakkal
03/2003-02/2005
Operations Engineer
Agni Plastics is a leading plastic injection molded components
manufacturer, job work for TVS, Mallya groups and electro link.
Production Planning and Inventory Management
> Planned production and maintained inventory as per economic order
quantities for components with known constant demand. Carried out demand
management for items with uncertain demand patterns.
> Developed master production schedules stating specific production goals
by product and time period as per the production plans.
> Reduced inventory cost by 15%, by reduction of excess and obsolete
inventory and improved inventory turn over.
> Managed the day-to-day operations in inventory and work in process.
> Shop floor work scheduling & monitoring, controlling goods movement
> Adopted continuous process improvement and on-line statistical quality
control tools to improve productivity
> Implemented Lean, SMED, 5S practices
> Monitoring & improving Machine Efficiency, Utilization, OEE, & Material
Utilization
> Exposure to TPM,5S,SPC,Global-8D,PDCA cycle and PFMEA Concepts and
implementation
> Production Planning and Control of Operations and Material Requirement
Planning.
> Ensuring smooth operations including shift management to maintain
productivity.
> Effective man management, Timely execution and extraction of work from
operators and shift in charges.
> Wastage control.
ISO 9001:2000 Certification
> Developed process control standards for the items being produced.
> Created and maintained production line visual aids and processes as per
ISO 9001 standards.
Manufacturing Process Design
> Implemented process design employing Single Minute Exchange of Dies
(SMED), resulting in the reduction of forging die setup times from 2
hours to 25 minutes.
> Increased the production capacity from the units 343221 to 431128 (20.43
%) within a period of 1 year in Injection molding
> Maintain the Production status to 90+ % for the last 1 and Half years
continuously.
> IM machine OEE at around 84% continuously.
> In house rejection level as under 1.5%.
Training Programs
Organization Topic Year
NTT DATA APO CTM Implementation 2013
NTT DATA APO SNP Implementation 2012
NTT DATA APO PP & DS Implementation 2011
NTT Data APO DP Implementation 2011
Patni Training on WM Module Implementation 2009
Perlos Six Sigma Green belt training 2008
Perlos Lean Manufacturing 2007
Perlos Material flow Management 2007
Water Tec 7 QC tools 2006
Water Tec ISO Awareness, Internal Auditor Training 2005
CIPET Trouble Shooting & Machine Maintenance 2005
CED Training for Entrepreneurship Quality 2001
CLHRD Personality Development 2002
Water Tec Implementation of 5 'S 2006
Water Tec SAP Production Planning 2004
Educational Credentials
Madurai Kamaraj University, India
03/1999-03/2003
B.Tech in Polymer Technology
Contact Details
Phone: +1-312-***-****
Email: **********@*****.***
References
> References available on request.