Post Job Free
Sign in

Customer Service Safety

Location:
Mt Prospect, IL
Posted:
July 14, 2014

Contact this candidate

Resume:

Jason J. Stack

**** ******* **** ****

Mount Prospect, Illinois 60056

847-***-****

*****.********@*****.***

OBJECTIVE:

A leadership position in the construction industry where my

"hands on" management abilities, technical knowledge,

organizational talent, customer service and communication skills

can be effectively utilized to improve operations and contribute

to company profits.

EXPERIENCE:

2013-Present MasTec Network Solutions

1351 E. Irving Park Road

Itasca, IL 60143

As Safety Training Instructor, I am responsible for ensuring all

office and field personnel are compliant with OSHA regulations,

company policies and customer standards. Provide training classes

to include OSHA 10 hr., OSHA 30 hr., First Aid, CPR & AED, RF

Awareness, Tower Operations and Rescue and customer specific

courses.

2012-2013 Communication Builders Inc.

480 Randy Road

Carol Stream, IL 60188

As Foreman, I was responsible for providing oversight and

direction to field teams in assembling, installing, fabricating,

and maintaining telecommunications towers and antenna systems in

accordance with product specifications and customers set

standards.

2012. Comtech Communication Technologies Inc.

545 Busse Road

Elk Grove Village, IL 60007

As Safety Coordinator, was responsible for keeping current with

OSHA regulations and integrating said regulations with company

policy. Developed and performed tower safety training and

certification programs for field staff. Organized purchase of

safety equipment that satisfies both OSHA safety standards and

company budget requirements.

1998-2011 Divane Brothers Electric Company

2424 N. 25th Ave.

Franklin Park, IL 60131

847-***-****

As Foreman, was responsible for providing oversight and direction

to field teams in assembling, installing, and maintaining

telecommunications towers and antenna systems in accordance with

product specifications and OSHA safety parameters. Performed all

aspects of tower construction and installed all types of antennas

with associated coax/line, mounts and hardware. Swept the

coax/line to customer specifications, installed tower lights,

tower grounding, plumb and tensioning, troubleshot and resolved

tower maintenance and emergency issues.

1990-1998 Stann and Associates Inc., Communication Towers

105 Murphy Lake Road

Park Ridge, IL 60068

847-***-****

Specialized in the erection of guyed and self-supporting towers

with proficiency in transmission line and connector installation,

site testing, and path alignments. Developed excellent

proficiency in blue print reading.

EDUCATION:

Roosevelt University

B.A. City Planning/Environmental Studies, 1998

CERTIFICATIONS:

United States Department of Labor:

OTI 510 OSHA Standards for Construction Industry, 2013

OTI 500 Trainer Course in OSHA Standards for Construction

Industry, 2013

Safety and Health Council of North Carolina:

MESH, Construction - Manager of Environmental, Safety and Health,

2013

Com Train LLC:

Advanced Tower Climbing Safety and Rescue, 2009, 2011, 2013

Certified Tower Climbing Safety and Rescue Instructor, 2009,

2011, 2013

Certified Tower Climbing Safety and Rescue, 2006, 2011, 2013

National Safety Council:

First Aid, CPR & AED Instructor, 2013

First Aid, CPR & AED, 2013

Flagger Trainer, 2013

CITCA:

Certified Tower Climbing, 2012

Dragon Wave:

Installer Certification Course, March 2010

Construction Safety Council:

Qualified Crane Signal Person, 11/16/2010

Rigging Hazard Awareness, 11/16/2010

Anritsu Site Master:

Line Sweep Certification Class 1 Port

OSHA:

10 hour and 30 hour for Construction Safety and Health

PPC: Certified Wireless Connector Training for ", 7/8", and

15/8", 2010

ACCOMPLISHMENTS:

Verizon Wireless, Illinois locations (2012-2013)

Installed and up graded sites to 4G LTE throughout Illinois.

US Cellular, Illinois locations (2012)

Led a project throughout Illinois and Wisconsin which entailed correcting

site deficiencies to meet customer, safety, and industry standards.

AT&T, Illinois locations (2011-2013)

Installed 4G LTE co-locates for AT&T on several sites throughout Illinois.

Installed fiber optics, coax, power, and relevant equipment at each site.

Clearwire, Illinois and Indiana locations (2010)

Installed co-locates for Clearwire on several sites throughout Illinois and

Indiana, replacing 3G antennas with 4G and microwave antennas for the

upgraded network. Installed fiber optics, coax, power, CAT 5, and relevant

equipment at each site.

Alltel Wireless, Webster, WI (2009)

Built a 200' monopole for Alltel and installed transmission lines,

antennas, grounding, and an ice bridge from tower to building.

Illinois Toll Way Authority, I-294, I-88, and I-80/94, IL (2007-2009)

Installed CCTV camera systems along the Illinois Toll Way from Indiana to

Iowa. Aligned camera communications by installing antennas and fiber

optics on 50' light poles and Toll Way Authority towers.

McCormick North Security 911 Command Center, Chicago, IL (2006-2007)

Assisted in the demolition of the old command center and traced out all

communication lines that were installed in the new center. Spliced in

temporary communication lines for a portion of the command center that

remained open during construction. Installed CAT6 voice and data, tested

and installed RG6 and 11 coaxes, and fusion spliced multi-mode fiber optics

for hubs that were routed through the new command center. Installed cable

management system in a raised floor which connected the command center to

the equipment room. Installed fire alarm visuals, smoke detectors, and

HVAC sensors. Installed cabling for card access and door locks in door

frames. Provided technical assistance to Johnson Control in trouble

shooting communication issues. Designed layout for voice, data, and fiber

optics communication closet in new command center.

Illinois Toll Way Authority, Communication Tower Erections (2001-2007)

Erected towers at plazas 15, 41, and 61 and installed all antennas. On I-

355 expansion erected towers at 127th and 167th St.

Indiana Department of Transportation, I-80/94 and I-65, IN (2002-2006)

Terminated microwave antennas and path aligned dishes from site to site,

trouble shot errors in equipment, assisted in the installation of DMS

signs, linked signs to towers via antennas, and assisted in the

installation of cameras on all towers.

Indiana Department of Transportation, Indianapolis, IN (2003-2004)

Erected 13 Pyrod communication towers around I-465 and I-65 to support the

traffic management system for metropolitan Indianapolis, IN. Installed

microwave antennas, cameras, grounding systems, and path aligned all sites.

Illinois State Police, Pontiac, IL (2003- 2004)

Erected a 400' Rohn guyed tower and installed 22 antennas. Once completed,

dismantled existing self-supporting tower utilizing a cutting torch, and

removed existing 300' Rohn guyed tower.

Chicago Water District, Jardine Water Plant, 68th St. and Dever Water

Intake Cribs, Chicago IL (2002-2003)

Linked 68th St. water intake crib to Dever crib via multi-polarization

microwave antennas which communicate back to Jardine water plant.

Installed infrared cameras and a new grounding system around the cribs

including the chimneys. This project was accomplished utilizing a

Department of Homeland Security Grant and access to the sites required a

security clearance.

Illinois Department of Transportation, Hillside, IL (2001-2002)

Erected communication tower to 340' with a crane and completed tower

erection to 450' utilizing a helicopter. Installed HP microwave antenna,

retractable camera system, and mounts for future antennas. Completed

grounding halo for entire site.

Illinois Department of Transportation, Schaumburg, IL (2002)

Erected a 260' Cellxion self support tower and installed an 8' HP microwave

antenna. Completed grounding halo system for entire site.

Illinois Department of Transportation, Nordic, IL (2002)

Erected a Cellxion self support tower and installed 8' and 6' microwave

antennas. Completed grounding halo system for entire site.

Cellular Phone Tower Sites, throughout Illinois and Wisconsin (1998-2001)

Customers included AT&T, Sprint, Primeco, Voice Stream, Metracom, and

Spectra Site. Erected self-support towers, slip-joint and flanged monopoles

manufactured by Pyrod, Rohn, Cellxion, Saber, and Andrews. Installed

grounding halos around buildings and towers utilizing Cadwelding.



Contact this candidate