Eric Anthony Hohla
Huntington Beach, CA 92646
******@*****.***
EXPERIENCE
UPS Freight, Fullerton, CA
March 2006 - Present
Region IE Planning Manager, Pacific Region
. Manage industrial engineering responsibilities for 51 facilities in
metropolitan and rural areas of 13 Western states.
. Forecast freight volume and perform equipment utilization
analysis to determine staffing and equipment needs based on peak
and seasonal trends.
. Implemented delivery planning system resulting in 4.5%
improvement in productivity from 2011 to 2012.
. Subject matter expert for territory planner, delivery planning
system and appointment system for most help needed terminals
resulting in a 2012 to 2013 YTD improvement of 4.3% in P&D
production and 2.7% in dock production.
. Designed and implemented mini-hubs in Fresno and Commerce, CA,
helping to provide next day service between 25 terminals
throughout California and Nevada.
. Created and implemented operating plans for six terminals during the
integration of Overnite Transportation Company and Motor Cargo into
UPS Freight, helping reduce transit times on more than 9,000 lanes
while improving service and productivity levels.
. Consolidated multi-terminal operations in Bakersfield, Las
Vegas, Salt Lake City, Phoenix, Reno and Fresno resulting in
yearly savings of $4.6 million.
. Consolidated outbound operations in Portland and Sacramento into
single terminals resulting in yearly savings of $600,000.
. Created operating plans new facility openings in Lathrop and
Chula Vista.
. Restructured transportation network effecting 14 facilities in
the Los Angeles Basin to prevent facility that would have cost
$25 million to be built.
. Restructured transportation network effecting 10 facilities in
Northern California resulting in yearly savings of $1.3 million.
EPICO, Lake Forest, CA
July 2004 - September 2005
Systems Engineer
. Created sales lead database system.
. Performed business process reengineering on all functions and
implemented efficiency system which reduced annuity processing time by
50% while reducing workforce by 15%.
. Managed 30 people and directed financial decisions.
Bio-Orthopaedic Laboratory/Footcomfort, Costa Mesa, CA
June 2003 - July 2004
Industrial Engineer
. Used statistical process control on production rates and defects.
. Redesigned and consolidated facility using lean techniques to reduce
building and utility costs by 50%.
. Designed and implemented database system which reduced Birkenstock
backorder time by 50%.
United Parcel Service, Anaheim, CA
June 2002 - September 2002
Time Study Observer
. Conducted time studies to determine improvements to route schedules.
. Performed analysis to determine new schedules based on cost and time
restraints.
. Won award for Best Time Study Observer Intern, South Cal District.
EDUCATION
University of San Diego, San Diego, CA
May 2003
Bachelors of Science/Arts in Industrial/Systems Engineering
GPA: 3.04
Institute of Industrial Engineers Member
Computer Skills
Microsoft Office, Access, Visual Control Room, Minitab, DPS, Territory
Planner, ITEMS, PREA