Post Job Free
Sign in

Project Manager Sales

Location:
United States
Posted:
July 03, 2014

Contact this candidate

Resume:

Michael E. Johnson

**** ******* ******

Dillon, SC. 29536

843-***-****

**************@*****.***

Primary objective is to meet customer objectives while minimizing

manufacturing cost and corporate investment.

Professional experience

Masterack- Atlanta, Georgia 2004-2013

Production Planner / Assembler Scheduler:

. Managed/supervisor of assembly area.

. Plan, analyze and implement CVP customer demand for assigned

production shop.

. Ensure parts and materials are available to accomplish tasks.

. Plan for CVP catalog sales and Kanban levels.

. Conduct meetings with engineers, manufactures, purchasers, and

sales representatives to ensure that Build of materials where

correct.

. Review CVP demand and make decisions to release, cancel, or

defer work based upon current inventory, demand, capacity and

material availability.

. Implement manufacturing techniques into production.

. Understand and facilitate the use of Kanban's waite /work board

and method sheets to ensure the highest quality and linearity

are attainable to production in-flow manufacturing environment.

. Communicate with vendors to ensure all issues are quickly

resolved to maintain optimal customer services.

. Plan and manage day to day work flow on assembly line.

. Also plan manage day to day work flow on paint line.

. Manage plating and a secondary paint company.

. MRP/ERP/ISO.

. Performed research to avoid all material shortages that may lead

to production shutdown.

. Forecast production schedules with optimal utilization of

materials and labor.

. Coordinated with supervisors to assign status to all projects

each morning and go over daily schedulers.

. Determined appropriate manufacturing sequences and lead times

for all operations.

. Maintained records of all engineering activities for continuous

improvement process.

Highlights:

While working on daily shortage reports and meeting an aggressive

production schedule, I also resolve manufacturing processing issues that

affect customer ship dates.

Kemit Communication- Atlanta, Georgia 2002-2004

Network Engineer:

Provided systems and help desk support including software/hardware

installation, maintenance, upgrades, troubleshooting, and user account

administration.

. Installed rack mounts and Enthernet (802.3) cabling to improve

infrastructure.

. Configured Protocols (TCP/IP) and NW Links; IP Addressing;

Installed and Configured Printers; Installed Thin net Clients.

. Analyzed business and technical processes; recommended solutions

to streamline, automate and improve day-to-day use.

. Maintain proper documentation, as required by the Support

Supervisor or DSS Manager, to properly track the status of all

service calls.

. Assisted the Help desk by providing prompt response to users and

maintained an inventory of installed and reserved equipment.

. Create painting and packing templates on a daily basis to

facilitate daily and weekly work Schedules.

Bondo/Mar-Hyde- Atlanta, Georgia 1999-2000

Contractor Systems Adm./HP9000/Programmer

Homecom Communication- Atlanta, Georgia

Contractor Systems Adm. /Unisys A-Series

Caterpillar- Joliet, IL.

Contractor Systems Adm. /HP9000

American Computer Technology- Atlanta, Georgia 1990-1999

A computer firm that acquired information Technology contracts throughout

the world.

Telecommunication/Project Manager:

. Coordinated and installed data networks throughout the state of

Georgia. Provided on-site applications training and technical

support. Provided installation of IBM/Telex controllers,

General Data Comm modems and hubs state-wide.

Project Manager/System Administrator: Lagos, Nigeria

. Installed Unisys U6000, UNIX Mid-range system for the National

Insurance Corporation of Nigeria. Provided on-site training and

support. Programmed and altered COBOL programs for solutions to

business problems.

Project Manger (Banner)/MIS Director (Contractor):

Morris Brown College

. Coordinated the integration of a new Administrative software

system; Coordinated/ assisted in the upgrade of infrastructure

from Ethernet to fiber and installation of Cisco HUBS and

Switches campus-wide. Coordinated and attended Oracle Training

for DB administrator. Assisted in the installation of a HP9000

and the upgrade of all network computers on campus.

Education:

Bachelor of Science: Business Management Information System,

Morris College, Sumter, South Carolina

Master of Computer Science: (incomplete)

Clark Atlanta University, Atlanta, Georgia



Contact this candidate